SUBJECT : PROCEDURE NO.

: CSP-01

FORM CSP-01/1 REV. NO. : 0

ISSUED : -
APPROVAL SHOP DRAWING
PROYEK TOWER BREZEE PAGE : Attachment 1

DAFTAR SHOP DRAWING STRUKTUR UNTUK PROSES PERSETUJUAN


No : 0273/TATA-BPRB/SD-STR/V/2018
URIAN/JENIS PEKERJAAN NO. GAMBAR R JADWAL PENGAJUAN STATUS KETERANGAN
NO JUDUL SHOP DRAWING (SHOP DRAWING)
Denah Listplank GRC Lantai 1 Sisi Selatan As 9-10/C
1 SD-GRC-S-1 R1 31-05-2018
(Mock Up)

Tampak Listplank GRC Lantai 1 Sisis Selatan As 9-10/C


2 SD-GRC-S-2 R1 31-05-2018
(Mock Up)

Potongan A Listplank GRC Lantai 1 Sisis Selatan As 9-


3 SD-GRC-S-3 R1 31-05-2018
10/C

Potongan B Listplank GRC Lantai 1 Sisis Selatan As 9-


4 SD-GRC-S-4 R1 31-05-2018
10/C

Detail 1 dan 2 Listplank GRC Lantai 1 Sisis Selatan As


5 SD-GRC-S-5 R1 31-05-2018
9-10/C

Detail A dan B Listplank GRC Lantai 1 Sisis Selatan As


6 SD-GRC-S-5 R0 31-05-2018
9-10/C

Tangerang, 31-05-2018
Distribusi : Pemberi Tugas Diperiksa/Disetujui Kontraktor,
PT. Jaya Real Property,Tbk PT. JAYA CM PT. TATAMULIA NUSANTARA INDAH

P. Anggoro Seno Holil Muhamad L. Haryo Priyo Jatmiko, ST


Manajer Proyek Construction Manager Project Manager
Tanggal: Tanggal:

CSP-01-1.DOC