You are on page 1of 60

PT.

PERUSAHAAN GAS NEGARA (Persero) Tbk


LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Lokasi : Jakarta Periode
Konsultan : PT. GAKA INDOINSPECTION

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 0 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 0 0
- Cilegon 1 Ls 0.16% 0 0
- Bekasi 1 Ls 0.08% 0 0
- Karawang 1 Ls 0.07% 0 0
- Cirebon 1 Ls 0.35% 0 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 0 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 0 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 0 0
2.2 ACVG 74.95 Km 8.08% 0 0
2.3 CIPS 175.33 KM 18.89% 0 0
2.4 DCVG 37.70 Km 4.06% 0 0
2.5 Core Drill 48.55 Km 5.23% 0 0

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 0 0
Laporan Bulanan 7 Lap 0.98% 0 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 1 - 6 April 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
wang dan Cirebon

:1
: 1 - 6 April 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

1 - 6 April 2014 0.00% 0.00%

Jakarta, 7 April 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Lokasi : Jakarta Periode
Konsultan : PT. GAKA INDOINSPECTION

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 0 1
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 0 1
- Cilegon 1 Ls 0.16% 0 1
- Bekasi 1 Ls 0.08% 0 1
- Karawang 1 Ls 0.07% 0 1
- Cirebon 1 Ls 0.35% 0 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 0 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 0 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 0 6
2.2 ACVG 74.95 Km 8.08% 0 6
2.3 CIPS 175.33 KM 18.89% 0 0
2.4 DCVG 37.70 Km 4.06% 0 0
2.5 Core Drill 48.55 Km 5.23% 0 4

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 0 1
Laporan Bulanan 7 Lap 0.98% 0 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 7-13 April 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

:2
: 7-13 April 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 2.10% 2.10%

1 0.08% 0.08%
1 0.16% 0.16%
1 0.08% 0.08%
1 0.07% 0.07%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

6 0.65% 0.65%
6 0.65% 0.65%
0 0.00% 0.00%
0 0.00% 0.00%
4 0.43% 0.43%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

1 0.09% 0.09%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

7-13 April 2014 4.29% 4.29%

Jakarta, 14 April 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Lokasi : Jakarta Periode
Konsultan : PT. GAKA INDOINSPECTION

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 0 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 0 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 0 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 6 13
2.2 ACVG 74.95 Km 8.08% 6 10.75
2.3 CIPS 175.33 KM 18.89% 0 8.433
2.4 DCVG 37.70 Km 4.06% 0 0
2.5 Core Drill 48.55 Km 5.23% 4 8

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 1 1
Laporan Bulanan 7 Lap 0.98% 0 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 14-20 April 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
wang dan Cirebon

:3
: 14-20 April 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

19 1.40% 2.05%
16.75 1.16% 1.80%
8.433 0.91% 0.91%
0 0.00% 0.00%
12 0.86% 1.29%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

2 0.09% 0.18%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

14-20 April 2014 4.42% 8.71%

Jakarta, 21 April 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Lokasi : Jakarta Periode
Konsultan : PT. GAKA INDOINSPECTION

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 0 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 0 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 0 1

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 19 17.75
2.2 ACVG 74.95 Km 8.08% 16.75 0
2.3 CIPS 175.33 KM 18.89% 8.433 19.948
2.4 DCVG 37.70 Km 4.06% 0 0
2.5 Core Drill 48.55 Km 5.23% 12 4.75

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 2 1
Laporan Bulanan 7 Lap 0.98% 0 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 21-27 April 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
wang dan Cirebon

:4
: 21-27 April 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
1 1.70% 1.70%

36.75 1.91% 3.96%


16.75 0.00% 1.80%
28.381 2.15% 3.06%
0 0.00% 0.00%
16.75 0.51% 1.80%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

3 0.09% 0.27%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

21-27 April 2014 6.36% 15.07%

Jakarta, 28 April 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Lokasi : Jakarta Periode
Konsultan : PT. GAKA INDOINSPECTION

