LAPORAN BULANAN

QUALITY CONTROL

PROYEK KARGO JUANDA SURABAYA

BULAN DESEMBER 2020

Kontrak Nomor :
PBJSUB-20004426

Kontrak tanggal
5/20/2020

OWNER :

ANGKASA PURA I
BANDARA JUANDA SURABAYA
PT AMKA (PERSERO)
JL. Veteran No.112 BekasI

DAFTAR INSPECTION TEST PLAN

Quality Control Minimum testing according to RESPONSIBILITY


No. Item Type of Work (item) Unit Test Group Activities Methode of test spesification Spesification Remarks
Contractor Supplier Client
DMF Each proposal Material
Cement each 283 kg/m3
Properties I I/C S
Gradation Agg. each 732,70 kg
1 Beton Raja Beton K-300 M3 Abration Agg each 812,00 kg min. 40% Structure
Slump PD T-14-2003 Each Mixer 10 ±2
Field Test Compressive I/C I/C S
SNI 2847-2002 6 set sample per 50 m3 K-300
Strength
DMF Each proposal Material
Cement each 211 kg/m3
Properties I I/C S
Gradation Agg. each 784,37 kg
2 Beton Raja Beton K-175 M3 Abration Agg each 1083,00 kg min. 40% Structure
Slump PD T-14-2003 Each Mixer 10 ±2
Field Test Compressive I/C I/C S
SNI 2847-2002 6 set sample per 50 m3 K-175
Strength
Manufacture
Sertifkat Each proposal Material

3 Tiang Pancang Spun Pile dia. 400 m' Properties Yield Strength Test Structure I I/C S
mm K600 Type A
Dimension
Manufacture
Properties Each proposal Material I I/C S
Sertifkat
4 Wiremesh M7-150 M Yield Strength Test Min 490 Mpa Structure
Uji Tarik Each proposal Material I/C S S
Dimension
Manufacture
Properties Sertifkat Each proposal Material I I/C S

5 Tulangan besi <Ø12 mm M Structure


Yield Strength Test BJTP 24 Min 490 Mpa
Uji tarik Each proposal Material I/C S S
Dimension SII 0136-80
Manufacture
Properties Each proposal Material I I/C S
Sertifkat
6 Tulangan besi >Ø12 mm M Structure
Yield Strength Test PBBI 1984 ST-37
Uji Tarik Each proposal Material I/C S S
Dimension SNI 03-1729-1989)
Manufacture
Properties Each proposal Material I I/C S
Sertifkat
6 Baja Konstruksi KG Structure
Yield Strength Test BJTD 39 Min 490 Mpa
Uji Tarik Each proposal Material I/C S S
Dimension SII 0136-80
Manufacture
Properties Each proposal Material I I/C S
Sertifkat
7 Paving Blok M² Structure
Yield Strength Test SII 0819-83 K-500
Uji Tekan Each proposal Material I/C S S
Dimension
Manufacture
Properties Each proposal Material I I/C S
Sertifkat
8 CTB M² Structure
Yield Strength Test Each proposal Material per 20cm/area
Uji Tekan I/C S S
Dimension
Manufacture
Properties Sertifkat Each proposal Material I I/C S

9 CBR M² Per 1000m3 min Structure


Yield Strength Test Each proposal Material 6%
Uji Tekan I/C S S
Dimension
Manufacture
Properties Each proposal Material I I/C S
Sertifkat
10 U Ditch & Box Culvert M² Saluran
Yield Strength Test K-300
Field Test Each proposal Material I/C S S
Dimension
Manufacture
Properties Each proposal Material I I/C S
Sertifkat
11 MEP SNI 04-0225- Saluran
Yield Strength Test 2000/PUIL 200
Field Test Each proposal Material I/C S S
Dimension

Symbols & Abreviations : I = Inspection Point C = Certificate S = Sample


Review Approval
REKAP MONITORING NON CONFORMANCE
DIV. OPS : II
PROYEK : KARGO JUANDA SURABAYA

No. NON CONFORMANCE Target Selesai Penanggung Status


Rencana/Realisasi Tindak Lanjut
Urut No Tanggal Uraian Penyimpangan Rencana Realisasi Jawab OPEN/CLOSED
Diisi oleh Penerbit NC Diisi oleh Penanggung Jawab (Berdasarkan hasil pembahasan)
NON CONFORMANCE ( NC )

DIVISI : II No. NC :
PROYEK : KARGO JUANDA SURABAYA
LOKASI : BANDARA JUANDA SURABAYA Standart :
TANGGAL :

A. URAIAN PENYIMPANGAN YANG DITEMUKAN : Pelapor


Nama :
Jabatan :
Penerbit NC
QC
Nama : M Hamsah
Tandatangan :

Diketahui Oleh :
( Penanggung Jawab Pekerjaan )
Nama :
Jabatan :

