You are on page 1of 2

SEMS Tool - Regulatory Mandated Training - Production

Role-Specific Regulatory-Mandated Safety Training for GOM Operations Contractors


MandatedSafetyTraining

HazwoperFirstResponderTechnician/8hours

HazwoperFirstResponderTechnician/24hours
HazardCommunications(29CFR1910.1200(h))
PleaseNote:

PersonalProtectiveEquipment(SSQ#21&22)
SafetyEnvironmentalManagementSystem

ConfinedSpaceEntry(29CFR1910.146(g))

(29CFR1910.38(e),233CFR146.105140)

(46CFR10.205(g),29CFR1910.157(g)(1))
Traininglistedhereiseither:

NORM(NaturallyOccurringRadioactive
HazwoperFirstResponderAwareness

HearingConservation(29CFR1910.95)

Rigging/MaterialHandling(APIRP2D)
1)Specificallyassisnedtoapositionper

(29CFR1910.134(k),33CFR142.39)

ScaffoldBuilderCompetentPerson
(DOT49CFR171.8,DOTHM126F)
regulation;

HazwoperIncidentCommander

(29CFR1910.147,33CFR142.90)
FallProtection(29CFR1926.503)

HazwoperTechnician/40hour
ElectricalSafetyNonqualified
2)Stronglyinferred,byregulation,asbeing

HazwoperSupervisor/8hour

ProductionSafetySystems/T2
(APIRPT1,APIRP75,7.2.1,a)
CranesA(APIRP2DOffshore)

HotWork(29CFR1910.252)
EmergencyEvacuationPlan
requiredforaposition;or

ElectricalSafetyQualified
AccesstoMedicalRecords

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

HSEOffshoreOrientation
HM126Transportation
MarineTrashandDebris

(SEMS)(30CFRPart250)
3)Commonlyacceptedbyindustryasbeing

(30CFR250,SubpartO)

RespiratoryProtection
(29CFR1910.331335)

(29CFR1910.269301)
(29CFR1910.1020(g))

IncipientFireFighting
requiredforaposition.

(29CFR1910.132(F))
(NTLNo.2002G13)

(29CFR1910.28)
Lockout/Tagout
ThismatrixisintendedtocoverRegulatoryRequired
training(basedonthecriteriaabove).ItisNOT

Materials)
intendedtoencompassorreplaceEmployerRequired
orCustomerRequired training.

Positions USCG BOEM OSHA OSHA BOEM OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA DOT OSHA OSHA OSHA OSHA BOEM OSHA BOEM OSHA OSHA OSHA Total
AsbestosAbatement X X X X X X X X X 9
AirConditioning&Heaters X X X X X X X X X 9
Boiler/Tuberepair X X X X X X X X X X X 11
Casingcrew/Pickup&Laydown X X X X X X X X X X X 11
CathodicProtection X X X X X X 6
Cementing X X X X X X X X X X 10
CoiledTubing/Snubbing X X X X X X X X X X X 11
Communications/Scada X X X X X X X 7
Completion/Stimulation X X X X X X X X X 9
Compressor/Turbine X X X X X X X X X X 10
ConfinedSpaceEntry X X X X X X X X X X X X 12
ContractOperator X X X X X X X X X X X X X 13
ChemicalCorrosionControl X X X X X X X X X X X 11
CraneOperator X X X X X X X X X X X 11
CraneServices X X X X X X X X X X X X 12
Demolition X X X X X X X X X 9
DirectionalDrilling/LWD/MWD X X X X X X X X 8
Diving/ROV X X X X X X X X X 9
Drilling/WorkoverContractor X X X X X X X X X X 10
DrillingFluids X X X X X X X X X X 10
DrillingSpecialtyServices X X X X X X X X X 9
EnvironmentalServices X X X X X X X X X X X X X X X X 16
FireandGasInspection X X X X X X X X X X X X 12
FireWatch X X X X X X X X X X 10
Flarerepair X X X X X X X X X X X 11
GeneralContractor/Construction X X X X X X X X X X 10
I&E X X X X X X X X X X X X 12
Inspection,Crane X X X X X X X X X X X 11
Inspection,Hydrotesting X X X X X X X X X X X 11
Inspection,Tanks X X X X X X X X X X X X 12
Inspection,Xray/NonDestructiveTesting X X X X X X X X X X 10

DRAFT DRAFT
rev2 28Aug2011 rev2 28Aug2011
SEMS Tool - Regulatory Mandated Training - Production
Role-Specific Regulatory-Mandated Safety Training for GOM Operations Contractors
MandatedSafetyTraining