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 0 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 0 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 36.75 0
2.2 ACVG 74.95 Km 8.08% 16.75 0
2.3 CIPS 175.33 KM 18.89% 28.381 10
2.4 DCVG 37.70 Km 4.06% 0 0
2.5 Core Drill 48.55 Km 5.23% 16.75 0

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 3 1
Laporan Bulanan 7 Lap 0.98% 0 1
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 28 April - 4 Mei2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
wang dan Cirebon

:5
: 28 April - 4 Mei2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
1 0.00% 1.70%

36.75 0.00% 3.96%


16.75 0.00% 1.80%
38.381 1.08% 4.14%
0 0.00% 0.00%
16.75 0.00% 1.80%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

4 0.09% 0.35%
1 0.14% 0.14%
0 0.00% 0.00%
0 0.00% 0.00%

8 April - 4 Mei2014 1.31% 16.38%

Jakarta, 5 Mei 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Lokasi : Jakarta Periode
Konsultan : PT. GAKA INDOINSPECTION

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 0 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 0 1
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 36.75 8.2
2.2 ACVG 74.95 Km 8.08% 16.75 6
2.3 CIPS 175.33 KM 18.89% 38.381 10
2.4 DCVG 37.70 Km 4.06% 0 10
2.5 Core Drill 48.55 Km 5.23% 16.75 0

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 4 1
Laporan Bulanan 7 Lap 0.98% 1 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 5-11 Mei2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

:6
: 5-11 Mei2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
1 0.06% 0.06%
1 0.00% 1.70%

44.95 0.88% 4.84%


22.75 0.65% 2.45%
48.381 1.08% 5.21%
10 1.08% 1.08%
16.75 0.00% 1.80%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

5 0.09% 0.44%
1 0.00% 0.14%
0 0.00% 0.00%
0 0.00% 0.00%

5-11 Mei2014 3.83% 20.21%

Jakarta, 12 Mei 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Konsultan : PT. GAKA INDOINSPECTION Periode

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 0 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 1 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 44.95 4.7
2.2 ACVG 74.95 Km 8.08% 22.75 2.2
2.3 CIPS 175.33 KM 18.89% 48.381 23
2.4 DCVG 37.70 Km 4.06% 10 15
2.5 Core Drill 48.55 Km 5.23% 16.75 0

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 5 1
Laporan Bulanan 7 Lap 0.98% 1 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 12-18 Mei 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

:7
: 12-18 Mei 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
1 0.00% 0.06%
1 0.00% 1.70%

49.65 0.51% 5.35%


24.95 0.24% 2.69%
71.381 2.48% 7.69%
25 1.62% 2.69%
16.75 0.00% 1.80%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

6 0.09% 0.53%
1 0.00% 0.14%
0 0.00% 0.00%
0 0.00% 0.00%

12-18 Mei 2014 4.93% 25.14%

Jakarta, 19 Mei 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Konsultan : PT. GAKA INDOINSPECTION Periode

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 0 1
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 1 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 49.65 0
2.2 ACVG 74.95 Km 8.08% 24.95 0
2.3 CIPS 175.33 KM 18.89% 71.381 0
2.4 DCVG 37.70 Km 4.06% 25 8
2.5 Core Drill 48.55 Km 5.23% 16.75 0

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 6 1
Laporan Bulanan 7 Lap 0.98% 1 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 19-25 Mei 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

:8
: 19-25 Mei 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
1 0.35% 0.35%
0 0.00% 0.00%
0 0.00% 0.00%
1 0.00% 0.06%
1 0.00% 1.70%

49.65 0.00% 5.35%


24.95 0.00% 2.69%
71.381 0.00% 7.69%
33 0.86% 3.56%
16.75 0.00% 1.80%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

7 0.09% 0.62%
1 0.00% 0.14%
0 0.00% 0.00%
0 0.00% 0.00%

19-25 Mei 2014 1.30% 26.44%

Jakarta, 26 Mei 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Konsultan : PT. GAKA INDOINSPECTION Periode

