Professional Documents
Culture Documents
INSTRUCTIONS: INSTRUCTIONS:
1. Run Lateral Analysis in Allpile, then click [To MS-Excel] button to begin 1. Run Lateral Analysis in Allpile, then click [To MS-Excel] button to begin
the data transfer. the data transfer.
2. Check [Enable Macros] if you are asked while Excel is being opened. 2. Check [Enable Macros] if you are asked while Excel is being opened.
3. After opening this Excel file, press [Update Lateral Data] button to 3. After opening this Excel file, press [Update Vertical Data] button to
upload the transferred data onto the spreadsheet. upload the transferred data onto the spreadsheet.
4. Turn to [Lateral-y] sheet or [Lateral-M] sheet for graphical output. 4. Turn to [Vertical-Qd], [Vertical-Qu], or [Vertical-2Q] sheet for graphical ou
Notes:
1. You can save the file under different file name. But do NOT delete this file: allpile.xls
2. You can customize the format of the graphs if you are familiar with Excel. Make sure each graph is linked to appropriate source
on the [Data] sheet.
3. Do not change the contents on the [Data] sheet.
4 If you want to run a new analysis in Allpile again, you MUST close the Excel program first. Only one Excel program can be opened at any time.
Units:
0 <-- If you want English units, input 0 in the left yellow cell. If you want Metric units, input 1 in the left yellow cell.
If the value in the yellow cell above is 0, all data are in English units.
If the value in the yellow cell above is 1, all data are in Metric (SI) units.
Do not delete data below:
0 * Do NOT change the content in the yellow cells left*
If the value in the yellow cell above is 0, all data are in English units.
If the value in the yellow cell above is 1, all data are in Metric (SI) units.
[To MS-Excel] button to begin
30
Lateral Load, P (kip)
25
20
15
10
0
0 2 4 6 8 10 12 14 16 18 20
Top Deflection, yt (in)
If you click on the chart area, you will print the chart only.
If you click on any cell outside the chart, you will print the entire sheet with chart.
Please go to Print Preview before you print to make sure you have the right selection.
Lateral Load vs Max Moment
30
Lateral Load, P (kip)
25
20
15
10
0
0 50 100 150 200 250 300 350 400
Max Moment in Single Pile, Mmax (kip-ft)
Project Name
If you click on the chart area, you will print the chart only.
If you click on any cell outside the chart, you will print the entire sheet with chart.
Please go to Print Preview before you print to make sure you have the right selection.
Compression Capacity, Qdown (kip)
250
200
150
100
50
0
0 10 20 30 40 50 60 70
Pile Length, L (ft)
If you click on the chart area, you will print the chart only.
If you click on any cell outside the chart, you will print the entire sheet with chart.
Please go to Print Preview before you print to make sure you have the right selection.
60 70
Sheet No.
Uplift Capacity vs Pile Length
Uplift Capacity, Qup (kN)
160
140
120
100
80
60
40
20
0
0 10 20 30 40 50 60 70
Pile Length, L (ft)
If you click on the chart area, you will print the chart only.
If you click on any cell outside the chart, you will print the entire sheet with chart.
Please go to Print Preview before you print to make sure you have the right selection.
Vertical Capacity vs Pile Length
Pile Capacity, Q (kip)
250
Compression Uplift
207
200
181
150 154
137
127
116
100 100
95
71 72 73 73
50 52
32 31
18
9
0 1
0 3
0 10 20 30 40 50 60 70
Pile Length, L (ft)
400 108th Ave NE, Bellevue, WA 98004 Project Location Sheet No.