RATE ANALYSIS2
As per Ref Circular SMPP/HR-ER/MW/2013 Dated 08.05.2013
W
Sl.No. Description USW
1 Min Wages per day 273
2 Contractors Profit @ 10% 27.3
3 PF @ 13.61% including Administrative Charges 37.1553
4 ESI @ 4.75% 12.9675
9 T&P @ 3% 8.19
10 Safety @ Rs.4/- Per Manday 4
11 Dust Allowances 38.46
12 Total Amount for One Manday 401.07
from 01.04.2014
WAGES
SSW SW
309 363
30.9 36.3
42.0549 49.4043
14.6775 17.2425
9.1155 10.7085
15.2028 17.8596
15.45 18.15
11.48 11.48
9.27 10.89
4 4
38.46 38.46
499.61 577.49
d 08.05.2013
WAGES
SSW SW
309 363
30.9 36.3
42.0549 49.4043
14.6775 17.2425
9.27 10.89
4 4
38.46 38.46
448.36 519.30
ESTIMATION OF MANPOWER
(A) For Unloading of wagons and cleaning of coal in between track at track hopper 1&2, For up keepment of track hopper 1
bay, commercial room, coal sampling room compressor room at track hopper and in & around track hopper area as directed
EIC.
Un-skilled : 09 persons per shift
Semi- skilled : 01 person per shift
Total manpower required : 30 Nos. (27 unskilled + 03 sup)
(E) For Up-Keep of R&D building and surroundings & for upkeep of
Railway commercial staff office, coal sampling building, in-motion
weighbridge, daily sweeping of both the track hoppers and newly : 06 Person / day
constructed S&T control room at wagon tippler and crossing station
building(Un-Skilled)
(F) Supply of unskilled manpower as and when required as per scope : 01 person
of work.
: 03 Persons
(G) Supply of skilled manpower for weigh bridge operation
(H) Re railing of wagons at track hopper, wagon tippler and inside plant
area. : 07 Persons(As and when Required)
(I) Clearing of cell jamming in both track hoppers : 10 Persons(As and when Required)
up keepment of track hopper 1 & 2
nd track hopper area as directed by
d + 03 sup)
when Required)
when Required)
when Required)
RATE ANALYSYS
2 Total SSW manpower required for unloading BOXN rake in Wagon tipplers
3 Total cost for unloading BOXN rake unloading at wagon tippler
4 No. Of wagons in each BOXN rake is
5 Unloading cost per wagon of BOXN at wagon tippler
Assuming one full rake consists of 59 wagons having side doors (openings) will be unloaded
unskilled labourers.
• rake unloading time is around 7:00 Hrs
• Opening of doors of wagon. Sometimes, for defective doors, which don’t open easily, it req
effort to open the door.
• Cleaning of wagons after manual unloading.
• Closing of doors of wagons. Special attention is required for defective doors.
• Cleaning the track hopper grill, floor, and spilled coal along the track up to 200mts in fron
Miscellaneous expenditure like mobile phone and gas (O2+DA) for cutting of welded wagon
For unloading each rake labour payment may be paid for minimum 02 shifts for delay in pla
S.No Descrpition
1 U/S Manpower required for unloading one BOXN rake
2 Cost per shift
3 Cost for 02 shifts
4 No. Of wagons in each BOXN rake is
5 Mannual unloading cost per wagon of BOXN at Track hopper
BOQ-D Stone Breaking, Stacking, Loading To Tractor, Transportation & Unloading From Tr
Stacking
One tractor with trolley can transport 12M.T in 8 (Eight ) hours i.e. in one day to a lead of 4
hopper in 3 trips.
USW / USW /
S.No Descrpition
Day Trip
1 Presently prevailing hire charges for one tractor with trolley per
day at SMSTPP including driver and diesel cost
BOQ-E Up keepment of R&D, Crossing station, In Motion weigh bridge, Tippler yard S&T
room buildings
S.No Descrpition
S.No Descrpition
₹ 4,958,959.35
128200 wagons
₹ 38.68 50
AGON TIPPLER(1&2)
/Rake Rate Total Cost
5 447.68 2238.4
1 499.61 499.61
₹ 2,738.01
59 Wagons
₹ 46.41 50
s.
200mts in front & rear of the track hopper.
welded wagon doors.
160 401.07
₹ 64,171.20
₹ 128,342.40
59 Wagons
₹ 2,175.29 50
3 1800.00 600.00
401.07 401.07
₹ 1,001.07 20
USW /
Rate Total Cost ₹
Day
6 447.68 2,686.08
20
when required
USW /
Rate Total Cost ₹
Day
1 401.07 401.07 20
eigh bridge
/day Rate Total Cost
3 577.49 1732.47
₹ 577.49 20
ers in Monsoon
/6 cells Rate Total Cost
10 401.07 4010.7
₹ 668.45 50
ANTICIPATED COAL WAGONS RECEIPT
S.No Description Coal
1 For stage-1 anticipated receipt is 90% of FSA LMT 52
2 For stage-2 anticipated receipt is 65% of FSA LMT 46.2
3 Anticipated quantity receipt from ECL LMT 10
4 Anticipated quantity receipt from SCCL LMT 5
5 Anticipated quantity Imported coal receipt LMT 26
6 Total coal expected to be received LMT
7 Average load on each wagon is MT
8 Number of wagons expected to be received
Rounded Say
2.5 wagons
59 wagons
75 wagons
53,100 wagons
128,200 wagons
BOQ/PRICE SCHEDULE FOR ONE YEAR
Total
YEAR
38.68 4,958,776.00
46.41 2,464,371.00
2175.29 652,587.00
1001.07 50,053.50
2686.06 838,050.72
401.07 200,535.00
577.49 632,351.55
2925.72 14,628.60
668.45 200,535.00
FHPLP00GN100
Total 10,011,888.37 10,011,888.37
Rupees One Crore Eleven Thousand Eight Hundre
RUPEES ONE CRORE ELEVEN THOUSAND EIGHT H
Eight Hundred Eighty Eight And Paise Thirty Seven Only
AND EIGHT HUNDRED EIGHTY EIGHT AND PAISE THIRTY SEVEN ONLY