Shipping container as site office – demolition phase

Hazard Control measure

 Make sure the office container is


 Injury, loss of equipment or important already empty
document  No important document left inside or
heavy object inside before demolish.

 Always establish a plan for safe


 Ensure there is no chemical or gases demolishing before doing anything
which could cause potential explosion else

 May cause explosion/fire/flooding


 Make sure all the services lines are
 Gas/ electricity/piping
disconnected and confirmed as
disconnect by licensed person only

 Control assess to structure prior to


and during demolition
 Trainee/experienced operations to
 Instability of structure which is
carry out demolition works and
possible uncontrolled collapse or
continuously asses the structure as
falling debris.
work progress
 Maintain demolition zones with
warning signage attached

 Use personal protective equipment


 Health risk – dust, eye (PPE)
 Provide filter mask, goggle, face shield