B. SUPERSTRUCTURE
3 Concrete work
Construct RCC Columns of 400mm square columns with mix ratio 1:2:4
3
3.1 spaces at 4m. The columns shall be reinforced with 4Y14 & 4Y12 steel bars M 3.2
each with Y8 links spaced at 250mm.There shall be 4 columns of 5.0m hight.
Construct RCC beam of 400mmx400mm with mix ratio 1:2:4 . The beam
3
3.2 shall be reinforced with 4 Y14mm dia steel bars each with Y8 links spaced at M 7.68
250mm. The beam shall cover a length of 48m.
Construct RCC slabs of 20cm thick at Middle ,12cm thick at top roof,
3.3 reinforced with dia 12mm bars as main reinforcement 150mm c/c and dia M3 5.6448
10mm bars as secondary reinforcement 15 cm c/c. concrete mix 1:2:3
Construct RCC Wall of 20cm thick, (2.5m hight) reinforced with dia 12mm 3
3.4 M 8.32
bars 150mm c/c, concrete mix 1:2:4
4 Finishing and Providing ladder $ -
Apply two coats for plastering in cement -sand mortar of 1:3 to all elevation
4.1 column, beams and slab (water proof cement should be used inside M2 82
plastering )
Apply spry paint of cement+ gross paint for outside wall faces of tank wall, 2
4.2 M 46
beams, and columns
4.3 Supply and fix fabricated steel ladder (4mm thick steel S (8m height) NO 1
A Sub-total ( Elevated tank) $ -
$ -
B) Pipeline works and Water point
Provide and Install Inlet and out G.I pipe Class B daimeter 2" for an
1.1 Lumsum 1
elevated new tank (elbew, T connections 2")
Supply and fix high pressurized PVC pipes daimeter 2" from th elevated new
1.2 M 660
water tank to water Point (Koisk) including fittings (elbew, T connections 2")
Excavation of trench for the pipe from the well from tank to kiosk. (0.5m
1.3 M 660
deep) and returning excavated soil.