BOQ for the Construction of RCC Elevated water tank

ELEVATED WATER TANK CAPACITY 40 CUM (4x4x2.5)m


Unit Cost Total Cost in
Item Description Unit QTY
in USD USD
A. SUBSTRUCTURES
1 Excavation and earth work
Allow clearing the site from any debris, trees, roots etc.Fill hollows and
1.1 M2 17.64
level them.
Excavate the Footing trench of Column foundation 1.5m width x 1.5m
1.2 M3 10.8
length, 1.2m depth. 4nos.
Plain concrete in 10 cm thick blinding layer (1:4:8 mix) under the column 3
1.3 M 0.9
foundation footings.
Return, backfill, livelling and ram part of the excavated soil around the 3
1.4 M 1
foundation.
2 Concrete Work
Reinforced concrete footings (1:2:4 mix) (1.5x1.5x1) , with 4NO. Y14 re- 3
2.1 M 9
bars & R8 links @ 150mm c/c . (8 nos)

B. SUPERSTRUCTURE
3 Concrete work

Construct RCC Columns of 400mm square columns with mix ratio 1:2:4
3
3.1 spaces at 4m. The columns shall be reinforced with 4Y14 & 4Y12 steel bars M 3.2
each with Y8 links spaced at 250mm.There shall be 4 columns of 5.0m hight.

Construct RCC beam of 400mmx400mm with mix ratio 1:2:4 . The beam
3
3.2 shall be reinforced with 4 Y14mm dia steel bars each with Y8 links spaced at M 7.68
250mm. The beam shall cover a length of 48m.
Construct RCC slabs of 20cm thick at Middle ,12cm thick at top roof,
3.3 reinforced with dia 12mm bars as main reinforcement 150mm c/c and dia M3 5.6448
10mm bars as secondary reinforcement 15 cm c/c. concrete mix 1:2:3
Construct RCC Wall of 20cm thick, (2.5m hight) reinforced with dia 12mm 3
3.4 M 8.32
bars 150mm c/c, concrete mix 1:2:4
4 Finishing and Providing ladder $ -
Apply two coats for plastering in cement -sand mortar of 1:3 to all elevation
4.1 column, beams and slab (water proof cement should be used inside M2 82
plastering )
Apply spry paint of cement+ gross paint for outside wall faces of tank wall, 2
4.2 M 46
beams, and columns
4.3 Supply and fix fabricated steel ladder (4mm thick steel S (8m height) NO 1
A Sub-total ( Elevated tank) $ -
$ -
B) Pipeline works and Water point
Provide and Install Inlet and out G.I pipe Class B daimeter 2" for an
1.1 Lumsum 1
elevated new tank (elbew, T connections 2")

Supply and fix high pressurized PVC pipes daimeter 2" from th elevated new
1.2 M 660
water tank to water Point (Koisk) including fittings (elbew, T connections 2")

Excavation of trench for the pipe from the well from tank to kiosk. (0.5m
1.3 M 660
deep) and returning excavated soil.

Construct Block concrete Water point of 2.2mx1.2mx1m with 3 taps on


1.4 each side. the size of the taps should be 1inch. with drainage soak pit, No 3
including painting of the wall & visibility on them.
B Sub-total pipeline & Water point $ -
C) Chain link Fence ( peremeter = 45m)
FENCE: Construct 45m Chainlink fence, 2m heieght, with welded supporting
Circular GI pipe Class B 1.5", 2m above GL, 1m Under GL, including Plain
1.1 Concrete footings, and Lockable double gate Made of angle section frame M 44
and weld mesh, 2m wide and 2m height, Supporting 100mm Dia tube post at
main frame and paint.
C Total cost of Fence (camel) $ -

Grant total (A+B+C) $ -