You are on page 1of 6

Waste Water Treatment Plant Size optimization

Tesco is a retailer same as like Big Bazaar in India. Currently this project having 5000 sqm Total Gross
area, which consists of

1. Sales Area (which is having Seafood, Deli, Bakery, Produce, other groceries & Toilet).
2. Lease Area for Tenants which is having Restaurant, Food court, jewellery shops etc.
3. Back of house consists of offices, Staff Canteen & Toilet.

BUILDING 3K STORE

GROSS AREA 5000 SQ.M.

SALE AREA SALE AREA 2650 SQ.M.

LEASE AREA GROSS LEASE 1700 SQ.M.

NET LEASE 1205 SQ.M.

PROMOTION 45 SQ.M.

FOOD COURT /RESTAURANT 450 SQ.M.

BACK OF HOUSE GROSS AREA 650 SQ.M.

PARKING OUTDOOR CAR PARKING 180 CARS

MOTORCYCLE PARKING 250 CARS


SITE PLAN
LAYOUT PLAN

MEAT/SEAFOOD FREZEER ROOM


14 SQM 9 SQM

STAFF CANTEEN
& KITCHEN
62 SQM

CHILLED REMOTE TOILET


MODS 28 SQM

MEAT
BAKERY
SEAFOOD
DELI

FOOD
COURT
92 SQM

RESTAURANT
196 SQM

TOILET
28 SQM
RESTAURANT
104 SQM

Actual Water Consumption Calculation per day in for Retail store as per WATER METER READING is 60-80 CUM PER DAY
Vendor Schematic & Plant Layout

Inlet discharge BOD = 800 mg/l


Outlet discharge BOD= 20 mg/l.

`
Capacity of WWTP=65 cu.m

TOP VIEW OF WASTE WATER TREATMENT PLANT ABOVE GROUND.


SECTION VIEW OF WASTE WATER TREATMENT PLANT ABOVE GROUND.

SITE PICTURE OF WASTE WATER TREATMENT PLANT ABOVE GROUND.


WWTP 65 m3 Cost is 30 Lakh rupees.

Grease Trap, Sump pit & Sump Pump Cost is 4.5 Lakh rupees.

Problems:

Is there any opportunity to reduce the WWTP Cost from 30 lakhs to 20 lakhs???
If the possibility is there than what will be the system???