You are on page 1of 4

Muhammad Noman

Personal info
First name: Muhammad
Last name: Noman
Date of birth: 22/03/1991
Web: https://www.linkedin.com/in/muhammad-noman-91200682/
Nationality: Pakistani
Address: H.No 234, Mohallah Malik Nasarullah Jan, Rawail Gali, Nouthia Qadeem,
Saddar Cantt, Peshawar, Pakistan
Phone number: 0346-8482210
Email address: engr.muhammadnoman@gmail.com

Summary
A competent  Electrical  Engineer  with  comprehensive  knowledge  of  quality Engineering design and
construction supervision of electrical power systems & components to the required  speci cations,
focusing on safety, reliability & sustainability.

Total Years of Experience: 4 Years & 1 Months

Work experience
Electra Electrical Design Engineer 01/2017 - present
Consultants
KPK Projects:Koto Hydro power Project, 40.8 MW & Machai Hydro power Project, 2.6
Pakistan MW

Details pertaining to my job duties are as follows;

Detailed design review of Main single line diagram with conformance to the
design practicality and required speci cations.
Preparation of design proposals for grid connectivity.
Design review and nalization of protection & metering design drawings
pertaining to the Generators, Main Transformers, 132 kV Transmission lines,
Busbars & Auxiliary systems.
Design review & nalization of 132 kV outdoor AIS according to the
Employer's requirements and international standard practices.
Ensuring safe and adequate electrical clearances for outdoor switchyard
installations.
Design review of lightning protection schemes for switchyard.
Reviewed detail design of low voltage systems i.e CCTV, Telecommunication
and re & smoke detecting systems etc.
Reviewed and performed detailed design calculations pertaining to the
adequate sizing of station service transformers and standby diesel
generators.
Performed detailed design analysis of DC system in accordance with IEEE
485 - 1997 to select the suitable capacity of the battery system according to
the required load demand.
Design review of electrical layout drawings e.g. powerhouse, outdoor
switchyard, control room & switchgear room etc.
Work experience
Reviewed & performed Electrical cable size calculations as per IEC 60364
and analyzed the results of Short circuit calculations in accordance with the
guidelines speci ed in IEC 60909.
Studied the grounding system design according to IEEE Std 80-2000 and
recommended technical solutions to the EPC Contractor regarding the
selection of earthing material, size of earthing conductor and mesh etc for
improved system reliability and personnel safety in the event of different
electrical faults.
Reviewed and performed design calculation of lightning protection system
for 132 kV outdoor switchyard using Rolling Sphere Method asspeci ed in
IEC 62305.
Design review of O & M Manuals and As Built Drawings of Machai HPP.
Study the testing & commissioning protocols of Machai HPP in line with the
guidelines and procedures being speci ed in IEC 60545-1976.

Punjab Jr. Engineer (Electrical) 10/2013 – 12/2016


Hydropower
Consultants Projects: Marala HPP, 7.64 MW; Pakpattan HPP, 2.82 MW; Chaianwali HPP, 5.36
Punjab MW & Deg Outfall HPP, 4.04 MW
Pakistan
Details of my job responsibilities are given as under;

Guarantee Test for Horizontal shaft Kaplan Turbine & Generating Unit as per
IEC 60041 & 60043 respectively.
Detailed study and monitoring of Electrical & Mechanical parameters during
72 Hour Full Load Run Test.
Analyzing transient behavior of power plant during Load Rejection Test.
Review SCADA designs for essential modi cations.
Supervised installation and testing of SCADA systems to ensure
functionality & simpli ed user experience.
Preparation of Test Reports for Employer pertaining to the E & M tests
carried out at site. 
Surveillance of compliance to quality standards & speci cations. 
Testing & commissioning of 6.3 kV, Two (2)  numbers of hydro generators
with rated capacity of 1.41 MW each;
1.  Start up and trial operation tests
2.  Short Circuit Characteristic test
3.  No load Characteristic Test 

Grounding test of power plant using earthing test set UNI-T UT 521.

