You are on page 1of 42

User Manual

DEWA eServices

Version: 1.0
Table of Contents
1.  Legend..................................................................................................................... - 3 - 
2.  Manual Objectives .................................................................................................. - 4 - 
3.  Description .............................................................................................................. - 4 - 
4.  System Requirement ............................................................................................... - 4 - 
5.  How to Navigate? ................................................................................................... - 5 - 
6.  How to Register?..................................................................................................... - 5 - 
7.  Forget Password ...................................................................................................... - 8 - 
8.  How to Login? ...................................................................................................... - 10 - 
9.  Owner Registration ............................................................................................... - 11 - 
10.  Building NOC ....................................................................................................... - 13 - 
11.  LV Design Approval ............................................................................................. - 16 - 
12.  LV Shop Drawing Approval ................................................................................. - 19 - 
13.  Fit-out Application ................................................................................................ - 22 - 
14.  HV Design Approval ............................................................................................ - 25 - 
15.  HV Inspection ....................................................................................................... - 28 - 
16.  Application ............................................................................................................ - 31 - 
17.  LV Inspection........................................................................................................ - 33 - 
18.  Track your Application ......................................................................................... - 34 - 
19.  Make your payment (on-line) ............................................................................... - 35 - 
20.  Update Profile ....................................................................................................... - 35 - 
21.  Building NOC - Water .......................................................................................... - 37 - 
22.  Design Approval - Water ......................................................................... - 39 - 

DEWA eServices User Manual


Page 2 of 42 Version:1.0
1. Legend

Frequently used symbols / icons and commands in SAP Transactions

Symbols Meaning of symbols and Commands

Increase and decrease font on page

Submit Any application

Cancel application.

Return back to previous Screen

DEWA eServices User Manual


Page - 3 - of 42 Version:1.0
2. Manual Objectives

Objective of this manual is to provide the hands on experience of the SAP transactions to the users. Based on
the DEWA eService business processes the transaction flow has been structured in this document as per
required business.

3. Description
DEWA eService is exclusively design for Consultant, Contractor and Govt Organization to apply and track the
application online. DEWA eService will covers the wide range of the Electricity and Water services offered by DEWA.
The services are:

Electricity  Water 
Building NOC Building NOC
Demolition NOC Demolition NOC
LV Design Approval Design Approval
LV Shop Drawing Approval Construction Drawing Approval
HV Design Approval Application
Application for Fit-Out Approval Application-Infrastructure (New)
HV Inspection On-line Estimate Payment
LV Inspection   
Application   
Application-Infrastructure (New)   
On-line Estimate Payment   

As the owner of our products you can get convenient access to Creation and tracking of application and account
information for certain services and performs select self-service transactions online.

4. System Requirement
To access the eService Website, we recommend your computer meets the following requirements:

Computer requirements

Your computer must have at least 1GB RAM, 100MB disk space, 133MHz, and Internet access.

Modem Requirements

The minimum speed requirement for a modem to access eService is 28.8Kbps, although we recommend using
56.6Kbps or higher speeds for optimal performance.

Web Browser Requirements

DEWA eServices User Manual


Page - 4 - of 42 Version:1.0
For the best eService experience we recommend you access the eService site using Microsoft® Internet
Explorer - version 6.0 or higher and pop-up should be enable.

The following are known browsers or platforms that are not officially supported by eService:

¾ America Online®
¾ Netscape Navigator®
¾ Microsoft® Internet Explorer - lower than version 6.0
¾ Certain Sun Microsystems applications, such as, Hot Java Browser and StarOffice Browser
¾ Web TV
¾ Browsers for the blind (screen readers or braille-writers)
¾ Browsers that disable JavaScript
¾ Browsers that do not support JavaScript
¾ Other browsers, such as, Opera, Mozilla, IE-derivatives MSN Explorer & NeoPlanet, and any other
browser that supports HTML 4.0, CSS 1.0, and JavaScript 1.0 should be able to run eService. However,
these browsers are not officially supported platforms and therefore, results vary compared to those of
supported browsers and platforms.

