SPRINGLIGHT CITY PROJECT
Process Flow: SITE INSPECTIONS
CONTRACTOR
Distribution
Relevant Third Record,
Party Number, Log TURNER
Notifies
if required
STR MEP Other SpecC
CONSULTANTS + FP
+ PLBG
+ HVAC
+ ELV
ATTENDANCE AT INSPECTION as required
As Required
RESULTS
TURNER
Distribution
Relevant Third
CONTRACTOR SITE TEAM TURNER L&S Party
SLC Flowcharts-Rev.00-2017-0110 1/10/2017