KISI – KISI
BIDANG LOMBA
BRICKLAYING
0
A. Introduction
The practical test is included 2 parts: part 1and part 2
- Part 1 Bricklaying and finishing joint,no plastering :
+ Bricklaying :
Bricklaying complex - structure with clay bricks of 60 x 100 x 215 mm,
and concrete block no plastering.
Time: 9 hours.
- Part 2 are included 2 works:
+ Bricklaying :
Bricklaying complex - structure with clay bricks of 60 x 100 x 215 mm,
and concrete blocks 100 x 200 x 440 mm.
Time: 6 hours.
+ Plastering:
Plastering complex - structure
Time: 1 hour.
Time allowed for 2 parts is 16 hours over the 3 days of competition.
B. Project information
Projects have designed to incorporate the following technical skills:
1. Excution of drawings.
2. Measurement and marking out.
3. Leveling and plumbing.
4. Cutting and shaping bricks using traditional hand tool and masonry saws.
5. Building walls in accordance to plans including all decorative work.
6. Joints finishing.
7. Work cleanliness.
8. Bricklaying of part 1 commences on day one and second day.
9. Part 2 commences on the second day and third day.
10. Plastering of part 2 commences on the third day.
11. Marking for bricklaying of the part 1 will commence on the first evening or the
second morning and evening.
12. Marking for bricklaying of the part 2 will commence on the third afternoon and
evening.
13. The plastering of the part 2 will be marked on the third afternoon or morning.
14. Final marks may not be known until the end of the competition.
15. Final marking will be at the end of day 3 and be completed the day following the
competition.
1
C. Specification
1. All brickwork to be set out and constructed to dimensions, bonds and angles as
specified on the drawings.
2. All decorative and practical details to be constructed to projections, angles, radii and
overhangs as shown on drawings.
3. All cut bricks to be produced accurately to shape required whilst maintaining 10 mm
perpend joints.
4. All bricks to be laid showing best face and arises.
5. All brickwork to be taken up maintaining plumb level in alignment and to the
correct angles.
6. Brickwork to be taken up to a vertical gauge.
7. Cut faces where possible to be concealed in wall, not shown on back.
8. All details to be built as per instructions available on the drawings.
9. Bricklaying mortar :
Cement - sand mortar (1 PC : 3 Sand) or Drymix (MU or SIKA Plastermix Produk)
10. Plastering Mortar :
Cement - sand mortar (1 PC : 2,5 Sand) or Drymix (MU or SIKA Plastermix
Produk).
D. Instruction to competitors
1. Time allowed is 16 hours finishing 2 parts.
2. Requirement for competitors
It is 10 minutes prior to the commencement of competition, competitors will be
provided materials, and know the position as they drow lots.
Competitors are not allowed to ask about the drawing and method of construction
during the competition.
Competitors are not allowed to mark any symbols on their products .If they do so,
their products will not be marked.
When the time is over, competitors must announce to the expert about their
products.
Materials are available at site and competitors will be helped to do cleaning.
Competitors to check the measuring tools.
Competitors to wear safety clothes suitable with their work.
If there’s any problem, competitors to speak to the expert for help.
Competitors are not allowed to leave the competition without permission.
3. Materials
Clay Brick (Batu bata pres) 60 x 100 x 215 mm.
Light Brick (Bata ringan) 100 x 200 x 440 mm.
Drymix/SIKA/MU (adukan kering siap pakai).
2
4. Tools and means of production
a. The competitor must bring the remaining tools in a toolbox (Peralatan yang
harus dibawa peserta) :
Brick trowel (cetok pasang bata)
Plastering trowel (cetok plesteran)
Pointing trowel (cetok lidah/lancip)
Wooden float (roskam kayu)
Measuring (meteran)
Hammer (palu)
Leveling (Waterpass 50 cm)
Leveling (waterpass) 100 or 120 mm
Square (siku baja)
Line bobbins (penahan benang)
Plumb line (unting-unting)
Jointer (pembentuk nat)
Hand saw (gergaji tangan)
Helmed (helm)
Safety footwear (sepatu kerja)
Safety clothes (pakaian kerja)
Eye protection (kacamata pengaman)
Masker (penutup debu)
b. The committee must be prepare the remaining tools for competitors (peralatan
yang disediakan panitia) :
Folding rule (Jidar aluminium 200 cm)
Hoe (cangkul)
Mortar box (kotak adukan)
Pail (ember)
Tub stock water (bak tandon air)
Electric cutting brick machine (mesin pemotong bata)
Water hose (selang air)
Wood (papan kayu 10 x 100 x 1000 mm)
3
E. Test Project marking
The experts will decide together on the marking criteria and the dimensional
tolerances.
1. Marking Criteria Building the part 1 and 2 :
Basic dimension
Structure
Joint thickness
Vertically
Flatness
Perpendicular
Leveling
Solid of joint
Cutting
Working productivity
The experts with every competitors the best during the competition.
“Good luck”
4
LEMBAR INFORMASI
LKS TINGKAT NASIONAL KE XXV TAHUN 2017
BIDANG LOMBA BRICKLAYING
1. PEBIMBING :
Mengikuti Teknikel Meeting sebelum pelaksanaan lomba dengan waktu dan
tempat ditentukan kemudian.
Diperkenankan membantu kompetitor dalam penyiapan peralatan sebelum
pelaksanaan perlombaan.
Diperkenankan membantu kompetitor dalam pembersihan lokasi dan perapihan
bahan serta peralatan setelah selesai lomba.
