I. Persiapan
1 Penyusunan daftar aktivitas Daftar aktivitas disiplin Rotating
Daftar aktivitas disiplin Mechanical & Piping
Daftar aktivitas disiplin Instrument
Daftar aktivitas disiplin Electrical
Daftar aktivitas disiplin Civil
2 Penentuan PIC & Target Rapat seluruh team member
3 Prosedur pengisian format kerja Sosialisasi oleh ketua team
II. Pelaksanaan
A. Engineering Document
1 Engineering Drawing Prosedur evaluasi RE Drawing
Prosedur evaluasi Piping Drawing
Prosedur evaluasi Mechanical Drawing
Prosedur evaluasi Electrical drawing
Prosedur evaluasi Instrument Drawing
Prosedur evaluasi Civil Drawing
2
B. Procedure
1 Receiving Material Procedure Prosedur penerimaan material Pipa
Prosedur penerimaan peralatan Mechanical
Prosedur penerimaan peralatan Rotating
Prosedur penerimaan peralatan Instrument
Prosedur penerimaan peralatan Electrical
Prosedur penerimaan peralatan Civil
2
I. Persiapan
1 Penyusunan daftar aktivitas Daftar Project Specification disiplin Rotating
Daftar Project Specification disiplin Mechanical & Piping
Daftar Project Specification disiplin Instrument
Daftar Project Specification disiplin Electrical
Daftar Project Specification disiplin Civil
2 Penentuan PIC & Target Rapat seluruh team member
3 Prosedur pengisian format kerja Sosialisasi oleh ketua team
II. Pelaksanaan
A. Engineering Document
1 Engineering Drawing Standard Engineering Drawing RE
Standard Engineering Drawing Piping
Standard Engineering Drawing Mechanical
Standard Engineering Drawing Electrical
Standard Engineering DrawingInstrument
Standard Engineering Drawing Civil
2
B. Procedure
1 Receiving Material Procedure Prosedur penerimaan material Pipa
Prosedur penerimaan peralatan Mechanical
Prosedur penerimaan peralatan Rotating
Prosedur penerimaan peralatan Instrument
Prosedur penerimaan peralatan Electrical
Prosedur penerimaan peralatan Civil
2
TOTAL 173
DATASHEET DATASHEET ENG. DRW. PROCEDURE ITP
G1572FD-3U01-40-107-0004 3 By Vendor & EPC
G1572FD-3U01-40-107-0005 3
1
2
2
2
2
2
0
2
1
1
1
1
1
1
1
1
1
8
2
G1572FD-3U04-40-107-0001 1
G1572FD-3U04-40-107-0002 1
3
2
2
2
2
2
2
1
G1572FD-3U05-40-107-0002 2
G1572FD-3U05-40-107-0004 2
G1572FD-3U05-40-107-0010 2
G1572FD-3U05-40-107-0011 1
G1572FD-3U05-40-107-0014 2
G1572FD-3U05-40-107-0015 3
G1572FD-3U05-40-107-0016 2
G1572FD-3U05-40-107-0017 1
G1572FD-3U05-40-107-0001 1
G1572FD-3U06-40-107-0001 2
G1572FD-3U06-40-107-0002 2
G1572FD-3U07-40-107-0001 1
G1572FD-3U08-42-107-0002 4
G1572FD-3U08-42-107-0003 2
1
G1572FD-3U09-42-107-0001 2
G1572FD-3U09-42-107-0002 1
G1572FD-3U09-42-107-0003 1
1
G1572FD-3U10-42-107-0001 3
G1572FD-3U10-42-107-0002 2
G1572FD-3U10-42-107-0003 2
G1572FD-3U10-42-107-0004 3
G1572FD-3U10-42-107-0005 2
G1572FD-3U10-42-107-0006 2
G1572FD-3U10-42-107-0010 3
G1572FD-3U10-42-107-0011 2
G1572FD-3U10-42-107-0012 2
G1572FD-3U10-42-107-0014 2
G1572FD-3U10-42-107-0015 1
G1572FD-3U10-42-107-0016 2
G1572FD-3U10-42-107-0017 2
G1572FD-3U10-42-107-0019 1
G1572FD-3U10-42-107-0020 1
G1572FD-3U10-42-107-0021 1
G1572FD-3U10-42-107-0022 1
G1572FD-3U10-42-107-0023 1
G1572FD-3U10-42-107-0024 1
G1572FD-3U10-42-107-0025 1
G1572FD-3U10-42-107-0026 1
2
2
2
1
2
1
G1572FD-3C02-40-107-0001 1
4
1
1
G1572FD-3C03-40-107-0001 4
4
4
1
1
1
1
1
1
1
1
1
1
4
3
WORKPLAN PENYUSUNAN
PROJECT SPECIFICATION - CALCINER PROJECT
I. Project Specification
1 Centrifugal Pumps for Medium and Light Duty Service Menyusun proj spec ref PLBC, RFCC & ROPP
2 Centrifugal Pumps for Heavy Duty Services Menyusun proj spec ref PLBC, RFCC & ROPP
3 Controlled Volume Pumps Menyusun proj spec ref PLBC, RFCC & ROPP
4 Fire Fighting Water Pump Menyusun proj spec ref PLBC, RFCC & ROPP
5 Centrifugal Type Package Air Compressors Menyusun proj spec ref PLBC, RFCC & ROPP
6 General Purpose Steam Turbines Menyusun proj spec ref PLBC, RFCC & ROPP
7 Steam Turbine Generators Menyusun proj spec ref PLBC, RFCC & ROPP
8 Diesel Engine Generators Menyusun proj spec ref PLBC, RFCC & ROPP
9 Diesel Engine for Fire Fighting Water Pump Menyusun proj spec ref PLBC, RFCC & ROPP
10 Mixer Menyusun proj spec ref PLBC, RFCC & ROPP
11 Centrifugal Fan Menyusun proj spec ref PLBC, RFCC & ROPP
12 Draft Fan Menyusun proj spec ref PLBC, RFCC & ROPP
13 Overhead Crane Menyusun proj spec ref PLBC, RFCC & ROPP
II. Datasheet
A. Equipment Datasheet
1 All Pumps Menyusun datasheet pompa
2 Centrifugal Type Package Air Compressors Menyusun datasheet compressor
3 Steam Turbine Menyusun datasheet steam turbine
4 Diesel Engine Menyusun datasheet diesel engine
5 Mixer Menyusun datasheet mixer
6 Centrifugal Fan Menyusun datasheet centrifugal fan
7 Draft Fan Menyusun datasheet draft fan
8 Overhead Crane Menyusun datasheet overhead crane
B. Process Datasheet
(by Process Eng)
IV. Procedure
1 Procurement Procedure
2 Transportation Procedure
3 Preservation Procedure
4 Receiving Material Procedure
5 Storage & Handling Procedure
6 Site Preparation Procedure
7 Construction Procedure
8 Fabrication Procedure
9 Maintenance & Repair Procedure
10 Inspection Procedure
11 Pre-comm, Commissioning & Start-up Procedure
12 Work Permit Procedure
13 Numbering System Procedure
92 8-Aug 12-Aug 10
3 15-Aug 16-Aug 2
2 17-Aug 19-Aug 3
5 22-Aug 26-Aug 5
PHD/ YS
3 29-Aug 29-Aug 1
19 30-Aug 2-Sep 4
8 5-Sep 6-Sep 2
18 7-Sep 9-Sep 3