Project Unit Document Type Rev Date

CALCULATION NOTE A1 6/16/2018

Mudmat structural design loads calculation - (Max My Case)


This spreadsheet calculates the following
1) Design bearing pressured and frictional stresses for the mudmats
2) Design loads for the mudmat connections
-X

C1 C1

Additional Mudmat Main Mudmat Additional Mudmat

-Y +Y
d
L
C2
C2

+X

B
Figure 1
Figure 1 shows plan view of the mudmat system, with Main mudmat at the center and two
Additional mudmats on both sides. C1 and C2 are the connections between the mudmats.
Main mudmat details
Length, L1 = 17 m
Breadth, B1 = 10 m
Area, A1 = 170 m2
Additional mudmat details (Ref. Figure 1)
Mudmat weight, W = 350 kN
Length, L2 = 17 m
Breadth, B2 = 11 m
Connections distance, d = 14 m
Area, A2 = 187 m2
Overall Foundation Design loads
Note 1: Design loads were obtained from Ref.xx (FLET Foundation Design Report)
Note 2: As a conservative approach, maximum force and moment components from among
various load cases are expected to act simultaneously
Note 3: Loads are inclusive of ISO partial load factors
Fx = 740 kN
Fy = 740 kN
Fz = -2100 kN
Mx = 1100 kNm
My = 3070 kNm
Mz = 810 kNm
Project Unit Document Type Rev Date
CALCULATION NOTE A1 6/16/2018

Overall Geometry Calcualtions


Total foundation breadth, B = B1 + 2.B2 = 32 m
Total foundation length, L = L1 = L2 = 17 m
Area, A = A1 + 2.A2 = 544 m2
Ixx (Refer Figure 1) = L.B3/12 = 46421.33 m4
Iyy (Refer Figure 1) = B.L3/12 = 13101.33 m4

Loads due to vertical loads


Bearing pressure due to vertical load, Bv = Fz/A = 3.86 kPa
(Same for all mudmats)

Loads due horizontal loads and torsion


Considering distribution proportional to area,
Fx on main mudmat, Fx1 = Fx.A1/A = 231.3 kN
Fx on additional mudmat, Fx2 = Fx.A2/A = 254.4 kN

Fy on main mudmat, Fy1 = Fy.A1/A = 231.3 kN


Fy on additional mudmat, Fy2 = Fy.A2/A = 254.4 kN

Mz on main mudmat, Mz1 = Mz.A1/A = 253.1 kNm


Mz on additional mudmat, Mz2 = Mz.A2/A = 278.4 kNm

Loads due to moments


Maximum bearing pressure on Additional mudmats,
due to Mx, B2mx = Mx.(B/2)/Ixx = 0.38 kPa
due to My, B2my = My.(L/2)/Iyy = 1.99 kPa

Maximum bearing pressure on Main mudmats,


due to Mx, B1mx = Mx.(B1/2)/Ixx = 0.12 kPa
due to My, B1my = My.(L/2)/Iyy = 1.99 kPa

Additional mudmat design loads


Max. bearing pressure, B2max = Bv + B2mx +B2my = 6.23 kPa
Min. bearing pressure, B2min = Bv + B2mx - B2my = 2.25 kPa ( >= 0)
Fx2 = 254.4 kN
Fy2 = 254.4 kN
Mz2 = 278.4 kN

Main mudmat design loads


Max. bearing pressure, B1max = Bv + B1mx +B1my = 5.97 kPa
Min. bearing pressure, B1min = Bv + B1mx - B1my = 1.99 kPa ( >= 0)
Fx1 = 231.3 kN
Fy1 = 231.3 kN
Mz1 = 253.1 kN
Project Unit Document Type Rev Date
CALCULATION NOTE A1 6/16/2018

Mudmat connections design moment calculation


Mudmat connections, C1 and C2 (Figure 1) are expected to transfer Forces in 3 directions
and moment about X axis (effectively constraining all degrees of freedom of the additional mudmats)

From the overall foundation design loads and max/min bearing pressure, it can be observed
that the bearing pressure varies significantly in the length (X) direction, whereas minimal variation
is expected in the breadth (Y) direciton. Figure 2 shows the pressure distrubtion along X axis
Figure 3 shows pressure distribution along Y axis.

