You are on page 1of 2

RISK ASSESSMENT

PRODUCTION TITLE: Magazine Photoshoot PRODUCTION DATES: 27/04/19 - 29/05/17

TEAM NAMES: Evie Wood, Scarlet Goodwin

DATE OF RISK ASSESSMENT: 27/04/18 RISK ASSESSMENT CONDUCTED BY: Evie


Wood

LOCATION POTENTIAL PERSONS PROPERTY RISK FURTHER PERSONS


OF HAZARD: WHO MAY WHICH MAY ASSESSMEN ACTION RESPONSIB
FILMING BE BE T: REQUIRED LE:
AND DATE: HARMED: DAMAGED: LOW, TO
MODERATE, CONTROL
HIGH, RISK:
EXTREME

Studio Tripping Team & N/A High Make sure Team


Cleethorp over members everyone
es and wires and of the knows
Grimsby camera public. where the
equipment camera
. equipment
is and
make sure
it isn’t
trailing
across
the floor
when
possible.

Studio Fire Team & Surroundi Moderate Be Members


Cleethorp members ng vigilant of the
es and of the buildings of our public
Grimsby public. . surroundi and team
ngs to members.
make sure
any fires
are
reported
immediate
ly before
it went
out of
control.

Studio Camera Camera N/A High Be Team


Cleethorp equipment equipment careful
es and getting . when
Grimsby damaged handling
the
equipment
and keep
it away
from
areas
deemed to
be an
area of
danger
and also
the
members
of the
public.

ESSENTIAL CONTACT NUMBERS

EMERGENCY SERVICES

FIRE BRIGADE 999

AMBULANCE 999

POLICE 999

COASTGUARD 999

You might also like