5T20

STB

F1 F3 F3 F3 GENERAL NOTES :-

STB STB STB STB


F5
STB
F5
F3 F3
CF1
F4
F2
F4
STB
F3

2T8/15cmc/c
F5
LOCATION : FUJAIRAH / AL SHERIA
STB F3 PLOT NO. : H/38

F1 F2
CF2 CF2

4T16
FOUNDATION LAYOUT
REV. NO. DESCRIPTION DATE

CLIENT :-

STB
MR.AHMED HUSSAIN ALI AL SHAMAR

PRINCIPAL CONSULTANT :-

TEL: +9719 2221617

FAX: +9719 2221619

P.O.BOX: 9500 FUJ.


CONSULTING & ENGINEERING

FOUNDATION NOTES SCHEDULE OF FOOTINGS


LOCAL CONSULTANT :-
1) Structure is design for (G) only
REINFORCEMENT (BOTTOM STEEL) REINFORCEMENT (TOP STEEL)
TEL: +9719 2221617

3) The foundation depth shall not be less than 1.2m below the existing ground level TYPE SIZE THICKNESS REMARKS FAX: +9719 2221619

SHORT DIRECTION LONG DIRECTION SHORT DIRECTION LONG DIRECTION P.O.BOX: 9500 FUJ.

4) The foundation ground must be proof-rolled by heavy compactor to attain a density (cm x cm) (cm) STEEL STEEL
CONSULTING & ENGINEERING
STEEL STEEL
not less then 95% at that obtained from laboratory compaction test
5) Two layers of boulders of 25mm thickness and then replace three layers of roads F1 130X160 35 T 12@15cmc/c T 12@15cmc/c - - - MAIN CONTRACTOR :

base material of thickness 250mm.


F2 150X180 35 T 12@15cmc/c T 12@15cmc/c - - -
6) Refer soil report :BUILDING MATERIAL & TESTING LAB.
LAB REF NO.8074-1FMBL/2014
F3 160X200 35 T 12@15cmc/c T 12@15cmc/c - - -
7) It is in the main villa , so main is the reference level for this
addition.Excavate the construction area 2.5m from the road level.So,
F4 200X220 35 T 16@20cmc/c T 16@20cmc/c - - -
two layers of boulders of size (150-200 mm) of 250 mm thickness
and then place three layers of road base material of thickness PROJECT NAME :

250 mm each to get the proposed foundation level of 1.2 m.


CF1 220X390 35 T 16@15cmc/c T 16@15cmc/c T 16@20cmc/c T 16@20cmc/c -
PRIVATE VILLA EXTENSION
Compact each layer of road base material upto 98% of the maximum
dry density of the soil using heavy vibratory roller CF2 150X200 35 T 12@15cmc/c T 12@15cmc/c T 12@15cmc/c T 12@15cmc/c - DRAWING TITLE :

compaction tests should be taken for all the road base layers FOUNDATION LAYOUT
The supposed bearing capacity 10 tons/m2 is available in this location. F5 100X100 30 T 12@20cmc/c T 12@20cmc/c - - -
DRAWING NO. REVISION NO.

S.04 1
SUBMISSION DATE SCALE
21-10-2014 1:100
PROJECT ID. : PLAN ID. :
****** ***