2 Earth Works
Clear the pipeline route of all shrubs and bushes 1m wide and
2.1 remove from site SM 17600
Excavate trench average width 0.6m and depth n.e 1.0m over
2.2 medium ground. CM 5184
Sub-Total
3 Pipe Laying
Supply, Lay, and joint 90mm dia. HDPE bar10 Pipe In trench,
3.1 test, and commission for rising main. M 4,450
Supply, Lay, and joint 75mm dia. HDPE bar10 Pipe In trench,
3.2 test, and commission for rising main. M 1,830
Supply, Lay, and joint 63mm dia. HDPE bar10 Pipe In trench,
3.3 test, and commission for rising main. M 2,390
Supply, Lay, and joint 50mm dia. HDPE bar10 Pipe In trench,
3.4 test, and commission for rising main. M 1,025
Supply, Lay, joint 40mm dia. HDPE bar10 Pipe In trench, test,
and commission for connection to communial water points as
3.5 directed by the site enginner M 1,090
Sub-Total
Add 3% for plumbing work L.s
Add 3% for fittings L.s
Sub-total
4 Back filling
4.1 Back filling soft materials M 10800
Sub-Total
5 Junction chambers
Supply materials,transport to site and construct 1m x1m x 1m
5.1 Junction/control chambers with locked steel cover No 10
Sub-Total
TOTAL
1.1.1 Supply materials, transport to site and construct strip foundation CM 0.95
1.1.10 Ditto and plaster internal surfaces with 25mm thick c/c screed. SM 36.4
1.1.11 Provide pvc and GI fittings L.s 1
1.1.12 Ditto and plaster external surfaces with 25mm thick c/c screed. SM 36.4
Sub-Total
1.2 EXTRA OVER ITEMS
Supply materials fabricate and fix on walling a barglar proof
1.2.1 door of size 2100mm x 900mm. No 1
Supply materials fabricate and fix on walling a barglar proof
1.2.2 window of size 1200mm x 900mm. No 1
1.2.3 Allow for painting as directed by the Engineer L.s 1
Sub-Total
Total for 4No.Troughs
TOTAL FOR ITEM 4