You are on page 1of 2

Atlas Copco Exploration Products

Swellex Spartan

Swellex Spartan is making its mark in the industry. The Challenge


Our intent is to include an additional
The quality and reliability of the Swellex bolts is a phase consisting of the reinforcement
well known fact. The Spartan has the same quality of the walls and roof of the galleries, in
areas where the security is not totally
assurance as any other Swellex bolt on the market. guaranteed. Previously there was no
The pull test results obtained at AYMAR, S.A.U. is need for reinforcement as the rooms
were very stable said Lluis Garca
evidence of that. The 6% elongation that you get with Muoz, Technical Director, AYMAR
the Spartan bolt, is all that was needed for AYMAR. S.A.U.
What are we looking for in rock Problematic areas
support.... AYMAR intend to include an additional
The safest reliable and cost phase consisting in the reinforcement
efficient solution providing of the walls and roof of the galleries in
maximum quality and those areas in which the security is
productivity. The viability and not totally guaranteed. Previously, there
reliability of the rock bolts is a was no need for reinforcing the walls
major component in choosing or roofs as the layers of mineral had
which product will meet the very good conditions and the rooms
approval of the mine. were very stable, without faults or
discontinuities. But, in a very near
AYMAR, S.A.U. future there will be layers affected by
AYMAR, S.A.U. is a company dedicated faults, blocks or simple breackages.
to the mining and treatment of white For this reason, the decision was made
marble aggregates with a wide history to reinforce these problematic areas.
of 75 years. This company owns
marble mines in Montseny Mountain
Customer
AYMAR, S.A.U.
and a treatment plant in Sant Celoni In conclusion
(Barcelona). It started as a family With the tecnical support of Atlas

Copyright 2011, Atlas Copco Craelius AB. Any unauthorised use or copying of the contents or any part is prohibited.
Challenge company with the philosophy of Copco Spains aftermarket team, bolts
Reinforcement of the walls and roof of the gal- giving the maximun quality and were installed in a wall, with and
leries areas affected by faults, blocks or simple productivity to its customers. This without face plates. Satisfactory pull
breackages.
approach allowed the company to grow tests were conducted.
Our Solution and expand into other areas such as The results confirmed the efficiency
Swellex Spartan SP24, L= 3, 4 & 6m. building materials, chemical industry of the Swellex rock reinforcement
and paint. products. AYMAR S.A.U. decided that
Results / Benefits the Swellex bolts were the perfect
The efficiency, speed, economic approach The challenge ahead solution for the mentionned conditions.
using the Swellex Spartan series of rock bolts
One of the mines AYMAR owns is the This a case where the Swellex
resulted in a high degree of customer satisfac-
tion.
XAUXA mine, located in the north of Spartan bolt truly shines, offering a
Barcelona in the Montseny mountain. very economical solution to challenging
First they used to extract the marble conditions with no compromise in
as an open pit mine. Today, with performance or qualitysaid Chris
environmental conditions and Cranford, Product Line Manager, Rock
regulations they operate underground Reinforcement.
mines with the so called rooms and
pillar method.

General view of the


Mrsta, Sweden. April 2013

underground marble
quarries in Sant Celoni
(Barcelona).
6991 1800 01

Atlas Copco Geotechnical Drilling and Exploration


www.atlascopco.com

You might also like