Professional Documents
Culture Documents
HazwoperFirstResponderTechnician/8hours
HazwoperFirstResponderTechnician/24hours
HazardCommunications(29CFR1910.1200(h))
PleaseNote:
PersonalProtectiveEquipment(SSQ#21&22)
SafetyEnvironmentalManagementSystem
ConfinedSpaceEntry(29CFR1910.146(g))
(29CFR1910.38(e),233CFR146.105140)
(46CFR10.205(g),29CFR1910.157(g)(1))
Traininglistedhereiseither:
NORM(NaturallyOccurringRadioactive
HazwoperFirstResponderAwareness
HearingConservation(29CFR1910.95)
Rigging/MaterialHandling(APIRP2D)
1)Specificallyassisnedtoapositionper
(29CFR1910.134(k),33CFR142.39)
ScaffoldBuilderCompetentPerson
(DOT49CFR171.8,DOTHM126F)
regulation;
HazwoperIncidentCommander
(29CFR1910.147,33CFR142.90)
FallProtection(29CFR1926.503)
HazwoperTechnician/40hour
ElectricalSafetyNonqualified
2)Stronglyinferred,byregulation,asbeing
HazwoperSupervisor/8hour
ProductionSafetySystems/T2
(APIRPT1,APIRP75,7.2.1,a)
CranesA(APIRP2DOffshore)
HotWork(29CFR1910.252)
EmergencyEvacuationPlan
requiredforaposition;or
ElectricalSafetyQualified
AccesstoMedicalRecords
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
HSEOffshoreOrientation
HM126Transportation
MarineTrashandDebris
(SEMS)(30CFRPart250)
3)Commonlyacceptedbyindustryasbeing
(30CFR250,SubpartO)
RespiratoryProtection
(29CFR1910.331335)
(29CFR1910.269301)
(29CFR1910.1020(g))
IncipientFireFighting
requiredforaposition.
(29CFR1910.132(F))
(NTLNo.2002G13)
(29CFR1910.28)
Lockout/Tagout
ThismatrixisintendedtocoverRegulatoryRequired
training(basedonthecriteriaabove).ItisNOT
Materials)
intendedtoencompassorreplaceEmployerRequired
orCustomerRequired training.
Positions USCG BOEM OSHA OSHA BOEM OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA DOT OSHA OSHA OSHA OSHA BOEM OSHA BOEM OSHA OSHA OSHA Total
AsbestosAbatement X X X X X X X X X 9
AirConditioning&Heaters X X X X X X X X X 9
Boiler/Tuberepair X X X X X X X X X X X 11
Casingcrew/Pickup&Laydown X X X X X X X X X X X 11
CathodicProtection X X X X X X 6
Cementing X X X X X X X X X X 10
CoiledTubing/Snubbing X X X X X X X X X X X 11
Communications/Scada X X X X X X X 7
Completion/Stimulation X X X X X X X X X 9
Compressor/Turbine X X X X X X X X X X 10
ConfinedSpaceEntry X X X X X X X X X X X X 12
ContractOperator X X X X X X X X X X X X X 13
ChemicalCorrosionControl X X X X X X X X X X X 11
CraneOperator X X X X X X X X X X X 11
CraneServices X X X X X X X X X X X X 12
Demolition X X X X X X X X X 9
DirectionalDrilling/LWD/MWD X X X X X X X X 8
Diving/ROV X X X X X X X X X 9
Drilling/WorkoverContractor X X X X X X X X X X 10
DrillingFluids X X X X X X X X X X 10
DrillingSpecialtyServices X X X X X X X X X 9
EnvironmentalServices X X X X X X X X X X X X X X X X 16
FireandGasInspection X X X X X X X X X X X X 12
FireWatch X X X X X X X X X X 10
Flarerepair X X X X X X X X X X X 11
GeneralContractor/Construction X X X X X X X X X X 10
I&E X X X X X X X X X X X X 12
Inspection,Crane X X X X X X X X X X X 11
Inspection,Hydrotesting X X X X X X X X X X X 11
Inspection,Tanks X X X X X X X X X X X X 12
Inspection,Xray/NonDestructiveTesting X X X X X X X X X X 10
DRAFT DRAFT
rev2 28Aug2011 rev2 28Aug2011
SEMS Tool - Regulatory Mandated Training - Production
Role-Specific Regulatory-Mandated Safety Training for GOM Operations Contractors