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 1 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 1 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 49.65 0
2.2 ACVG 74.95 Km 8.08% 24.95 0
2.3 CIPS 175.33 KM 18.89% 71.381 0
2.4 DCVG 37.70 Km 4.06% 33 0
2.5 Core Drill 48.55 Km 5.23% 16.75 0

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 7 1
Laporan Bulanan 7 Lap 0.98% 1 1
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 26 Mei - 1 Juni 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

:9
: 26 Mei - 1 Juni 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
1 0.00% 0.35%
0 0.00% 0.00%
0 0.00% 0.00%
1 0.00% 0.06%
1 0.00% 1.70%

49.65 0.00% 5.35%


24.95 0.00% 2.69%
71.381 0.00% 7.69%
33 0.00% 3.56%
16.75 0.00% 1.80%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

8 0.09% 0.71%
2 0.14% 0.28%
0 0.00% 0.00%
0 0.00% 0.00%

6 Mei - 1 Juni 2014 0.23% 26.67%

Jakarta, 2 Juni 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Konsultan : PT. GAKA INDOINSPECTION Periode

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 1 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 1 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 49.65 0
2.2 ACVG 74.95 Km 8.08% 24.95 0
2.3 CIPS 175.33 KM 18.89% 71.381 1.5
2.4 DCVG 37.70 Km 4.06% 33 4.7
2.5 Core Drill 48.55 Km 5.23% 16.75 0

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 8 1
Laporan Bulanan 7 Lap 0.98% 2 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 2-8 Juni 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

: 10
: 2-8 Juni 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
1 0.00% 0.35%
0 0.00% 0.00%
0 0.00% 0.00%
1 0.00% 0.06%
1 0.00% 1.70%

49.65 0.00% 5.35%


24.95 0.00% 2.69%
72.881 0.16% 7.85%
37.7 0.51% 4.06%
16.75 0.00% 1.80%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

9 0.09% 0.80%
2 0.00% 0.28%
0 0.00% 0.00%
0 0.00% 0.00%

2-8 Juni 2014 0.76% 27.42%

Jakarta, 9 Juni 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Konsultan : PT. GAKA INDOINSPECTION Periode

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 1 0
- Jakarta 1 Ls 0.07% 0 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 1 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 49.65 0
2.2 ACVG 74.95 Km 8.08% 24.95 0
2.3 CIPS 175.33 KM 18.89% 72.881 3.2
2.4 DCVG 37.70 Km 4.06% 37.7 0
2.5 Core Drill 48.55 Km 5.23% 16.75 0

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 0
Analisa DCVG 37.70 Km 0.26% 0 0
Analisa CIPS 175.33 Km 1.20% 0 0
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 9 1
Laporan Bulanan 7 Lap 0.98% 2 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 9-15 Juni 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

: 11
: 9-15 Juni 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
1 0.00% 0.35%
0 0.00% 0.00%
0 0.00% 0.00%
1 0.00% 0.06%
1 0.00% 1.70%

49.65 0.00% 5.35%


24.95 0.00% 2.69%
76.081 0.34% 8.20%
37.7 0.00% 4.06%
16.75 0.00% 1.80%

0 0.00% 0.00%

0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%
0 0.00% 0.00%

10 0.09% 0.88%
2 0.00% 0.28%
0 0.00% 0.00%
0 0.00% 0.00%

9-15 Juni 2014 0.43% 27.86%

Jakarta, 16 Juni 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Konsultan : PT. GAKA INDOINSPECTION Periode

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 1 0
- Jakarta 1 Ls 0.07% 0 1
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 1 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 49.65 0
2.2 ACVG 74.95 Km 8.08% 24.95 0
2.3 CIPS 175.33 KM 18.89% 76.08 18
2.4 DCVG 37.70 Km 4.06% 37.7 0
2.5 Core Drill 48.55 Km 5.23% 16.75 7.9

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 74.6
Analisa DCVG 37.70 Km 0.26% 0 37.7
Analisa CIPS 175.33 Km 1.20% 0 76.08
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 10 1
Laporan Bulanan 7 Lap 0.98% 2 0
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 16-22 Juni 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

