The document contains a list of items and their costs for construction work including surveying, excavation, earthworks, drainage, and road works. It estimates excavating over 594 cubic meters of unsuitable soil, filling 1670 cubic meters of gravel for roads, grading and compacting subbases, installing drainage pipes, and adding an aggregate surface to access roads, with a total estimated cost of over 58 million.
The document contains a list of items and their costs for construction work including surveying, excavation, earthworks, drainage, and road works. It estimates excavating over 594 cubic meters of unsuitable soil, filling 1670 cubic meters of gravel for roads, grading and compacting subbases, installing drainage pipes, and adding an aggregate surface to access roads, with a total estimated cost of over 58 million.
The document contains a list of items and their costs for construction work including surveying, excavation, earthworks, drainage, and road works. It estimates excavating over 594 cubic meters of unsuitable soil, filling 1670 cubic meters of gravel for roads, grading and compacting subbases, installing drainage pipes, and adding an aggregate surface to access roads, with a total estimated cost of over 58 million.
1 Surveying the existing topography and established the new designed elevation item 700000 700,000 2 Allow cut to spoil for unsuitable soil to suitable cross and longitudinal slope of 0.15x 3.6x 1100m and compact the 594 m3 7000 4,158,000 surface for receiving imported material for the service roads 3 Allow cut to spoil for vegetated soil of 0.1x 3.6x 750m and compact the surface for receiving imported material for the 270 m3 4000 1,080,000 access road 4 Allow for earth fill of gravel material for service roads thickness of 300mm 1670 m3 22000 36,740,000 5 Grading, shaping, watering and compaction of the sub base item 5,500,000 1 Supply and fix 30mm stainless steel drainage pipe 10 No 2 Trench excavation 400 x 300x 3600 for each pipe concrete blinding and Item 2,000,000 formwork for hunching to allow for drainage pipe construction 3 Allow for filling 25mm aggregate to access road to the thickness not item 4,000,000 exceeding 150mm.