In the Architect’s Code of Ethics, to whom does the Architect have responsibility to consider needs and aesthetic and

functional requirements?
 A. contractor
 B. public
 C. manufacturers/dealers
 D. client

Under PD 1096, which of the following standards/requirements must be complied with in order to obtain a building permit?
 A. structural design
 B. zoning/land use
 C. line and grade
 D. all listed items

What type of specifications is one where any manufacturer whose product meets the specified performance and description
may bid?
 A. descriptive
 B. closed
 C. brand name
 D. open

What project management tool used by architects which consists of identifying the most critical set of activities and
computing critical path schedules for implementation?
 A. critical path method
 B. Gantt Chart
 C. Project breakdown structure method
 D. Network analysis

Under the architect’s design-build services on a guaranteed maximum cost, which of the following conditions should be
observed?
 A. savings on project cost go to client only
 B. none of listed items
 C. savings on project cost go to architect only
 D. 20 percent of project cost as architect’s fee

In the architect’s range of services, which of the following comprise/s specialized allied services?
 A. all listed items
 B. acoustics
 C. physical planning
 D. landscape design

Which of the following describes the percentage of cost method of compensation for architect’s services?
 A. establishes a fixed sum/reimbursement for architect’s technical time/overhead
 B. flexible; does not affect owner-architect agreement in case of changes
 C. adds technical services costs/uses as multiplier for overhead/profit
 D. applies only to non-creative work pre-design services
Under BP 220, what is the minimum fire-resistance rating for a firewall?
 A. four hours
 B. two hours
 C. three hours
 D. one hour

Under Article 1723 of the Civil Code, which of the following is true?
 A. Action against erring architect/engineer must be brought within 15 years following the collapse of the building.
 B. None of the listed items.
 C. Contractor is liable for damages caused by defective plans/specifications.
 D. Acceptance of building implies waiver of any cause of any action due to defects in building.

Which of the following is the most disadvantageous to both architect and client as a method of compensation?
 A. per diem plus reimbursable expenses
 B. percentage of construction cost
 C. lump sum or fixed fee
 D. all listed items