You are on page 1of 2

NATIONAL HIGHWAYS AUTHORITY OF INDIA

4-Laning and Strengthening of Existing 2-Lane Road from Km 265.000 to 380.000


Dhule to Pimpalgaon Section of NH-3 in the State of Maharastra

Contractor : Soma Enterprise Limited Concessonaire : IRCON - SOMA Tollway Pvt. Ltd.
Sub. Contractor : MCCL / SAAVY / VNC Testing Laboratory : Malegaon

Doc No : Soma QCF EW 13


Rev. No : 01
SUMMARY OF BORROW AREA TEST RESULTS
Date of Rev. : 22.07.2005
Page : 1 of 1
Package No : Lead from NH :
Source : Date of sampling :
Location : Appx. Qty.(Cum) :
Plastic Free Grain Size Analysis
MDD Liquid Plasticity
Depth OMC Limit Swell Silt &
Limit Index Gravel Sand CBR
Sl.No ( Index Clay Classification Suitable for
(% (%)
m) (%)
(gms/cc) (%) (%) ) (%)
(%) (%) (%)

Tested by Checked by

Sub Contractor IRCON / SOMA SPV Representative

Random sample checked by


Plastic Free Grain Size Analysis
MDD Liquid Plasticity
Depth OMC Limit Swell Silt &
Limit Index Gravel Sand CBR
Sl.No ( Index Clay Classification Suitable for
(% (%)
m) (%)
(gms/cc)
Random sample checked by (%) (%) ) (%)
(%) (%) (%)
IC Representative

You might also like