Number Of Tests per Month

Materials
Sieve Atterberg
Proctor Test CBR WA Spec. Gravity AIV LAAV FI
analysis Limit

Sub Base

Embankment
Type 1

Shoulder

Dense Graded
Aggregate

Hot Bin - For each


asphalt
laying
- - one test for one test for

month month
For each For each one test for
each road per each road per asphalt laying asphalt laying each road per
month

Concrete
Aggregate(20 mm)

Concrete Aggregate
fine (Sand/ Quarry
Dust)

one test for


Blotting Material each road
per month

CSS1

MC30