5. How to Navigate?

DEWA eService is specially designed for Consultant, Contractor and Government Organization to serve his
customer with full satisfaction. Consultant, Contractor and Government Organization needs to be register with
DEWA for availing various services offered by DEWA.
To navigate you need to go to https://crm.dewa.gov.ae/

Availing Upon logging into the portal, please go to the eService tab. Select eService and you can directly
connected to the application.

6. How to Register?

The Enrollment Process is applicable for following activities


¾ Electrical Installation
¾ Civil construction
¾ Building contracting
¾ General Maintenance and
¾ Demolition

The following categories are available for Consultant and Contractor


Consultant:
™ Consultant – General ( Electro-Mechanical, Civil, Structural, Architectural etc)
™ Consultant – Electrical
™ Consultant – Utility (Govt. organization/Utilities/Companies etc)
Contractor

DEWA eServices User Manual


Page - 5 - of 42 Version:1.0
™ Contractor – Electrical
™ Contractor – Civil
™ Contractor – Fit Out (to be defined clearly to make it easy to the Applicants)
™ Contractor – Demolition
Prerequisite
™ Valid Trade License

Simple Steps for Registration


Step 1: Click on New User Enrollment Hyperlink

Step 2: Select Application Category from Drop down list e.g. Consultant-Electrical, General etc.
Step 3: Enter all mandatory fields
Step 4: Enter Valid Trade License or Approved Letter
Step 5: Update the contact person Details
Step 8: Enter User ID and Password
Step 7: Upload required documents
Step 9: Submit application
Step 10: System will automatically send SMS & E-mail
Step 11: Submitted Application will undergo through approval process in DEWA
Step 12: Upon approval, system will automatically send Notification to consultant and contractor.

DEWA eServices User Manual


Page - 6 - of 42 Version:1.0
Note: all * are mandatory fields in the application needs to be fill-up
Enrollment Application From

DEWA eServices User Manual


Page - 7 - of 42 Version:1.0
7. Forget Password

Any time if you forget your password, Password can be changed on-line

Simple Steps for Reset your password


Step 1: Click on Forget your password Hyperlink

DEWA eServices User Manual


Page - 8 - of 42 Version:1.0
Step 2: Enter your Login Id
Step 3: Enter valid e-mail Id
Step 4: Press Submit
Step 5: System will automatically confirms the password assigned to your user id

DEWA eServices User Manual


Page - 9 - of 42 Version:1.0
8. How to Login?
Accessing DEWA eService, you need to user your credentials approved by DEWA e.g. User ID and Password

Simple Steps for Login into DEWA eService


Step 1: Enter your User Id
Step 2: Enter your Password
Step 3: Press Log on Button

DEWA eServices User Manual


Page - 10 - of 42 Version:1.0
9. Owner Registration
To organize your Owner through Owner registration procedure by using unique identification key e.g. Emirates ID.
Single identity for all process in DEWA e.g. Billing, NOC, DA etc.

Navigation Path Customer eService Æ Owner Registration

Prerequisite
™ Valid User ID and Password
™ Valid EID Card

Simple Steps for Search existing Owner and relate


Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, Emirates ID
No. to identify an existing Owner.

DEWA eServices User Manual


Page - 11 - of 42 Version:1.0
Step 2: Press Search Owner
Step 3: Select Displayed Owner and
Step 4: Press Relate Owner Button

Create Owner (if Not available in DEWA Repository)

Step 1: Press Create Owner Button


Step 2: Select Owner Type (Individual – For Individual Customer and Organization – Company etc)
Step 3: Enter all Mandatory information e.g. First Name, Last Name etc
Step 4: SAVE Owner Details
Step 5: You will get the System Generated Unique Number, Which can be refer any time in DEWA for reference
purpose.

