RAIL BRIDGES
5
• INCREMENTAL LAUNCH
(Typically an Inefficient use of materials,
so Not commonly used –
need tangent or constant curvature)
7
Sagadahoc Bridge, ME
9
Precast
Joints
Cast-in-Place Joints
• Reinforcing Bars
• Joint Preparation
• Bulkheads
12
Layout Orientation
• Longitudinal
– Span by Span
– Cantilever
• Transverse
• Vertical
13
• Internal Tendons
– Transverse
– Longitudinal
(Cantilever)
14
Post-Tensioning
Pre-Tensioning
15
• Vertical Tendons
(in Precast Piers)
18
Construction Engineering
• Camber
• Geometry Control
• Prestressing Parameters
• Erection Loads
• Erection Equipment
• Casting and Erection Manuals
• Integrated Shop Drawings
19
Segments in Storage
Segment Storage
Casting Beds
Batch Plant
Rebar Jigs
23
• 5,500 Segments
• 14 Casting Cells
25
Miles
85
29
• 15 Acres
• 1250 Segments
• Casting Cells
4 Typ., 1 Combined
30
Match Cast
Segment
Wet Cast
Segment
35
• Segment Handling
• Segment Storage
1 3
2
Three Point Supports
40
• Segment Storage
Double Stacking
41
PRECAST SUPERSTRUCTURE
Comparison Table
Precast Segmental
Span-by-Span Construction
43
SECTION A-A
A
A
44
•Deliver Segments
•Set Segments
46
•Deliver Segments
•Set Segments
47
•Stress Tendons
•Lower Truss and
Repeat Process
A
SECTION A-A
A
51
Precast Span-by-Span
Segments Erected using:
- Underslung Trusses
- Overhead Gantry
- Falsework Supports
52
WMATA, VA
58
Pennsylvania
Turnpike
Commission
Casting
Yard
Bridge –
East Approach
New WB
Twin Bridges with each:
• 5,910’ Long by 57’ Wide
Cas
ting • 40 Spans – 35 @ 150’, 5 @ 132’
Yar • 21 River Piers
d
• 18 Land Piers
Susquehanna River Bridge, PA
61
ONE
TWO
THREE
ERECTION PHASES
Casting Yard
Access Road
Segment
Erection
Segment Alignment
ELEVATION
SECTION VIEWS
Achieved Typical
Span x Span
Erection Rate of 2
Spans per Week
VERTICAL
CLEARANCES
LOCAL AIRPORT
RAILROAD LINES
Susquehanna River Bridge, PA
76
ADVANTAGES OF SPAN-BY-SPAN
• Quick, Simple Erection (2 - 3 Spans / Week)
• Easy Geometry Control
• Savings from less MOT
• Minimum User Delays
• Cost Effective
• Simple Design
• Durable Structures
Beautiful Bridges
78
Precast Segmental
Balanced Cantilever Construction
79
ERECTION SEQUENCE I
80
ERECTION SEQUENCE II
81
ERECTION SEQUENCE IV
82
Victory Bridge, NJ
85
Victory Bridge, NJ
86
Victory Bridge, NJ
87
Victory Bridge, NJ
88
Victory Bridge, NJ
89
Victory Bridge, NJ
90
Victory Bridge, NJ
91
Average production:
4 to 6 segments/day (45 ft)
Victory Bridge, NJ
92
Cast-in-Place Segmental
Balanced Cantilever Construction
94
Segmental Bridges
Mixing Construction Erection
Methods
99
Sagadahoc Bridge, ME
100
Cast-in-Place Approach
Units, with Precast
Main Span Unit
Sagadahoc Bridge, ME
101
Span-by-Span Construction
• Span-by-Span Approaches
• One-Directional Cantilever Main Span
CIP low
level piers
P/C high
level piers
Mid-Bay Bridge, FL
105
Precast Piers
Erect 1 Segment an Hour,
Approximately 1 Pier per Day
Direction
of Erection
107
Victory Bridge, NJ
108
Precast Piers
Victory Bridge, NJ
110
Victory Bridge, NJ
112
Victory Bridge, NJ
113
Victory Bridge, NJ
114
Victory Bridge, NJ
115
Victory Bridge, NJ
116
Victory Bridge, NJ
117
Victory Bridge, NJ
118
Cable Stayed
Segmental Superstructure
119
Form
Traveler
• 3 pairs of segments
erected in cantilever
– Epoxied segment joints
– Segments post-tensioned
Veteran’s Glass City Skyway, OH
132
Review Questions
• Define a segmental concrete bridge structure type?
• List 3 methods for constructing segmental bridges?
• List benefits during construction that result from
using a segmental bridge construction technique?
• List permanent bridge site layout benefits resulting
from using a segmental box girder bridge type?
• What structural benefits apply to using a closed cell
box girder for a segmental bridge?
• What segmental bridge technological advances offer
the most immediate benefits?
134