Professional Documents
Culture Documents
Saudi Aramco Inspection Checklist
Saudi Aramco Inspection Checklist
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.
A General Requirements
Schedule Q,
The procedure shall list all inspection schedules for maintaining the
A2 Attachment IV,
quality of the material or equipment.
Para. 5
Schedule Q,
The procedure provides for documentation that the required
A3 Attachment IV,
activities have been performed.
Para. 5
The procedure makes provision for Data concerning handling, storage Schedule Q,
A4 and preservation to be included on the Monthly Materials Attachment IV,
Procurement Status Report as specified in Schedule G. Para. 5
REMARKS:
REFERENCE DOCUMENTS:
Page 1 of 1