: 12
: 16-22 Juni 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
1 0.00% 0.35%
1 0.07% 0.07%
0 0.00% 0.00%
1 0.00% 0.06%
1 0.00% 1.70%

49.65 0.00% 5.35%


24.95 0.00% 2.69%
94.081 1.95% 10.15%
37.7 0.00% 4.06%
24.65 2.48% 4.28%

0 0.00% 0.00%

74.6 0.51% 0.51%


37.7 0.26% 0.26%
76.081 0.52% 0.52%
0 0.00% 0.00%
0 0.00% 0.00%

11 0.09% 0.97%
2 0.00% 0.28%
0 0.00% 0.00%
0 0.00% 0.00%

16-22 Juni 2014 4.24% 32.12%

Jakarta, 23 Juni 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Konsultan : PT. GAKA INDOINSPECTION Periode

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 1 0
- Jakarta 1 Ls 0.07% 0 1
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 1 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 49.65 0
2.2 ACVG 74.95 Km 8.08% 24.95 0
2.3 CIPS 175.33 KM 18.89% 76.08 31
2.4 DCVG 37.70 Km 4.06% 37.7 0
2.5 Core Drill 48.55 Km 5.23% 16.75 11.9

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 0
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 0 74.6
Analisa DCVG 37.70 Km 0.26% 0 37.7
Analisa CIPS 175.33 Km 1.20% 0 76.08
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 10 1
Laporan Bulanan 7 Lap 0.98% 2 1
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 16-22 Juni 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

: 12
: 16-22 Juni 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
1 0.00% 0.35%
1 0.07% 0.07%
0 0.00% 0.00%
1 0.00% 0.06%
1 0.00% 1.70%

49.65 0.00% 5.35%


24.95 0.00% 2.69%
107.081 3.36% 11.56%
37.7 0.00% 4.06%
28.65 3.73% 5.54%

0 0.00% 0.00%

74.6 0.51% 0.51%


37.7 0.26% 0.26%
76.081 0.52% 0.52%
0 0.00% 0.00%
0 0.00% 0.00%

11 0.09% 0.97%
3 0.14% 0.42%
0 0.00% 0.00%
0 0.00% 0.00%

16-22 Juni 2014 8.69% 36.54%

Jakarta, 26 Juni 2014


PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Konsultan : PT. GAKA INDOINSPECTION Periode

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 1 0
- Jakarta 1 Ls 0.07% 1 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 1 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 49.65 45
2.2 ACVG 74.95 Km 8.08% 24.95 45
2.3 CIPS 175.33 KM 18.89% 107.08 56
2.4 DCVG 37.70 Km 4.06% 37.7 0
2.5 Core Drill 48.55 Km 5.23% 28.65 21

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 5
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 74.6 74.6
Analisa DCVG 37.70 Km 0.26% 37.7 37.7
Analisa CIPS 175.33 Km 1.20% 76.081 76.08
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 11 3
Laporan Bulanan 7 Lap 0.98% 3 1
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 16-22 Juni 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

: 12
: 16-22 Juni 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
1 0.00% 0.35%
1 0.00% 0.07%
0 0.00% 0.00%
1 0.00% 0.06%
1 0.00% 1.70%

94.65 4.85% 10.20%


69.95 4.85% 7.54%
163.081 6.03% 17.59%
37.7 0.00% 4.06%
49.65 2.26% 7.80%

5 3.20% 3.20%

149.2 0.51% 1.02%


75.4 0.26% 0.52%
152.162 0.52% 1.04%
0 0.00% 0.00%
0 0.00% 0.00%

14 0.27% 1.24%
4 0.14% 0.56%
0 0.00% 0.00%
0 0.00% 0.00%

16-22 Juni 2014 22.89% 59.43%

27.253% 63.795%
Jakarta, 26 Juni 2014
PT. GAKA INDOINSPECTION
Site Manager

Madian
PT. PERUSAHAAN GAS NEGARA (Persero) Tbk
LAPORAN MINGGUAN
Indirect and Direct Assessment Jalur Pipa Area Tangerang, Cilegon,
Bekasi, Palembang, Jakarta, Bogor, Karawang dan Cirebon

