CASH OUT FLOW

Total
No Deskripsi harga 1-3 4-6 7-9 10-12 13-15 16-18 19-21 22-24
1 Pengadaan Material 0
1.1 Tower Suspension 0
1.2 Tower Tension 0
1.3 Conductor ACSR 2x450-A1/S1B-54/7 0
1.4 Earthwire GSW 95 mm² 0
1.5 Insulator for suspension 0
1.6 Insulator for tension 0
1.7 Fittings for suspension 0
1.8 Fittings for tension 0

2 Pekerjaan Konstruksi 0
2.1 Resurvey & soil test 0
2.2 Pembebasan lahan 0
2.3 Pondasi tower suspension 0
2.4 Pondasi tower tension 0
2.5 Erection tower suspension 0
2.6 Erection tower tension 0
2.7 Stringing 0
2.8 Transport material (JKT-Site 0
2.9 Site overhead 0

3 Total biaya 0

Kumulatif