Company Name: OM SAI INTEX PVT LTD., Activity/Trade: Civil works / Floor Chipping Work
nd th
Address: #9, 2 Floor, 10 Main Road, Jeevan Bhima Nagar, Bangalore-560 075. Office Contact No: 080-41154454
Procedure (in steps) Possible Hazards Control Measures Person who
Risk (Describe what action or procedure will be taken to eliminate or minimise
(Break the job down into steps. Each (Identify the hazards associated with each step. will ensure
Rating the risk of injury or damage. Use the Hierarchy of Controls below as a
step should accomplish some major task Examine each to find possibilities that could lead
guide
this
and be in logical sequence.) to an accident or potential harm arising.) (See
1. Eliminate the Hazard happens
below)
2. Substitute the material or equipment
3. Isolate the hazard
4. Implement Engineering control
5. Implement Administrative control
6. PPE
Preparation of work environment. Tripping due to obstruction in your path. M Inspect work / walk area for potential slip trip fall obstructions prior to start Civil
Housekeeping of work and remove, if not possible mark with visible tape / flags. Supervisor
Dust hazard.
Keep work area organized and free of surface obstructions during task.
Inform operator in area of ongoing works.

Close work area to prevent entrance of others.


Dust mask will be used apart from hard hat and safety shoe.
Collect materials from store. M/c does not adequate side clearance for Ensure that the hand / fingers do not get jammed in between material by
Handling of the material to be lifted. lifting. H carrying material with hands inside the maximum width of the item carried. Civil
Supervisor
Carrying of Breakers (Inside the tool box) M/c in odd shape to carry. Ensure that they get additional support of personal before lifting.
to the place of Floor Chipping. Discuss with him and then lift the material.
Lifting beyond the capacity of the person may Use the material trolley whenever possible.
lead fall on the foot and muscle, back strain
and leg injury. Try to take assistance if the weight of the material is beyond 20kgs. Do not
make single person manual lift if the weight of the machine is beyond
20kgs.

Training will be given on material handling and PPE uses.

Hand gloves, safety shoe and hard hat will be used as mandatory PPE.

Page: 1
DOC #: OSI-REC-EHS-002.B Rev / Dt:01- 15/12/2017
Prepared by: Pathalapandi M Approved by: Anil N Urs.
Floor Chipping works Electrical shock during the use of breaker. H The Equipment should have service / inspection tag and certified by safety Civil
supervisor with cut/damage free power cable and required plug top. Supervisor &
Injury to person. safety
Operator should be trained to use of the equipment.
Loss of hear due to loud noise during supervisor
breaking. Operator should have hand gloves, dust mask, ear plug and safety goggles
apart from safety shoe and hard hat.
Inhalation of dust.
Break needs to be taken at regular intervals and need have support person
Body pain and ache due to continuous to the operator.
Working.
Barricade and signage with screens to prevent “chips” of concrete striking
Injuring the other persons. fellow workers in the area and inform the coworkers during the work.

Training will be given on power tools safety and PPE use.


Removing the Wastage produced during Cut injury while removing the cut pieces. H Use cut/Abrasive resistant gloves and use spades and brushes with pans Civil
the breaking. to prevent direct contact. Supervisor
Injury to leg.
Use the safety shoe with long pant and long sleeve.
Back strain and muscle strain during the
shifting of material. Do not make single person manual lift if the weight of the material is
beyond 25kgs.
Dust Inhalation and entry to eyes
Load the material into plastic bags (less than 25kgs) and shift the material
to debris yard using the trolley.

Training will be given on material handling and PPE uses.

Use dust Mask and goggles at all times apart from safety shoe and hard
hat.
Removing the Wastages produced during Cut injury while removing the cut pieces. Use cut / Abrasive resistant gloves and use spades and brushes with pans Civil
the cutting. H to prevent direct contact. Supervisor
Dust Inhalation and entry to eyes
House Keeping / Clean area. Tripping hazards while cleaning work area. Use dust Mask and goggles at all times apart from safety shoe and hard
hat.

Keep work area clear off debris and remove tools / equipments when not in
use to eliminate trip hazards.

Cleaning of all the debris after completing the task.


Any changes, additions or deletions made to this SWMS are to be covered with the above personnel and the Principal Contractor.

Prepared by: Verified by: Approved by:

Site Engineer: EHS Person: Project Manager:

Name: _____________________ Signature: _____________ Name: ____________________ Signature: ______________ Name: ____________________ Signature: ______________

Page: 2

DOC #: OSI-REC-EHS-002.B Rev / Dt:01- 15/12/2017


Prepared by: Pathalapandi M Approved by: Anil N Urs.