7.2.1. Inspection
It is critical to the integrity of flame arresters that they be inspected and
serviced on a regularly scheduled basis (preventive maintenance program)
so that they continue to be effective.
The regularity of inspections and the time interval between inspec-
tions depends on the application and company practice. One flame
arrester manufacturer recommends that inspection should be made a
month after initial operation. Many companies perform inspection and
maintenance at least once annually unless operating experience indicates
that the inspection period should be changed. Some companies that con-
tinuously monitor the pressure drop do not inspect flame arresters until
abnormal pressure drop is detected. However, pressure drop may not
identify corrosion problems or absence of the element or gaskets. Even if
pressure drop indicates no potential problem, it is recommended that all
flame arresters be visually inspected on a scheduled basis. Plugging may
not be readily detected by pressure drop where the normal vent flow is only
a small fraction of the design basis flow.
Some flame arrester designs allow in-place inspection (via a removable
housing cover plate); however, others have to be removed from the vent
nozzle or in-line piping to inspect the flame arrester element.
There are some mechanical factors that sometimes hamper inspection.
A flame arrester may be in a location that is not readily accessible or does
not provide sufficient working space or mechanical aids. This is why, as was
mentioned in Chapter 6, proper location and installation is very impor-
tant. If removal of the flame arrester is required for inspection, then purg-
ing may be required before removal. This may be difficult to do easily
because of the flame arrester construction or location. Also, some flame
arresters may be constructed so that removal of the arrester element for
inspection is not possible (i.e., the element is welded to the housing).
Another problem is that the flame arrester is in a pipeline or directly
attached to a vessel that is in constant use. In some cases, this might even be
a problem during a period of a turnaround. In this situation it may be nec-
essary to install two flame arresters in parallel with adequate valving to
switch from one to the other and to provide for purging.
Before performing any inspection or maintenance on a flame arrester,
the associated process equipment and piping should be taken out of ser-
vice or isolated. The work area must be proven by test to be free of any
harmful gases or vapors. It should also be verified that all piping is clean
and free of obstructions and debris. All plant, company, local, state, and
federal safety and fire codes and standards should be followed.
7.2. Mechanical Integrity Issues 149
that a flame arrester be inspected after it stops a flame (see Sections 5.3.16
and 5.3.17).
All flame arrester manufacturers have written instructions for installa-
tion, inspection, and maintenance, and these should be followed. Some
flame arrester manufacturers require that maintenance be done at their
facility to avoid invalidating the flame arrester warranty.
For vapor lines that cannot be shut down conveniently to remove and clean
arrester elements, parallel flame arresters are sometimes installed. To be
able to switch the flame arresters, suitable isolation valving must be
installed upstream of the flame arresters, which will allow the switching to
be done without interrupting operations. Care must be taken to assure that
7.6. References 151
7.6. References