DEWA eServices User Manual


Page - 12 - of 42 Version:1.0
10. Building NOC
The purpose of getting Building NOC is to ensure the source of supply as well as safety and protection of
existing network, Which is mandatory prior to obtain building permit from DM and to start construction activities at
site

Navigation Path Customer eService Æ Building NOC

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master

Simple Steps for Search existing Owner and relate


Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 2: Select any of the Owner which you wish to create application.

Step 2: Select any of the Owner by pressing Owner Name


Step 3: Select Type of NOC as per your wish e.g. New, Revision, Renewal or Additional load/Quantity
Step 4: Select Connection Type e.g. Electricity or Water
Step 5: Fill-up all mandatory information
Step 6: Attached all required document
Step 7: Press Submit Button
Step 8: System will automatically generate application number, the same can be refer any time

Note: all * are mandatory fields in the application needs to be fill-up

DEWA eServices User Manual


Page - 13 - of 42 Version:1.0
Building NOC Application From-Electricity

DEWA eServices User Manual


Page - 14 - of 42 Version:1.0
Building NOC Application From-Water

DEWA eServices User Manual


Page - 15 - of 42 Version:1.0
11. LV Design Approval

Enrolled consultants (consultant – Electrical & Consultant – Gov) and contractors (Contractor- Electrical &
Contractor – Fit outs) are applying on-line for obtaining Drawing Approval through e-Services of DEWA. The
purpose of obtaining Drawing Approval for low voltage wiring installation is to carry out the electrical installation
work complying with DEWA regulation for electrical installation and to apply for connection for the projects.
LV design Approval is issued for consultant who had obtain DEWA Building NOC specifying requirement of
DEWA Substation within the consumer plot, LV Design Approval is also pre-requisite for Applying Shop Drawing
Approval for Such Projects. If requirement of DEWA substation is not specified in DEWA Building NOC, such
cases LV design approval is not mandatory for issuing LV shop drawing approval to the contractors.
Only electrical contractor can apply for LV shop drawing which is mandatory for all the projects.
LV Shop Drawing for Fit-out works is issued to fit-out contractors as well as electrical contractors after the above
LV shop drawing approval for the main project where ever applicable. Such case DEWA NOC is not mandatory
for submission of application.
LV design approval and LV Shop Drawing Approval Process are two independent processes however the
process is identical except for the documents.

Navigation Path Customer eService Æ LV Design Approval

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master
™ Approved Building NOC
Simple Steps for LV Design Approval
Step 1: Download attached Sheet 1. Premise Details and 2. Material Request Form

Step 2: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved NOC by plot no or Electricity NOC

DEWA eServices User Manual


Page - 16 - of 42 Version:1.0
Step 6: Select Approved NOC by pressing NOC No

Step 7: Select Type of NOC No as per your wish to create LV Design Approval
Step 8: Select Type of application e.g. New or Revision
Step 7: Fill-up all mandatory information
Step 8: Attached all required document and downloaded file (Premise and Material)
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time

Note: all * are mandatory fields in the application needs to be fill-up


LV Design Application From

DEWA eServices User Manual


Page - 17 - of 42 Version:1.0
DEWA eServices User Manual
Page - 18 - of 42 Version:1.0
12. LV Shop Drawing Approval

Enrolled consultants (consultant – Electrical & Consultant – Gov) and contractors (Contractor- Electrical &
Contractor – Fit outs) are applying on-line for obtaining Drawing Approval through e-Services of DEWA. The
purpose of obtaining Drawing Approval for low voltage wiring installation is to carry out the electrical installation
work complying with DEWA regulation for electrical installation and to apply for connection for the projects.
LV design Approval is issued for consultant who had obtain DEWA Building NOC specifying requirement of
DEWA Substation within the consumer plot, LV Design Approval is also pre-requisite for Applying Shop Drawing
Approval for Such Projects. If requirement of DEWA substation is not specified in DEWA Building NOC, such
cases LV design approval is not mandatory for issuing LV shop drawing approval to the contractors.
Only electrical contractor can apply for LV shop drawing which is mandatory for all the projects.
LV Shop Drawing for Fit-out works is issued to fit-out contractors as well as electrical contractors after the above
LV shop drawing approval for the main project where ever applicable. Such case DEWA NOC is not mandatory
for submission of application.
LV design approval and LV Shop Drawing Approval Process are two independent processes however the
process is identical except for the documents.

