Detailed Method -Pipe - Calculation of Base Shear
The platform at EI. 150 Gust above the top of the vessel) is a square platform 12 ft. x
12 ft. in plan with handrail around the perimeter. It is assumed that the platform structural
framing will be 8-inches deep (8"/12" = 0.70 sq. ft.l1in. ft.).