‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬

‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬


‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

Structural Description
-dimension of the tank = 20*28 m
-clear height =5.5 m
-water height =5 m
-the roof is flat slab with column head
-thickness of slab = 23 cm
-Spacing between the column:-
In longitudinal direction = 5.6 m
In transverse direction =5m
-column = 40*40 cm
-column head =1.25*1.25 m
- Column head height = 37 cm
-the wall variable thickness
At the bottom = 95 cm
At 2m from the bottom =50 cm
At the top = 30 cm
-The wall condition fixed - hinged
- Thickness of raft = 95 cm
- The raft rested on the plain concrete
- The raft rested on the pile
-Diameter of the pile = 50 cm
- The pile capacity = 70 t

-design all element of the tank by sap 2000 programe


‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

1-design the slab


ɣ r.c = 2.5 t/m3
fy = 3600 kg/cm2
Live load = 0.25t/m2
Covering =0.2t/m2

from sap programe calculation:


x- direction

Column strip M-ve = 8 t.m/m


M+ve = 3.5t.m/m
Field strip
M-ve = 4.5 t.m/m
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

M+ve = 1.9 t.m/m


By equations:-
1-
Column strip
M=8t.m/m

Depth = 20 cm ts = 23cm

As = 14cm2 take 8 Ø 16 /m

M=3.5t.m/m
As =6.7cm2 take 8 Ø 12 /m

Field strip

M-ve = 4.5 t.m/m


As =8.3cm2 take 8 Ø 12 /m

M+ve = 2.1 t.m/m


As =4cm2 take 8 Ø 12 /m
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

y- direction
Reinforcement in y direction as X direction

Column strip
M-ve As = 14cm2 take 8 Ø 16 /m
M+ve As = 6.7cm2 take 8 Ø 12 /m

Field strip

M-ve As = 14cm2 take 8 Ø 16 /m

M+ve As = 6.7cm2 take 8 Ø 12 /m


‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

2-design column

From sap maximum reaction = 38t


H = 5.5
Braced column
a

At base cas(1) at top cas(2)


K=0.8
By equation:-

ƛ= 11< 15 short column


Design as short column
By equation:-

Ac =365.25cm2
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

‫‪Take column = 40*40cm‬‬


‫‪As= 1%Ac‬‬
‫‪As=16cm2‬‬
‫‪Take AS‬‬ ‫‪4 Ø 16‬‬ ‫‪+ 4 Ø 18‬‬

‫‪3-design column head‬‬

‫‪As1= 0.04*16*5.6 = 3.584 cm2‬‬ ‫‪take 4 Ø 16‬‬


‫‪As2= 0.04*16*5 = 3.2 cm2‬‬ ‫‪take 4 Ø 16‬‬
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

4-design wall
From sap :-

y- direction
Load on wall D.L+L.L+water
Assume the tank fill of water
The wall condition fixed - hinged
Maximum Moment at the bottom = 11.1t.m/m
Normal force (compression) = -12.11t.m
Take Bcr =0.75
Take factor =0.28
Category three
Design section subjected to B.M & N.F
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

From equation:-
Inside the tank:-
Water section:-

Minimum Thickness = 650mm


Take tw = 95cm
*check stress
From equation:-

= 0.127 n/mm2

=0.766 n/mm2
Ft =0.645n/mm2

=80 mm <100 from schedule (4-16) page 4-60 ECP203-2007


‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

=1

=3n/mm2

=3n/mm2

Safe

e=M/N = 0.917m
e/t =0.966>0.5 design as tension failure us es
es=e+0.5t-cov = 1.34m
Mu=Nu*es =24.32t.m
From equation:-

As raq =8.9cm2 take As= 7 Ø 20/m


-Air section:-
Maximum Moment at the2.5 from the bottom = 5t.m/m
Normal force (compression) = -12.11t.m
Take Bcr =0.75
Category three
Design section subjected to B.M & N.F
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

e=M/N = 0.41m
e/t =0.43<0.5 design as compression failure us interaction diagrams
Calculate the equation:-

= 0.0509

=0.021
From diagrams
=1.9

As =4.75cm2 take As= 7 Ø 12/m

Outside the tank


Erath pressure
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

q= 0.2t/m
ɣ=1.8t/m3
Ka=0.33
Hwall= 5.5m
E1=Ka*q = 0.1t/m
E2=Ka*hw*ɣd =3.4t/m

Design water section:-


Moment at 2.5m =1.9t.m/m
Normal force =-12.11t/m
Thickness = 50 cm
Bcr =0.85
From equation stage (1) and from equation stage (2)

As req =2cm2 take As= 5 Ø 12/m<7 Ø 20/m safe


‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

Design water air section:-


Moment at the bottom =7.33t.m/m
Normal force =-12.11t/m
Thickness = 95 cm
Bcr =0.85
From equation equation stage (2)

As req =6 cm2 take As= 7 Ø 12/m

The reinforcement in X- direction take As= 7 Ø 12/m

5-design Raft
From sap :-
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

X-direction
Load on raft D.L+L.L+water+ load from column +(moment &normal)
force from wall
Assume the tank fill of water
The raft rested on the pile
Take Bcr =0.85
Take factor =0.28
Category three
Design section subjected to B.M & N.F
M-ve = 17.52 t.m/m M+ve = 12.2t.m/m
N= +12.1t/m
From M- ve =17.52t.m/m