Pekerjaan : Indirect-Direct Assessment Minggu ke


Konsultan : PT. GAKA INDOINSPECTION Periode

Bobot REALISASI PEKERJAAN


NO KEGIATAN Vol Sat Kat Sebelumnya Kini
1 PERSIAPAN 7.00%
1.1 Mob Demob Tenaga Ahli & Peralatan 2 Kali 4.20% 1 0
1.2 Survey Awal
- Tangerang 1 Ls 0.08% 1 0
- Cilegon 1 Ls 0.16% 1 0
- Bekasi 1 Ls 0.08% 1 0
- Karawang 1 Ls 0.07% 1 0
- Cirebon 1 Ls 0.35% 1 0
- Jakarta 1 Ls 0.07% 1 0
- Bogor 1 Ls 0.24% 0 0
- Palembang 1 Ls 0.06% 1 0
1.3 Perizinan (Internal & Eksternal) 1 Ls 1.70% 1 0

2 Pekerjaan Indirect Assessment 436.18 Km 47.00%


2.1 PCM 99.65 Km 10.74% 49.65 22
2.2 ACVG 74.95 Km 8.08% 24.95 22
2.3 CIPS 175.33 KM 18.89% 107.08 19
2.4 DCVG 37.70 Km 4.06% 37.7 0
2.5 Core Drill 48.55 Km 5.23% 28.65 1

3 Pekerjaan Direct Assessment 32.00%


Tangerang, Cilegon, Bekasi, Palembang, 50 Titik 32.00% 0 5
Jakarta, Bogor, Karawang dan Cirebon

4 Analisa, Presentasi & Laporan 437.63 3.00%


Analisa PCM & ACVG 174.60 Km 1.20% 74.6 74.6
Analisa DCVG 37.70 Km 0.26% 37.7 37.7
Analisa CIPS 175.33 Km 1.20% 76.081 76.08
Analisa Direct Assessment 50 Titik 0.34% 0 0
5 Training 5 hari 5.00%
Pelatihan Basic NDT 5 hari 5.00% 0 0

6 Reporting & rapat 13 Kali 6.00%


Laporan Mingguan 28 Lap 2.48% 11 3
Laporan Bulanan 7 Lap 0.98% 3 1
Laporan Akhir dan Rekomendasi 1 Kali 1.28% 0 0
Presentasi Laporan Akhir 1 Kali 1.28% 0 0

TOTAL PEKERJAAN YANG SUDAH DISELESAIKAN S/D MINGGU INI 16-22 Juni 2014

PT. PERUSAHAAN GAS NEGARA (Persero) Tbk.


Site Manager

Agus Sukriya
(Persero) Tbk

a Tangerang, Cilegon,
ang dan Cirebon

: 12
: 16-22 Juni 2014

I PEKERJAAN PROGRESS PROGRESS


Akumulasi Minggu Ini % Akumulasi %

1 0.00% 2.10%

1 0.00% 0.08%
1 0.00% 0.16%
1 0.00% 0.08%
1 0.00% 0.07%
1 0.00% 0.35%
1 0.00% 0.07%
0 0.00% 0.00%
1 0.00% 0.06%
1 0.00% 1.70%

71.65 2.37% 0.00%


46.95 2.37% 0.00%
126.081 2.06% 0.00%
37.7 0.00% 0.00%
29.65 0.31% 0.00%

5 3.20% 3.20%

149.2 0.51% 1.02%


75.4 0.26% 0.52%
152.162 0.52% 1.04%
0 0.00% 0.00%
0 0.00% 0.00%

14 0.27% 1.24%
4 0.14% 0.56%
0 0.00% 0.00%
0 0.00% 0.00%

16-22 Juni 2014 12.01% 12.24%

Jakarta, 26 Juni 2014