MandatedSafetyTraining
HazwoperFirstResponderTechnician/8hours
HazwoperFirstResponderTechnician/24hours
HazardCommunications(29CFR1910.1200(h))
PleaseNote:
PersonalProtectiveEquipment(SSQ#21&22)
SafetyEnvironmentalManagementSystem
ConfinedSpaceEntry(29CFR1910.146(g))
(29CFR1910.38(e),233CFR146.105140)
(46CFR10.205(g),29CFR1910.157(g)(1))
Traininglistedhereiseither:
NORM(NaturallyOccurringRadioactive
HazwoperFirstResponderAwareness
HearingConservation(29CFR1910.95)
Rigging/MaterialHandling(APIRP2D)
1)Specificallyassisnedtoapositionper
(29CFR1910.134(k),33CFR142.39)
ScaffoldBuilderCompetentPerson
(DOT49CFR171.8,DOTHM126F)
regulation;
HazwoperIncidentCommander
(29CFR1910.147,33CFR142.90)
FallProtection(29CFR1926.503)
HazwoperTechnician/40hour
ElectricalSafetyNonqualified
2)Stronglyinferred,byregulation,asbeing
HazwoperSupervisor/8hour
ProductionSafetySystems/T2
(APIRPT1,APIRP75,7.2.1,a)
CranesA(APIRP2DOffshore)
HotWork(29CFR1910.252)
EmergencyEvacuationPlan
requiredforaposition;or
ElectricalSafetyQualified
AccesstoMedicalRecords
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
(29CFR1910.120(q)(6)(iii))
HSEOffshoreOrientation
HM126Transportation
MarineTrashandDebris
(SEMS)(30CFRPart250)
3)Commonlyacceptedbyindustryasbeing
(30CFR250,SubpartO)
RespiratoryProtection
(29CFR1910.331335)
(29CFR1910.269301)
(29CFR1910.1020(g))
IncipientFireFighting
requiredforaposition.
(29CFR1910.132(F))
(NTLNo.2002G13)
(29CFR1910.28)
Lockout/Tagout
ThismatrixisintendedtocoverRegulatoryRequired
training(basedonthecriteriaabove).ItisNOT
Materials)
intendedtoencompassorreplaceEmployerRequired
orCustomerRequired training.
Positions USCG BOEM OSHA OSHA BOEM OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA DOT OSHA OSHA OSHA OSHA BOEM OSHA BOEM OSHA OSHA OSHA Total
Insulation X X X X X X X X X X 10
LeadAbatement X X X X X X X X X 9
MeterProving X X X X X X X X X 9
MudLogging X X X X X X X X X X 10
Painting/Blasting/Coating X X X X X X X X X X X 11
Perforation X X X X X X X X X X 10
PestControl X X X X X X X X 8
Pilot X X X X 4
PipelineConstruction X X X X X X X X X 9
ProductionChemicals X X X X X X X X X X X 11
ProductionServices X X X X X X X X X X X X 12
Rigger X X X X X X X X X X 10
Roustabouts/ContractLabor X X X X X X X X X X 10
HSEConsulting&Training X X X X X X X X X X X X X X X X X 17
Scaffolding X X X X X X X X X X X 11
SpillResponse X X X X X X X X X X X X X X X X 16
Survey X X X X X X X 7
Tank,VesselCleaning X X X X X X X X X X X X 12
Tower,Processing X X X X X X X X X 9
TransportationAircraft X X X X X X X X X 9
TransportationMarine X X X X X X X X X 9
TubularInspection&Coatings X X X X X X X X X X X 11
Valve,Control X X X X X X X X X X X 11
Valve,Safety/Relief X X X X X X X X X X X 11
WasteDisposal X X X X X X X X X X X X X X X X 16
Welding,Contractors X X X X X X X X X X X 11
WellLogging/Wireline X X X X X X X X X X 10
Wellheads X X X X X X X X X 9
Swabbing/Slickline X X X X X X X X X X 10
Nippleup/downServices;BOPtesting X X X X X X X X X 9
RentalsToolswithOperator X X X X X X X X X 9
VesselRepair X X X X X X X X X X 10
Fracture/Stimulation X X X X X X X X 8
total 64 64 64 2 2 2 3 63 5 58 3 3 3 3 3 1 54 8 11 54 18 11 63 63 7 18 8 2
DRAFT DRAFT
rev2 28Aug2011 rev2 28Aug2011