F1 F3 F3 F3 GENERAL NOTES :-
2T8/15cmc/c
F5
LOCATION : FUJAIRAH / AL SHERIA
STB F3 PLOT NO. : H/38
F1 F2
CF2 CF2
4T16
FOUNDATION LAYOUT
REV. NO. DESCRIPTION DATE
CLIENT :-
STB
MR.AHMED HUSSAIN ALI AL SHAMAR
PRINCIPAL CONSULTANT :-
3) The foundation depth shall not be less than 1.2m below the existing ground level TYPE SIZE THICKNESS REMARKS FAX: +9719 2221619
SHORT DIRECTION LONG DIRECTION SHORT DIRECTION LONG DIRECTION P.O.BOX: 9500 FUJ.
4) The foundation ground must be proof-rolled by heavy compactor to attain a density (cm x cm) (cm) STEEL STEEL
CONSULTING & ENGINEERING
STEEL STEEL
not less then 95% at that obtained from laboratory compaction test
5) Two layers of boulders of 25mm thickness and then replace three layers of roads F1 130X160 35 T 12@15cmc/c T 12@15cmc/c - - - MAIN CONTRACTOR :
compaction tests should be taken for all the road base layers FOUNDATION LAYOUT
The supposed bearing capacity 10 tons/m2 is available in this location. F5 100X100 30 T 12@20cmc/c T 12@20cmc/c - - -
DRAWING NO. REVISION NO.
S.04 1
SUBMISSION DATE SCALE
21-10-2014 1:100
PROJECT ID. : PLAN ID. :
****** ***