Navigation Path Customer eService Æ LV Shop Drawing Approval

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master
™ Approved Building NOC
™ Approved Design Approval (If Substation Required)
Simple Steps for LV Shop Drawing Approval
Step 1: Download attached Sheet 1. Premise Details and 2. Material Request Form

Step 2: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved NOC by plot no or Electricity NOC

DEWA eServices User Manual


Page - 19 - of 42 Version:1.0
Step 6: Select Approved NOC by pressing NOC No

Step 7: Select Type of NOC No as per your wish to create LV Shop Drawing Approval
Step 8: Select Type of application e.g. New or Revision
Step 7: Fill-up all mandatory information
Step 8: Attached all required document and downloaded file (Premise and Material)
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time

Note: all * are mandatory fields in the application needs to be fill-up


LV Shop Drawing Application From

DEWA eServices User Manual


Page - 20 - of 42 Version:1.0
DEWA eServices User Manual
Page - 21 - of 42 Version:1.0
13. Fit-out Application

Enrolled consultants (consultant – Electrical & Consultant – Gov) and contractors (Contractor- Electrical &
Contractor – Fit outs) are applying on-line for obtaining Drawing Approval through e-Services of DEWA. The
purpose of obtaining Drawing Approval for low voltage wiring installation is to carry out the electrical installation
work complying with DEWA regulation for electrical installation and to apply for connection for the projects.
LV design Approval is issued for consultant who had obtain DEWA Building NOC specifying requirement of
DEWA Substation within the consumer plot, LV Design Approval is also pre-requisite for Applying Shop Drawing
Approval for Such Projects. If requirement of DEWA substation is not specified in DEWA Building NOC, such
cases LV design approval is not mandatory for issuing LV shop drawing approval to the contractors.
Only electrical contractor can apply for LV shop drawing which is mandatory for all the projects.
LV Shop Drawing for Fit-out works is issued to fit-out contractors as well as electrical contractors after the above
LV shop drawing approval for the main project where ever applicable. Such case DEWA NOC is not mandatory
for submission of application.
LV design approval and LV Shop Drawing Approval Process are two independent processes however the
process is identical except for the documents.

Navigation Path Customer eService Æ Application for Fit-out

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master
™ Approved Shop Drawing Approval
Simple Steps for Fit-Out Application
Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 2: Select any of the Owner which you wish to create application.
Step 3: Select any of the Owner by pressing Owner Name

DEWA eServices User Manual


Page - 22 - of 42 Version:1.0
Step 4: Search Approved LV Shop Drawing based on plot no or Application No
Step 5: Select Approved LV Shop Drawing and press view link to ensure the correctness

Step 6: Select LV Shop Drawing No as per your wish to create Fit-Out Application
Step 8: Select Type of application e.g. New or Revision
Step 7: Fill-up all mandatory information
Step 8: Attached all required document and downloaded file (Premise and Material)
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time

Note: all * are mandatory fields in the application needs to be fill-up

DEWA eServices User Manual


Page - 23 - of 42 Version:1.0
Fit-Out Application From

DEWA eServices User Manual


Page - 24 - of 42 Version:1.0
14. HV Design Approval

Design Approval Consultant needs to be enrolled with DEWA through Enrollment Process. The pre-requisite for
Applying Design Approval is to have valid Building NOC.
Categories of Substation Design Approval submission can be.
™ New Approval
™ Revision Approval
™ Renewal after expiry
™ Up-rating
™ Shifting of Substation with additional load
™ Temporary Supply
™ RMU/ Control Room Approval (For 11/22 kV Dedicated Feeder)

Navigation Path Customer eService Æ HV Design Approval

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master

DEWA eServices User Manual


Page - 25 - of 42 Version:1.0
™ Approved Building NOC

Simple Steps for HV Design Approval


Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search

Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved NOC by plot no or Electricity NOC
Step 6: Select Approved NOC by pressing NOC No