T(mm)=831mm

Design water section:-


M + ve = 12.2t.m/m
N= +12.1t/m
Minimum Thickness = 85mm
Take Thickness = 95cm
From equation:-

*check stress
From equation:-
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

‫‪= 0 .127 n/mm2‬‬

‫‪=0.811 n/mm2‬‬
‫‪Ft =0.93/mm2‬‬

‫‪=1079.7 mm >600mm‬‬ ‫‪from schedule (4-16) page 4-60 ECP203-2007‬‬

‫‪= 1.7‬‬

‫‪=3n/mm2‬‬

‫‪=1.76n/mm2‬‬

‫‪Safe‬‬
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

e=M/N = 1m
e/t =1.05>0.5 design as tension failure us es
es=e+0.5t-cov = 1.425m
Mu=Nu*es =25.86t.m
From equation:-

As raq =17.6cm2 take As= 7 Ø 20/m


-Air section:-
Maximum Moment = 17.52t.m/m
Normal force (compression) = +12.11t.m
Take Bcr =0.85
Category three
Design section subjected to B.M & N.F

e=M/N = 1.44m
e/t =1.5>0.5 design as tension failure us es
es=e+0.5t-cov = 1.865m
Mu=Nu*es =33.84t.m
From equation:-

As raq =20.9cm2 take As= 7 Ø 20/m


‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

y- Direction
Reinforcement in y direction as X direction
Water section take As= 7 Ø 20/m

Air section take As= 7 Ø 20/m

6-pile capacity
From sap :-
pile capacity
c118 -6.82E-07 c27 8.097086 c87 3.27E-07 c103 27.30554
c109 -6.53E-07 c51 9.790114 c75 3.56E-07 c100 27.3056
c107 -6.24E-07 c94 9.79018 c66 3.85E-07 c39 27.3067
c95 -5.95E-07 c45 9.790311 c53 4.15E-07 c36 27.30676
c119 -5.70E-07 c88 9.790378 c20 4.19E-07 c72 29.74005
c86 -5.66E-07 c73 10.82026 c44 4.44E-07 c68 29.74017
c74 -5.37E-07 c67 10.82038 c32 4.73E-07 c102 29.8546
c65 -5.07E-07 c113 11.12298 c30 5.02E-07 c101 29.85463
c52 -4.78E-07 c115 11.12303 c21 5.31E-07 c38 29.85579
c120 -4.59E-07 c24 11.12321 c111 3.232452 c37 29.85582
c43 -4.49E-07 c26 11.12326 c117 3.23247 c62 33.65326
c31 -4.20E-07 c114 12.12072 c22 3.232525 c83 33.65328
c29 -3.91E-07 c25 12.12098 c28 3.232544 c57 33.65338
c13 -3.62E-07 c105 16.21605 c106 5.714983 c78 33.6534
c121 -3.47E-07 c98 16.2162 c97 5.715165 c49 37.65176
c14 -2.51E-07 c41 16.2166 c42 5.715268 c47 37.65185
c122 -2.35E-07 c34 16.21676 c33 5.71545 c92 37.65187
c15 -1.39E-07 c104 22.25293 c64 8.012966 c90 37.65196
c123 -1.24E-07 c99 22.25302 c85 8.012975 c48 41.54199
c16 -2.73E-08 c40 22.25374 c55 8.013107 c91 41.54211
c124 -1.21E-08 c35 22.25384 c76 8.013116 c61 42.11433
c17 8.43E-08 c63 23.94942 c112 8.096894 c82 42.11434
c125 9.95E-08 c84 23.94945 c116 8.096944 c58 42.1144
c18 1.96E-07 c56 23.94958 c23 8.097036 c79 42.11441
‫ﺷﺮﻛﺔ ﻣﯿﺎه اﻟﺸﺮب ﺑﺎﻻﺳﻜﻨﺪرﯾﺔ‬
‫ﻗﻄﺎع اﻟﺪﻋﻢ اﻟﻔﻨﻲ‬
‫إدارة اﻟﺘﺼﻤﯿﻤﺎت اﻟﻤﺪﻧﯿﺔ واﻟﻤﻌﻤﺎرﯾﺔ‬
‫اﻻدارة اﻟﻌﺎﻣﺔ ﻟﻠﺪﻋﻢ اﻟﻔﻨﻲ‬

‫‪c126‬‬ ‫‪2.11E-07‬‬ ‫‪c77‬‬ ‫‪23.9496‬‬ ‫‪c69‬‬ ‫‪43.37459‬‬ ‫‪c71‬‬ ‫‪43.37452‬‬


‫‪c110‬‬ ‫‪2.40E-07‬‬ ‫‪c50‬‬ ‫‪26.17503‬‬ ‫‪c60‬‬ ‫‪46.30157‬‬ ‫‪c59‬‬ ‫‪46.3016‬‬
‫‪c108‬‬ ‫‪2.69E-07‬‬ ‫‪c93‬‬ ‫‪26.17515‬‬ ‫‪c81‬‬ ‫‪46.30157‬‬ ‫‪c80‬‬ ‫‪46.3016‬‬
‫‪c96‬‬ ‫‪2.98E-07‬‬ ‫‪c46‬‬ ‫‪26.1752‬‬ ‫‪c70‬‬ ‫‪48.01741‬‬
‫‪c19‬‬ ‫‪3.08E-07‬‬ ‫‪c89‬‬ ‫‪26.17532‬‬