REINFORCEMENT QUALITY INSPECTION LINE

BEFORE

Pos 1 LH Pos 2 LH Pos 4 LH Pos 6 LH

Flowout in pos 4 (Rr door


UNIT IN Pos 3 Pos 5 Pos 7 inner opening and pos 5 (Fr
door inner opening) is still
high
Pos 1 RH Pos 2 RH Pos 4 RH Pos 6 RH

TRIAL 1

1. Add 1 pos (LH and RH) to


Pos 1 LH Pos 2 LH Pos 4 LH Pos 6 LH Pos 8 LH reinforce inner opening
area (balancing 1 MP spare
and 1 MP input data)
UNIT IN Pos 3 Pos 5 Pos 7
2. ITEM CHECK : FR DOOR
INNER AND OPENING (RH
AND LH)
Pos 1 RH Pos 2 RH Pos 4 RH Pos 6 RH Pos 8 RH