45000

45 5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 45.00


6.00 m
2.0t-27.6t 2.00 2.00 2.00 2.00 2.00 1.80 1.47 1.22 1.00 t
4.0t-14.3t 4.00 4.00 3.79 2.72 2.07 1.64 1.34 1.11 0.90 t

5.00 10.00 15.00 20.00 25.00 30.00 35.00 40.00 m


2.0t-30.4t 2.00 2.00 2.00 2.00 2.00 2.00 1.67 1.40 t
4.0t-16.0t 4.00 4.00 4.00 3.10 2.38 1.90 1.55 1.30 t

5.00 10.00 15.00 20.00 25.00 30.00 35.00 m


2.0t-32.3t 2.00 2.00 2.00 2.00 2.00 2.00 1.80 t
4.0t-17.1t 4.00 4.00 4.00 3.35 2.58 2.06 1.70 t

5.00 10.00 15.00 20.00 25.00 30.00 m


2.0t-33.4t 2.00 2.00 2.00 2.00 2.00 2.00 t
4.0t-18.0t 4.00 4.00 4.00 3.35 2.74 2.20 t

5.00 10.00 15.00 20.00 25.00 m


2.0t-34.1t 2.00 2.00 2.00 2.00 2.00 t
4.0t-18.8 t 4.00 4.00 4.00 3.75 2.90 t

Anchorages
S23 >98.5m Please consult us.
98.5m
86.5m
74.5m
59.5m
44.5m
30m

22.65m

37.65m

57.65m

67.55m

79.65m
B115
H(m)
Hoisting mechanism Rope length
27.8
2.5m

8
3m

0~20 0~40
24.8 2 1 280m
11KW
28.4 21.8 15LVF10 0~10 0~20 >280m
25.4 18.8 30 7 4 2

22.4 15.8 27.5 6 0~30 0~60

25 5 1.15m 20LVF10 2 1 15KW 530m


19.4 0~15 0~30
>530m
16.4
22.5 4 4 2

13.4
20 3
17.5 2 Trolleying mechanism Slewing mechanism
0.15m

1
0.15m
7.5m

9m

BE2448 0-40 2.4kW RVF4 0~0.8r/min 4KW


F1 F2
Power supply 380V(5%) 50Hz Power consumption 22KVA