You are on page 1of 2

Direction:

Layout(attach
Drawing
Comments: Initiator:
TPL/Subcontractor
TPL Name
Sign & TATA
N

Engineer
drewtng Subcontractor
Modhu Name: Site
Nature
Comments: Mech Name
Sign & Name
part
In-charge drawing): of
work: Location &
be
Detail
EXCAVATION
APPROVAL
SCHEME
Trench of
Comments: charge
Care TPLElectrical In Name
Sign &
are
Excavation:

of
excavation
Ex
Comments: Plumb/fire
chargeTPL In NameSign & TPL- FS
tocavaion
EleenAal
Eginei. be
highlighted

Comments: In-charge
TPL MEP Name
Sign &
Oplas ir5 East.,

bae
Soy
Excavation
2. 1, Ks,
Comments: In-charge
TPL P&M Name
Sign & 4. 3.requirements:
filing.
Vertical protected
HardEntry/Exitmeter1.8 Soil A
MAXIMUM oY
barricading dumping
h)
with tofrom
Horizontal pit andSLOPE
double the
to with vehicle
Inchatge
TXL Ciýil Name
Sign & be edge
Commgb OF
layer
TypeSoil C doneguardrails Date:
movement S:38rm
of 1.5:1 required:
Duration
|4 Time:
h excavation
witsafety (HORIZONTAL: PROJECTS
TATA
caution catch be to
Degrees34
provided pishould
t.
Name
Sign &
signboards net.
Comments: 1½:1 be
VERTICAL).
HSE and ensured Simplify.Create
In-charge slopes
only
to day
Lea & be after

gzoP
NORTH

EAST

WEST

neoDUcnON ARE

SOUTH