a.The angular velocity w;

The brake horsepower can be computed from ;

b.overall efficiency;

we have to find each

in order to have diesel our H value is; 19000btu/lbm


c.

fuel consumption per hour is 15,7 while engine speed is 800 rpm.

1.2

Tension in the Fast line, Ff = W/E+n

a) For 6 = Ff = 500000/(0.874+6) = 95.347 lbf

b) For 8 = Ff = 500000/(0.841+8) = 74.316 lbf

c) For 10 = Ff = 500000/(0.810+10) = 61.728 lbf

d) For 12 = Ff = 500000/(0.770+12) = 54.113 lbf

1.3
W=200000lbf

pi=800hp

The power efficiency for ten lines (n=10) is 0.810=E (from the table 1.2 of the course book).

a) The tension in the fast line is


Ff=W/En=200000 lbf / (0.810*10) = 24.691 lbf

b) The maximum hook horsepower available is


Ph=E*pi=0.810(800) = 648 hp

c) The maximum hoisting speed is


vb=Ph/W=[648 hp((33000 ft-lbf/min)/hp)] / 200000 lbf = 106.92 ft/min

d) The actual derrick load is


Fd=[(1+E+En)/En]W=[(1+0.810+8.1)/(0.810*10)](200000)=422691 lbf

e) The maximum equivalent derrick load is given by


Fde=[(n+4)/n]W=[(10+4)/10] (200000)=280000 lbf

f) The derrick efficiency factor is


Ed=Fd/Fde=244691/280000=0.874

1.6

a. power efficiency is 0,810 for n = 10;


b. the maximum hook hp available is;

c. the max. hoisting speed is;

d. the actual derrick load is ;

e.the maximum equivalent load is;

f.the derrick efficiency factor is;

1.10

Fs=50000 lbf

At second condition;
1.12

a. The decrease in the suction pit is;

Pump factor;

b. The Formula of pump factor is;

=0,82
s

c.

1.15

a. the displaced volume with one stroke is;

internal diameter is 4,276 in. for 5 in. 19,5-lbm/ft drillpipe

the total internal volume of the drillstring is;

b. 4500 strokes needed for entire circulation.

c.
1.18

cost per unit depth

cost of bit

fixed operating cost

rotating time during the bit run

trip time

total time

Bit B gives the lowest cost.

1.20

Fishing operation

Operating cost = (500$/hr)*20hr = 10000$

Pipe recovered = (30$/ft)*200ft = 6000$

10000 6000 = 4000$

Redrill well

Sidetrack cost = (150$/ft)*200ft = 30000$

Abodoning the well = (5$/ft)*200ft = 1000$

30000+1000 = 31000$

Fishing is the best aternative at 50$/ft