HazwoperFirstResponderTechnician/8hours

HazwoperFirstResponderTechnician/24hours
HazardCommunications(29CFR1910.1200(h))
PleaseNote:

PersonalProtectiveEquipment(SSQ#21&22)
SafetyEnvironmentalManagementSystem

ConfinedSpaceEntry(29CFR1910.146(g))

(29CFR1910.38(e),233CFR146.105140)

(46CFR10.205(g),29CFR1910.157(g)(1))
Traininglistedhereiseither:

NORM(NaturallyOccurringRadioactive
HazwoperFirstResponderAwareness

HearingConservation(29CFR1910.95)

Rigging/MaterialHandling(APIRP2D)
1)Specificallyassisnedtoapositionper

(29CFR1910.134(k),33CFR142.39)

ScaffoldBuilderCompetentPerson
(DOT49CFR171.8,DOTHM126F)
regulation;

HazwoperIncidentCommander

(29CFR1910.147,33CFR142.90)
FallProtection(29CFR1926.503)

HazwoperTechnician/40hour
ElectricalSafetyNonqualified
2)Stronglyinferred,byregulation,asbeing

HazwoperSupervisor/8hour

ProductionSafetySystems/T2
(APIRPT1,APIRP75,7.2.1,a)
CranesA(APIRP2DOffshore)

HotWork(29CFR1910.252)
EmergencyEvacuationPlan
requiredforaposition;or

ElectricalSafetyQualified
AccesstoMedicalRecords

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

(29CFR1910.120(q)(6)(iii))

HSEOffshoreOrientation
HM126Transportation
MarineTrashandDebris

(SEMS)(30CFRPart250)
3)Commonlyacceptedbyindustryasbeing

(30CFR250,SubpartO)

RespiratoryProtection
(29CFR1910.331335)

(29CFR1910.269301)
(29CFR1910.1020(g))

IncipientFireFighting
requiredforaposition.

(29CFR1910.132(F))
(NTLNo.2002G13)

(29CFR1910.28)
Lockout/Tagout
ThismatrixisintendedtocoverRegulatoryRequired
training(basedonthecriteriaabove).ItisNOT

Materials)
intendedtoencompassorreplaceEmployerRequired
orCustomerRequired training.

Positions USCG BOEM OSHA OSHA BOEM OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA OSHA DOT OSHA OSHA OSHA OSHA BOEM OSHA BOEM OSHA OSHA OSHA Total
Insulation X X X X X X X X X X 10
LeadAbatement X X X X X X X X X 9
MeterProving X X X X X X X X X 9
MudLogging X X X X X X X X X X 10
Painting/Blasting/Coating X X X X X X X X X X X 11
Perforation X X X X X X X X X X 10
PestControl X X X X X X X X 8
Pilot X X X X 4
PipelineConstruction X X X X X X X X X 9
ProductionChemicals X X X X X X X X X X X 11
ProductionServices X X X X X X X X X X X X 12
Rigger X X X X X X X X X X 10
Roustabouts/ContractLabor X X X X X X X X X X 10
HSEConsulting&Training X X X X X X X X X X X X X X X X X 17
Scaffolding X X X X X X X X X X X 11
SpillResponse X X X X X X X X X X X X X X X X 16
Survey X X X X X X X 7
Tank,VesselCleaning X X X X X X X X X X X X 12
Tower,Processing X X X X X X X X X 9
TransportationAircraft X X X X X X X X X 9
TransportationMarine X X X X X X X X X 9
TubularInspection&Coatings X X X X X X X X X X X 11
Valve,Control X X X X X X X X X X X 11
Valve,Safety/Relief X X X X X X X X X X X 11
WasteDisposal X X X X X X X X X X X X X X X X 16
Welding,Contractors X X X X X X X X X X X 11
WellLogging/Wireline X X X X X X X X X X 10
Wellheads X X X X X X X X X 9
Swabbing/Slickline X X X X X X X X X X 10
Nippleup/downServices;BOPtesting X X X X X X X X X 9
RentalsToolswithOperator X X X X X X X X X 9
VesselRepair X X X X X X X X X X 10
Fracture/Stimulation X X X X X X X X 8

total 64 64 64 2 2 2 3 63 5 58 3 3 3 3 3 1 54 8 11 54 18 11 63 63 7 18 8 2

DRAFT DRAFT
rev2 28Aug2011 rev2 28Aug2011

You might also like