Step 7: Select Type of NOC No as per your wish to create HV Design Approval
Step 8: Select Type of application e.g. New, Revision, Renewal, RMU/Control Room, Up-rating, shifting with
additional load and Temporary Supply
Step 7: Fill-up all mandatory information

DEWA eServices User Manual


Page - 26 - of 42 Version:1.0
Step 8: Attached all required document
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time

Note: all * are mandatory fields in the application needs to be fill-up


HV Design Application From

DEWA eServices User Manual


Page - 27 - of 42 Version:1.0
15. HV Inspection

Releasing of power supply for new connection, substation room has to be approved by the HV Inspection unit
where ever substation is required. All this case related to the consultant of the project. Site Inspection for
substation room to be carried out by the HV inspection engineer once consultant requests for inspection. Once
the substation room is approved then it will go to the Est. & Job Order Section for further action.

Navigation Path Customer eService Æ HV Inspection

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master
™ Approved HV Design

Simple Steps for HV Inspection Approval


Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search

Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved HV Design based on pre defined parameter
Step 6: Select Approved HV Design by pressing HV Design No

DEWA eServices User Manual


Page - 28 - of 42 Version:1.0
Step 7: Fill-up all mandatory information
Step 8: Attached all required document
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time

Note: all * are mandatory fields in the application needs to be fill-up

DEWA eServices User Manual


Page - 29 - of 42 Version:1.0
HV Inspection Application From

DEWA eServices User Manual


Page - 30 - of 42 Version:1.0
16. Electricity/Water/Infrastructure Application

The Application for Supply of Electricity and Water, eServices will provide an on-line electronic service with an
automated business workflow on DEWA’s website. Contractor, Consultant or Govt Organization needs to enroll
with DEWA using Enrollment Process to have a valid user id and password. Consultant, Contractor and Govt
Org can submit the Application after obtaining the Building NOC and Design Approval from DEWA. Once DEWA
receives the application from the consultant, contractor or Govt Organization the Application team will check the
integrity of the applicant and application. Then they will forward it to estimate department for Estimation.

Navigation Path Customer eService Æ Application

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master
™ Approved LV Design and LV Shop Drawing for Electricity
™ Approved Design and Construction Supply for Water
Simple Steps for Application Approval
Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search

Step 2: Select Application Category e.g. Electricity, Water, Both or Infrastructure Services
Step 3: Select Connection type from drop down list e.g. Permanent, Additional Meter etc

DEWA eServices User Manual


Page - 31 - of 42 Version:1.0
Step 4: Select Approved LV Design, LV Shop Drawing, Design Approval-Water or Construction Supply-Water
Step 5: Select Connection Type e.g. Permanent Connection, Temporary Connection etc

Step 6: Press Create Application

Step 7: Press Create Application


Step 8: Fill-up all mandatory information
Step 9: Attached all required document
Step 10: Press Submit Button
Step 11: System will automatically generate application number, the same can be refer any time

Note: all * are mandatory fields in the application needs to be fill-up

DEWA eServices User Manual


Page - 32 - of 42 Version:1.0
Application From

17. LV Inspection
Releasing of power supply for new connection has to be approved by the LV Inspection unit for which the
concerned Electrical contractor of the project has to submit an inspection request. The Site inspection for the
inspection request is allocated to an inspection engineer. The Site is then inspected by the engineer and on
approval. The supply to the premise is released by the metering staff.

Navigation Path Customer eService Æ LV Inspection

Prerequisite
™ Valid User ID and Password

DEWA eServices User Manual


Page - 33 - of 42 Version:1.0
™ Registered Owner Master
™ Approved Application

Simple Steps for LV Inspection Approval


Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search

18. Track your Application

Releasing of power supply for new connection has to be approved by the LV Inspection unit for which the
concerned Electrical contractor of the project has to submit an inspection request. The Site inspection for the
inspection request is allocated to an inspection engineer. The Site is then inspected by the engineer and on
approval. The supply to the premise is released by the metering staff.

