Main Bridge Casting yard

Pile boring data

Ground Toe of Soil Rock socket


Pile Boring Top of Pile Top of rock Water Depth
S.No. Pile Number level Pile depth depth

Start Date End Date (m, RL) (m, RL) (m, RL) (m, RL) (m) (m) (m)
1 Pile 7 28.01.2018 30.01.2018 558.12 555.62 554.62 - 2.5 1
2 Pile 8 31.01.2018 2.02.2018 558.125 554.225 553.125 3.9 1.1
3 Pile 9 5.02.2018 6.02.2018 558.146 554.146 553.146 4 1
4 Pile 10 7.02.2018 8.02.2018 558.125 554.625 553.625 3.5 1
5 Pile 01 9.02.2018 12.2.2018 558.52 551.52 549.52 7 2
6
7
8
9
10
11
12
13
14
15