Piles Material Take-Off

Concrete Rebar Quantity Summary


PILES CONCRETE AS PER GOLDEN PLANNER DRAWINGS PILES AS PER DESIMONE DRAWINGS
Dimensions Concrete Volume Dimensions Concrete Volume
PILE LABEL Number PILE LABEL Number
Diameter (mm) Length* (m) (m3) Diameter (mm) Length* (m) (m3)
P1 188 1000 20.5 3025 P1 117 1000 20.5 1883
P2 139 750 20.5 1258 P2 118 750 20.5 1068
4284 P2 92 600 20.5 533
3484

* - Length required to achieve pile capacity is based on Geotechnical Report * - Length required to achieve pile capacity is based on Geotechnical Report

PILES REINFORCEMENT AS PER GOLDEN PLANNER DRAWINGS PILES REINFORCEMENT AS PER DESIMONE DRAWINGS
Concrete Volume Reinforcement Reinforcement Concrete Volume Reinforcement Reinforcement
(m3) Required (kg/m3)* (MT) (m3) Required (kg/m3)* (MT)
4284 200 857 3484 200 697

* - Reinforcement required considering 1.4% Vertical Reinforcement of cross sectional area * - Reinforcement required considering 1.4% Vertical Reinforcement of cross sectional area