Navigation Path Customer eService Æ Track your application

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master
™ Registered Application in DEWA

By default you will received all application which required Customer Action.

Various Parameters are available to search your application such by default you will receive all application which
required Customer Action.

DEWA eServices User Manual


Page - 34 - of 42 Version:1.0
After Label first Blank Row is use to set the custom filter as you wish e.g. appr* on Status Column. System will
display those applications who status start from APPR

Simple Steps for Track you Application


Step 1: Enter Plot no or Order No (Application No)
Step 2: Enter Application Category e.g. Building NOC, Demolition NOC etc

Filter Option e.g.


Approv*

19. Make your payment (on-line)

DEWA is facilitating his support not only limited to application creation and tracking. You can also make estimate
payment online using Secure Payment Gateway.

20. Update Profile

DEWA is facilitating you to update your profile with latest information so that we can serve your better.

Navigation Path Customer eService Æ Update Profile

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master

DEWA eServices User Manual


Page - 35 - of 42 Version:1.0
Simple Steps for Track you Application
Step 1: Enter your input as you wish to change
Step 2: Update all required attachment
Step 3: Press Update button to update your profile
Note: Application Category hyperlink will help you, how to upgrade your existing Services

DEWA eServices User Manual


Page - 36 - of 42 Version:1.0
 

21. Building NOC - Water


The purpose of getting Building NOC is to ensure the source of supply as well as safety and protection of
existing network, Which is mandatory prior to obtain building permit from DM and to start construction activities at
site

Navigation Path Customer eService Æ Building NOC

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master

Simple Steps for Search existing Owner and relate


Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 2: Select any of the Owner which you wish to create application.

DEWA eServices User Manual


Page - 37 - of 42 Version:1.0
Step 2: Select any of the Owner by pressing Owner Name
Step 3: Select Type of NOC as per your wish e.g. New, Revision, Renewal or Additional load/Quantity
Step 4: Select Connection Type e.g. Electricity or Water
Step 5: Fill-up all mandatory information
Step 6: Attached all required document
Step 7: Press Submit Button
Step 8: System will automatically generate application number, the same can be refer any time

Note: all * are mandatory fields in the application needs to be fill-up


Building NOC Application From-Water

DEWA eServices User Manual


Page - 38 - of 42 Version:1.0
 
 

22. Design Approval - Water


 
The purpose of getting Building NOC is to ensure the source of supply as well as safety and protection of
existing network, Which is mandatory prior to obtain building permit from DM and to start construction activities at
site

Navigation Path Customer eService Æ Design Approval Water

Prerequisite
™ Valid User ID and Password
™ Registered Owner Master

DEWA eServices User Manual


Page - 39 - of 42 Version:1.0
™ Approved Building NOC

Simple Steps for Search existing Owner and relate


Step 1: Enter any of the Search parameter e.g. Driving License No, Passport No, Trade License No, to identify
an existing Owner or Press Search Button for Free Search
Step 2: Select any of the Owner which you wish to create application.

 
Step 3: Select any of the Owner which you wish to create application.
Step 4: Select any of the Owner by pressing Owner Name
Step 5: Search Approved NOC by plot no etc
Step 6: Select Approved NOC by pressing NOC No

 
 
Step 7: Select Type of NOC No as per your wish to create Design Application Waterl
Step 8: Select Type of application e.g. New, Revision
Step 7: Fill-up all mandatory information
Step 8: Attached all required document
Step 9: Press Submit Button
Step 10: System will automatically generate application number, the same can be refer any time

Note: all * are mandatory fields in the application needs to be fill-up

DEWA eServices User Manual


Page - 40 - of 42 Version:1.0
Design Application-Water From

 
 

DEWA eServices User Manual


Page - 41 - of 42 Version:1.0
 
The End 

DEWA eServices User Manual


Page - 42 - of 42 Version:1.0