Dilarang membantu dalam bentuk apapun kepada kompetitor ketika lomba
berlangsung, kecuali seijin Juri.
Diperkenankan melihat prosesi penilaian dengan tidak mengganggu atau
intervensi terhadap keputusan Juri.
Membantu menciptakan suasana meriah dan kekeluargaan diantara sesama
Pebimbing, Kompetitor, Juri dan semua yang terlibat dalam pelaksanaan lomba
dengan tidak mengganggu kompetitor.
2. KOMPETITOR :
Mengikuti Teknikel Meeting sebelum pelaksanaan lomba dengan waktu dan
tempat ditentukan kemudian.
Datang 15 menit sebelum lomba dimulai.
Mempersiapkan peralatan dan bahan dengan atau tanpa bantuan Pebimbing.
Mengikuti lomba dengan tertib dan tidak mengganggu sesama kompetitor pada
waktu berjalannya lomba.
Menggunakan alat pelindung diri (APD) : kacamata, masker, dan penutup telinga
pada waktu memotong batu bata/bata ringan.
Jika menemui masalah harus melapor kepada Juri.
Tidak diperkenankan berbicara dengan Juri kecuali pada waktu istirahat dan
Ishoma.
Wajib membersihkan lokasi lomba, menata bahan dan peralatan setiap lomba
telah selesai.
Mengikuti pengarahan akhir dari Juri sebelum meninggalkan lokasi lomba.
No. Nama Bahan Spesifikasi Jumlah Satuan Harga Satuan Jumlah Harga Keterangan
1 Cangkul Umum/biasa 24 buah Rp 35.000,00 Rp 840.000,00
2 Kotak adukan Kayu/plastik uk.40 x 60 cm 24 buah Rp 40.000,00 Rp 960.000,00
3 Ember Plastik/karet 30 buah Rp 7.500,00 Rp 225.000,00
4 Tandon air Kapasitas 250 liter 1 buah Rp 300.000,00 Rp 300.000,00
5 Selang air Plastik 20 meter Rp 10.000,00 Rp 200.000,00
6 Jidar aluminium 20 x 60 x 2000 mm 24 buah Rp 40.000,00 Rp 960.000,00
7 Mesin Pemotong bata Elektrik 12 buah Rp 10.000.000,00 Rp 120.000.000,00
8 Papan kayu 20 x 100 x 1500 mm 48 buah Rp 15.000,00 Rp 720.000,00
(……………………….)
DAFTAR KEBUTUHAN BAHAN
LKS NASIONAL KE XXV TAHUN 2017
(ESTIMASI PESERTA 24 ORANG)
No. Nama Bahan Spesifikasi Jumlah Satuan Harga Satuan Jumlah Harga Keterangan
1 Batu bata (Warna merah) Bata pres 60 x100 x 215 mm 5160 buah Rp 6.500.00 Rp 33.540.000,00
Batu bata kuning dengan cat Bata pres 60 x100 x 215 mm 2100 buah Rp 7.000.00 Rp 14.700.000,0
2 Bata ringan (Hebel) 100 x 200 x 600 mm 12 m3 Rp 800.000,00 Rp 09.600.000,00
3 Drymix/SIKA/MU Untuk pasangan bata dan plester 290 zak Rp 65.000,00 Rp 18.850.000,00
(……………………….)
LOMBA KOMPETENSI SISWA (LKS)
SEKOLAH MENENGAH KEJURUAN
TINGKAT NASIOANAL KE XXV TAHUN 2017
Interval of
Piece Value @ Total
Marking Aspek deviasion Score Calculation
Position deviasion deviasion
(mm)
1 Ukuran tinggi pasangan bata 140 1s/d10 0,15 1,5 1,5
cm
2 Ukuran panjang keseluruhan 170 1s/d10 0,15 1,5 1,5
cm
3 Ukuran tinggi 50 cm 1s/d10 0,15 1,5 1,5
4 Ukuran panjang 60 cm 1s/d10 0,15 1,5 1,5
5 Ukuran panjang 55 cm 1s/d10 0,15 1,5 1,5
6 Kesikuan luar samping kanan 1s/d10 0,15 1,5 1,5
7 Kesikuan dalam samping kanan 1s/d10 0,15 1,5 1,5
Interval of
Piece Value @ Total
Marking Aspek deviasion Score Calculation
Position deviasion deviasion
(mm)
1 Potongan bata miring samping kiri 1s/d10 0,15 1,5 1,5
1 2 8 4
• • 7
• I 10 ,, 12
18 14 11 11 17 11 11 20 21 22 28 24
llWlllLOI••
LCIK
LOI•'-'ICICll
· -·Xl V
BRICKLAYINC3
B A•Rw
--'r<
L 1811111
B B.AllMlllll
BRICK llZE:
N
i
:::>
r;
iii
CONCREIE BLOCICll llZEl..
I I !
{I I I l ..
L Mm rL
L tmm ,. •llli.I,
- '<
I
.L. Mm rL
I
i
MODULE1
LAY OUT
.....
LllOWlm Al.8ICIDll -·-BRICK LAYING"llJ/ N
LaNI
18-20 OKTOBER 2018
mm
L 21.m L L 21.m L
" " 17DJD " "
MODULE 1
.........
L O lm A o ICIDli EIL.
LaNI
ICBXKV
BRICKLAYING
MODULE 2
.........
L O lm A o ICIDli EIL.
LaNI
ICBXKV
BRICKLAYING