0% found this document useful (0 votes)
251 views1 page

Inspection Flow Chart

The document outlines the process flow for site inspections for the Springlight City project. Contractors conduct inspections and record results, which are logged, numbered and distributed to Turner and relevant third parties. Consultants from construction, plumbing, HVAC and other specialties may attend inspections as required. Turner notifies parties if follow up is needed and distributes final inspection results.

Uploaded by

Vo Kien Cuong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
251 views1 page

Inspection Flow Chart

The document outlines the process flow for site inspections for the Springlight City project. Contractors conduct inspections and record results, which are logged, numbered and distributed to Turner and relevant third parties. Consultants from construction, plumbing, HVAC and other specialties may attend inspections as required. Turner notifies parties if follow up is needed and distributes final inspection results.

Uploaded by

Vo Kien Cuong
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd

SPRINGLIGHT CITY PROJECT

Process Flow: SITE INSPECTIONS

CONTRACTOR

Distribution

Relevant Third Record,


Party Number, Log TURNER
Notifies
if required

STR MEP Other SpecC


CONSULTANTS + FP
+ PLBG
+ HVAC
+ ELV

ATTENDANCE AT INSPECTION as required


As Required

RESULTS

TURNER

Distribution

Relevant Third
CONTRACTOR SITE TEAM TURNER L&S Party