Professional Documents
Culture Documents
Company Name: OM SAI INTEX PVT LTD., Activity/Trade: Civil works / Floor Chipping Work
nd th
Address: #9, 2 Floor, 10 Main Road, Jeevan Bhima Nagar, Bangalore-560 075. Office Contact No: 080-41154454
Procedure (in steps) Possible Hazards Control Measures Person who
Risk (Describe what action or procedure will be taken to eliminate or minimise
(Break the job down into steps. Each (Identify the hazards associated with each step. will ensure
Rating the risk of injury or damage. Use the Hierarchy of Controls below as a
step should accomplish some major task Examine each to find possibilities that could lead
guide
this
and be in logical sequence.) to an accident or potential harm arising.) (See
1. Eliminate the Hazard happens
below)
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
Preparation of work environment. Tripping due to obstruction in your path. M Inspect work / walk area for potential slip trip fall obstructions prior to start Civil
Housekeeping of work and remove, if not possible mark with visible tape / flags. Supervisor
Dust hazard.
Keep work area organized and free of surface obstructions during task.
Inform operator in area of ongoing works.
Hand gloves, safety shoe and hard hat will be used as mandatory PPE.
Page: 1
DOC #: OSI-REC-EHS-002.B Rev / Dt:01- 15/12/2017
Prepared by: Pathalapandi M Approved by: Anil N Urs.
Floor Chipping works Electrical shock during the use of breaker. H The Equipment should have service / inspection tag and certified by safety Civil
supervisor with cut/damage free power cable and required plug top. Supervisor &
Injury to person. safety
Operator should be trained to use of the equipment.
Loss of hear due to loud noise during supervisor
breaking. Operator should have hand gloves, dust mask, ear plug and safety goggles
apart from safety shoe and hard hat.
Inhalation of dust.
Break needs to be taken at regular intervals and need have support person
Body pain and ache due to continuous to the operator.
Working.
Barricade and signage with screens to prevent “chips” of concrete striking
Injuring the other persons. fellow workers in the area and inform the coworkers during the work.
Use dust Mask and goggles at all times apart from safety shoe and hard
hat.
Removing the Wastages produced during Cut injury while removing the cut pieces. Use cut / Abrasive resistant gloves and use spades and brushes with pans Civil
the cutting. H to prevent direct contact. Supervisor
Dust Inhalation and entry to eyes
House Keeping / Clean area. Tripping hazards while cleaning work area. Use dust Mask and goggles at all times apart from safety shoe and hard
hat.
Keep work area clear off debris and remove tools / equipments when not in
use to eliminate trip hazards.
Name: _____________________ Signature: _____________ Name: ____________________ Signature: ______________ Name: ____________________ Signature: ______________
Page: 2