PROJECT- DHOLERA L&T ROAD PROJECT, GUJARAT

Daily Labour Report: Date: 25/10/2020


FEMAL
MALE
NAME OF LABOUR MASON E SUPERVIS TOTAL
SL NO
CONTRACTOR (NOS)
HELPER
HELPER OR (NOS) (NOS) Description of Work Unit Qty. In-Time
(NOS)
(NOS)

Paver blocks Sq.m. 75.00

Fixing of Kerb Stone Rmt. 0.00


1 Green Field 1 5 5 11 8.00 AM

Tree guard Nos. 0.00

Paver blocks Sq.m. 110.00

Fixing of Kerb Stone Rmt. 0.00


MITHAN
2 6 11 1 18 8.00 AM
CONSRTUCTION

Paver blocks Sq.m. 90.00


Fixing of Kerb Stone Rmt. 0.00
3 ANASAL HAQUE 5 8 1 14 8.00 AM
Tree guard Nos. 0.00

Total 12 24 5 2 43
AT
Date: 25/10/2020

Out-Time Remarks

03 Heads work in LnT's


06.00 PM supply,M1-H7 for paver
blocks fixing(MPC-1).

04(M1-H3) Heads work in


LnT's supply,M5-H8 for paver
08.00 PM blocks fixing(MPC-1& Cycle
track).

03 Heads work in LnT's


08.00 PM supply,M5-H4 for paver
blocks fixing(MPC-1).