LATERAL ANALYSIS VERTICAL ANALYSIS

P vs yt and Mmax L vs Qdw and Qup


P yt Mmax L Qdw Qup
2.5 0.63 20.92 5 0.03 0.7
7.5 2.7 73.42 11.11 31.86 3.03
12.5 5.68 140 17.22 71.35 8.91
17.5 9.62 217.5 23.33 72.42 18.27
20 12 260.83 29.44 73.21 30.84
22.5 14.8 306.67 35.56 100 52.09
25 17.8 355.83 41.67 126.86 73.35
47.78 153.71 94.65
53.89 180.6 115.95
60 207.26 137.11

Update Lateral Data Update Vertical Data

INSTRUCTIONS: INSTRUCTIONS:
1. Run Lateral Analysis in Allpile, then click [To MS-Excel] button to begin 1. Run Lateral Analysis in Allpile, then click [To MS-Excel] button to begin
the data transfer. the data transfer.
2. Check [Enable Macros] if you are asked while Excel is being opened. 2. Check [Enable Macros] if you are asked while Excel is being opened.
3. After opening this Excel file, press [Update Lateral Data] button to 3. After opening this Excel file, press [Update Vertical Data] button to
upload the transferred data onto the spreadsheet. upload the transferred data onto the spreadsheet.
4. Turn to [Lateral-y] sheet or [Lateral-M] sheet for graphical output. 4. Turn to [Vertical-Qd], [Vertical-Qu], or [Vertical-2Q] sheet for graphical ou

Notes:
1. You can save the file under different file name. But do NOT delete this file: allpile.xls
2. You can customize the format of the graphs if you are familiar with Excel. Make sure each graph is linked to appropriate source
on the [Data] sheet.
3. Do not change the contents on the [Data] sheet.
4 If you want to run a new analysis in Allpile again, you MUST close the Excel program first. Only one Excel program can be opened at any time.
Units:
0 <-- If you want English units, input 0 in the left yellow cell. If you want Metric units, input 1 in the left yellow cell.
If the value in the yellow cell above is 0, all data are in English units.
If the value in the yellow cell above is 1, all data are in Metric (SI) units.
Do not delete data below:
0 * Do NOT change the content in the yellow cells left*
If the value in the yellow cell above is 0, all data are in English units.
If the value in the yellow cell above is 1, all data are in Metric (SI) units.
[To MS-Excel] button to begin

while Excel is being opened.


te Vertical Data] button to

rtical-2Q] sheet for graphical output.


Lateral Load vs Top Deflection

30
Lateral Load, P (kip)

25

20

15

10

0
0 2 4 6 8 10 12 14 16 18 20
Top Deflection, yt (in)

Graphical Result of AllPile Analysis


Date:
Sheet No.

Do not delete data below:


Top Deflection, yt (in)
Lateral Load, P (kip)
* Do NOT change the content in the yellow cells above*
Printing Notes:

If you click on the chart area, you will print the chart only.

If you click on any cell outside the chart, you will print the entire sheet with chart.

Please go to Print Preview before you print to make sure you have the right selection.
Lateral Load vs Max Moment

30
Lateral Load, P (kip)

25

20

15

10

0
0 50 100 150 200 250 300 350 400
Max Moment in Single Pile, Mmax (kip-ft)

Project Name

Graphical Result of AllPile Analysis

CivilTech Software Sheet No.


Do not delete data below:
Max Moment in Single Pile, Mmax (kip-ft)
Lateral Load, P (kip)

* Do NOT change the content in the yellow cells above*


Printing Notes:

If you click on the chart area, you will print the chart only.

If you click on any cell outside the chart, you will print the entire sheet with chart.

Please go to Print Preview before you print to make sure you have the right selection.
Compression Capacity, Qdown (kip)

Compression Capacity vs Pile Length

250

200

150

100

50

0
0 10 20 30 40 50 60 70
Pile Length, L (ft)

Graphical Result of AllPile Analysis

CivilTech Software Sheet No.


Do not delete data below:
Pile Length, L (ft)
Compression Capacity, Qdown (kip)
* Do NOT change the content in the yellow cells above*
Printing Notes:

If you click on the chart area, you will print the chart only.

If you click on any cell outside the chart, you will print the entire sheet with chart.

Please go to Print Preview before you print to make sure you have the right selection.

60 70

Sheet No.
Uplift Capacity vs Pile Length
Uplift Capacity, Qup (kN)

160

140

120

100

80

60

40

20

0
0 10 20 30 40 50 60 70
Pile Length, L (ft)

Graphical Result of AllPile Analysis

CivilTech Softwarwe Sheet No.


Do not delete data below:
Pile Length, L (ft)
Uplift Capacity, Qup (kN)

* Do NOT change the content in the yellow cells above*


Printing Notes:

If you click on the chart area, you will print the chart only.

If you click on any cell outside the chart, you will print the entire sheet with chart.

Please go to Print Preview before you print to make sure you have the right selection.
Vertical Capacity vs Pile Length
Pile Capacity, Q (kip)

250

Compression Uplift

207
200

181

150 154

137
127
116

100 100
95

71 72 73 73

50 52

32 31
18
9
0 1
0 3
0 10 20 30 40 50 60 70
Pile Length, L (ft)

CivilTech Softwarwe Project Title Date:

400 108th Ave NE, Bellevue, WA 98004 Project Location Sheet No.