11 kV, 6.3 kV & 0.4 kV cable tests;


1. Megger Test
2.  High voltage A.C Test
3.  High Voltage D.C Test

Factory acceptance tests of distribution transformers at PEL (Pak Elektron


Ltd.) facility;

1.  Measurement for Break down voltage of T/F Mineral Oil using Dielectric
Tester
2.  Measurement of short circuit impedance and load losses.
3.  Measurement of voltage ratio and check of phase displacement
4. Measurement of no load losses & current
5.  Separate source voltage withstands test / power frequency test.
6. Induced over voltage withstand test.
Work experience
7. Measurement of winding resistance.

Detailed study and approval of design drawings, speci cations and technical
documents.
Design review and approval of interconnection study report including load
ow studies, transient stability analysis and short circuit levels during single
phase, phase to phase and 3 phase faults.
Performed voltage drop, ampicity and technical losses calculations for
Transmission lines.
Transmission Lines Route survey and visits to interconnected grid stations
for data collection.
Design & construction of single circuit & double circuit 11 kV overhead
transmission line as per WAPDA specs.
Design review and approval of Plan & Pro le Diagrams for double circuit &
triple circuit overhead transmission lines.
Design of 11 kV Incoming interconnected panels at Grid End as per WAPDA
speci cations devised in P-44.  
Design and selection of surge arrestors for protection of transmission lines
against lightning stokes.
Detailed design review of setting calculations for Overcurrent protection
(IDMT, De nite & Instantaneous) for Step-Up Main Transformers and
Transmission lines Feeder relay PCS 9611.
Design calculations and settings of Earth Fault protection for Transmission
lines.
Testing and commissioning of power house bridge crane as per FEM
standards.
Powerhouse building and Spillway AC lighting design as well design of
emergency lighting on DC system. 
Performed detailed grounding mesh calculations for powerhouse as per
IEEE Std 80- 2000.
Performed short circuit calculations as per IEC 60909.
Performed UPS & battery sizing design & calculations in accordance with
IEEE 485-1997.
Detailed design calculations for 230 V & 400 V A.C distribution system as
well as cable sizing as per IEC 60364.
Detailed design calculations for generator protection as per IEEE C37.101.
Design of structural lightning protection as per BS EN 62305.
Design analysis for liquid immersed and dry type transformers as per IEC-
76, IEC-600726.
Design review of 0.4 kV, 6.3 kV and 11 kV switchgear panels.
Performed electrical design calculations for the distribution transformers
and standby diesel generators. 
Performed design review of power transformer installation drawings &
lightning protection.
Performed selection and sizing of lightning arresters as per IEC & IEEE
standards.
Conducted site visits to determine and validate eld dimensions.
Processing of Commercial Invoices of equipment imported from abroad.
Check and verify the consignments arrived at site from abroad.
Detailed design review of internal & external lighting schemes.
Veri cation of interim payment certi cates (IPCs) of the contractors.
Meetings and frequent letter correspondence with Client and Contractor to
settle down the issues regarding design services and installation of
equipment at site.
Education
NWFP University Electrical Engineering (POWER) 10/2009 – 09/2013
of Engg & Marks Obtained: 3.24 / 4 CGPA (81%)
Technology
Peshawar
Pakistan

Islamia College HSSC (Pre-Engineering) 2007 – 2009


Peshawar Marks Obtained: 898/1100 (81.64%)
Pakistan

Islamia Collegiate SSC 2005 – 2007


School Marks Obtained: 898/900 (87.11%)
Peshawar
Pakistan

Skills
Languages Computer Pro ciency
English  Microsoft Word 
Urdu  Microsoft Excel 
Pujabi  Microsoft Powerpoint 
Pushto  Auto CAD 
MATLAB 
C++ 

You might also like