Rs. In lakhs
Sl DESCRIPTION UNIT QTY RATE TOTAL
No
1 11kV AB switch without earth Nos. 2 0.366 0.733
2 11 kV VCB Breaker Nos 1 1.054 1.054
3 11 kV CTs ( Single Phase) Nos 3 0.201 0.602
4 11 kV LAS Nos 3 0.021 0.064
5 Relay & control panel for LV breaker Nos 1 0.847 0.847
6 Structure LS 2.040 2.040
7 Control cables LS 0.301 0.301
8 Busbar arrangement LS 0.375 0.375
9 Foundation materials LS 0.313 0.313
10 Sub total 6.329
Contingencies 1 % 0.063
Cost of materials and equipments 6.393
Labour and transport 15% 0.959
Cost of materials and labour 7.352
Establishment and Supervision Charges @15% 1.103
Total 8.454
Rs. In lakhs
Sl DESCRIPTION UNIT QTY RATE TOTAL
No
1 22kV AB switch without earth Nos. 2 0.278 0.556
2 22 kV VCB Breaker Nos 1 2.107 2.107
3 22 kV CTs ( Single Phase) Nos 3 0.271 0.813
4 22 kV LAS Nos 3 0.035 0.106
5 Relay & control panel for LV breaker Nos 1 0.847 0.847
6 Structure LS 4.071 4.071
7 Control cables LS 0.287 0.287
8 Busbar arrangement LS 0.394 0.394
9 Foundation materials LS 0.313 0.313
10 Sub total 9.491
Contingencies 1 % 0.095
Cost of materials and equipments 9.586
Labour and transport 15% 1.438
Cost of materials and labour 11.024
Establishment and Supervision Charges @15% 1.654
Total 12.678
Rs. In lakhs
Sl DESCRIPTION UNIT QTY RATE TOTAL
No
1 33kV AB switch without earth Nos. 2 0.187 0.374
2 33 kV VCB Breaker Nos 1 2.107 2.107
3 33 kV CTs ( Single Phase) Nos 3 0.271 0.813
4 33 kV LAS Nos 3 0.037 0.112
5 Relay & control panel for LV breaker Nos 1 0.847 0.847
6 Structure LS 7.431 7.431
7 Control cables LS 0.301 0.301
8 Busbar arrangement LS 0.394 0.394
9 Foundation materials LS 0.313 0.313
10 Sub total 12.692
Contingencies 1 % 0.127
Cost of materials and equipments 12.819
Labour and transport 15% 1.923
Cost of materials and labour 14.742
Establishment and Supervision Charges @15% 2.211
Total 16.953
Rs. In lakhs
Sl DESCRIPTION UNIT QTY RATE TOTAL
No
1 110 kV AB switch without earth Nos. 1 0.886 0.886
2 110 kV AB switch with earth Nos 1 1.118 1.118
3 110 kV SF6 Breaker 40 kA Nos 1 5.661 5.661
4 110 kV CTs ( Single Phase) Nos 3 1.369 4.107
5 Relay & control panel Nos 1 4.056 4.056
6 Structure LS 12.470 12.470
7 Control cables LS 1.691 1.691
8 Busbar arrangement LS 1.691 1.691
9 Foundation materials LS 1.980 1.980
10 Sub total 33.659
Contingencies 1 % 0.337
Cost of materials and equipments 33.996
Labour and transport 15% 5.099
Cost of materials and labour 39.095
Establishment and Supervision Charges @15% 5.864
Total 44.960
Rs. In lakhs
Sl DESCRIPTION UNIT QTY RATE TOTAL
No
1 Civil works including foundation LS 72.570 72.570
2 230 kV, SF6 Breaker Nos 1 12.863 12.863
3 230 kV, CT Nos 3 2.422 7.266
4 230 kV Isolator with earth blades Nos 1 2.585 2.585
5 230 kV Isolator without earth blades Nos 4 1.788 7.152
6 Relay panel Nos 1 8.269 8.269
7 Structure LS 33.940 33.940
8 Control cables LS 7.768 7.768
9 Busbars, insulators, hardwares LS 5.865 5.865
10 Shielding & Earthing LS 2.933 2.933
Sub total 161.212
Contingencies 1 % 1.612
Cost of materials and equipments 162.824
Labour and transport 15% 24.424
Cost of materials and labour 187.247
Establishment and Supervision Charges @15% 28.087
Total 215.334
Overall Cost
176.321
82.200
93.300
6.329
20.865
4.704
1.818
12.486
0.891
5.250
10.500
22.560
3.385
0.900
87.400
28.941
3.473
0.281
208.770
14.564
1.188
16.652
5.320
808.100
24.243
832.343
83.234
83.234
8.323
1007.135
1007.135
108.267
1115.403