B. INVESTIGASI AKAR PERMASALAHAN : PM


Nama : Ary Hariyadi

Tandatangan :

URAIAN REALISASI TINDAK LANJUT Dibuat oleh Pelaksana TINDAK LANJUT


Nama : M Hamsah
Jabatan : QC
Tandatangan :
……………………………………………………………………………………………
……………………………………………………………………………………………
URAIAN DAN JUMLAH REALISASI BIAYA TINDAK LANJUT Cek Pelaksanaan TINDAK LANJUT Oleh :
…………………………………………………………………………………………… Nama :
…………………………………………………………………………………………… Jabatan : GSP
…………………………………………………………………………………………… Tandatangan :
……………………………………………………………………………………………
……………………………………………………………………………………………
C. PEMERIKSAAN SETELAH SELESAI TINDAK LANJUT : Diperiksa Oleh
…………………………………………………………………………………………… Nama : M Hamsah
…………………………………………………………………………………………… Jabatan : QC
…………………………………………………………………………………………… Tandatangan :
……………………………………………………………………………………………
……………………………………………………………………………………………
LEMBAR CLOSING MEMO No. Memo :
No. LCM :
Tanggal : Standard : ISO 9001 : 2000
A. INVESTIGASI AKAR PERMASALAHAN

B. RENCANA TINDAK LANJUT

C. PEMERIKSAAN SETELAH SELESAI TINDAK LANJUT Cara Pelaksanaan TINDAK LANJUT Oleh :
(Dokumentasi) ( Penanggung jawab pekerjaan )

Nama :
Jabatan : GSP
Tanda Tangan :

…………………………………….
Diperiksa oleh penerbit memo

Nama :
Jabatan : QC
Tanda Tangan :

…………………………………….
KESIMPULAN HASIL TINDAKLANJUT :

LULUS GAGAL
LEMBAR CLOSING MEMO No. Memo :
No. LCM :
Tanggal : Standard : ISO 9001 : 2000
A. INVESTIGASI AKAR PERMASALAHAN

B. RENCANA TINDAK LANJUT

C. PEMERIKSAAN SETELAH SELESAI TINDAK LANJUT Cara Pelaksanaan TINDAK LANJUT Oleh :
(Dokumentasi) ( Penanggung jawab pekerjaan )

Nama :
Jabatan :
Tanda Tangan :

…………………………………….
Diperiksa oleh penerbit memo

Nama :
Jabatan :
Tanda Tangan :

…………………………………….
KESIMPULAN HASIL TINDAKLANJUT :

LULUS GAGAL
LEMBAR CLOSING MEMO No. Memo :
No. LCM :
Tanggal : Standard : ISO 9001 : 2000
A. INVESTIGASI AKAR PERMASALAHAN

B. RENCANA TINDAK LANJUT

C. PEMERIKSAAN SETELAH SELESAI TINDAK LANJUT Cara Pelaksanaan TINDAK LANJUT Oleh :
(Dokumentasi) ( Penanggung jawab pekerjaan )

Nama :
Jabatan :
Tanda Tangan :

…………………………………….
Diperiksa oleh penerbit memo

Nama :
Jabatan :
Tanda Tangan :

…………………………………….
KESIMPULAN HASIL TINDAKLANJUT :

LULUS GAGAL
PT. AMKA (Persero) PERLUASAN KARGO INTERNASIONAL DAN AREA PARKIR BESERTA FASILITAS
PENUNJANGNYA DI BANDAR UDARA INTERNASIONAL JUANDA SURABAYA

PEKERJAAN PEMBESIAN PLAT DAN BALOK LANTAI 1

PENGECORAN PLAT LANTAI 1


PT. AMKA (Persero) PERLUASAN KARGO INTERNASIONAL DAN AREA PARKIR BESERTA FASILITAS
PENUNJANGNYA DI BANDAR UDARA INTERNASIONAL JUANDA SURABAYA

FLOOR HARDINER LANTAI SELASAR

PEMADATAN JALAN SISI SELATAN GEDUNG


PT. AMKA (Persero) PERLUASAN KARGO INTERNASIONAL DAN AREA PARKIR BESERTA FASILITAS
PENUNJANGNYA DI BANDAR UDARA INTERNASIONAL JUANDA SURABAYA

PEMASANGAN KERAMIK TOILET LANTAI 2

PEKERJAAN PEMASANGAN ATAP ZYNCALUM


PENGETESAN PENANGKAL PETIR

PEMASANGAN AC LANTAI 1
PT. AMKA (Persero) PERLUASAN KARGO INTERNASIONAL DAN AREA PARKIR BESERTA FASILITAS
PENUNJANGNYA DI BANDAR UDARA INTERNASIONAL JUANDA SURABAYA

PEKERJAAN PEMASANGAN PANEL LISTRIK


TES RENDAM PIPA SPARING LANTAI 2