Main mudmat Additional Mudmat

-Y +Y

Figure 2

C2 W C1

+X -X

b3
b1 b2

Figure 3

Bearing pressure, b1 = B2max = 6.23 kPa


Bearing pressure, b3 = B2min = 2.25 kPa
Bearing pressure, b2 = (b1+b2)/2 = 4.24 kPa

Moment at connection C2, Mxc2 = 1729.8 kNm


= Moment due to bearing pressure - Moment due to self weight
= (1/2).(b1+b2).(L2/2).B22/2 - W.B2/4

Moment at connection C1, Mxc1 = 705.5 kNm


= Moment due to bearing pressure - Moment due to self weight
= (1/2).(b2+b3).(L2/2).B22/2 - W.B2/4

Vertical load at connection C2, Fzc2 = 314.5 kN (Upward)


= Force due to bearing pressure - Force due to self weight
= (1/2).(b1+b2).(L2/2).B2 - W/2
Project Unit Document Type Rev Date
CALCULATION NOTE A1 6/16/2018

Vertical load at connection C1, Fzc1 = 128.3 kN (Upward)


= Force due to bearing pressure - Force due to self weight
= (1/2).(b2+b3).(L2/2).B2 - W/2

Y Horizontal load at conneciton C2/C1, Fyc = 147.1 kN


= Direct force + force due to torsion on mudmat
= Fy2/2 + Mz2/2

X Horizontal load at conneciton C2/C1, Fxc = 127.2 kN


= Direct force
= Fx2/2

Structural Analysis Methodology

Additional Mudmats

Selfweight

Boundary conditions
at guide system

Max bearing pressure - uniformly distributed

Main Mudmat

Boundary conditions
at Piping module
Selfweight
contact points

Connection
Design Loads
Project Unit Document Type Rev Date
CALCULATION NOTE A1 6/16/2018

Max bearing pressure - uniformly distributed


Project Unit Document Type Rev Date
CALCULATION NOTE A1 6/16/2018

Mudmat structural design loads calculation - (Max My Case)


This spreadsheet calculates the following
1) Design bearing pressured and frictional stresses for the mudmats
2) Design loads for the mudmat connections
-X

C1 C1

Additional Mudmat Main Mudmat Additional Mudmat

-Y +Y
d
L
C2
C2

+X

B
Figure 1
Figure 1 shows plan view of the mudmat system, with Main mudmat at the center and two
Additional mudmats on both sides. C1 and C2 are the connections between the mudmats.
Main mudmat details
Length, L1 = 17 m
Breadth, B1 = 10 m
Area, A1 = 170 m2
Additional mudmat details (Ref. Figure 1)
Mudmat weight, W = 350 kN
Length, L2 = 17 m
Breadth, B2 = 11 m
Connections distance, d = 14 m
Area, A2 = 187 m2
Overall Foundation Design loads
Note 1: Design loads were obtained from Ref.xx (FLET Foundation Design Report)
Note 2: As a conservative approach, maximum force and moment components from among
various load cases are expected to act simultaneously. Lowest My is considered,
as this causes maximum loads on connection C1
Note 3: Loads are inclusive of ISO partial load factors
Fx = 740 kN
Fy = 740 kN
Fz = -2100 kN
Mx = 1100 kNm
My = 1700 kNm
Project Unit Document Type Rev Date
CALCULATION NOTE A1 6/16/2018

Mz = 810 kNm

Overall Geometry Calcualtions


Total foundation breadth, B = B1 + 2.B2 = 32 m
Total foundation length, L = L1 = L2 = 17 m
Area, A = A1 + 2.A2 = 544 m2
Ixx (Refer Figure 1) = L.B3/12 = 46421.33 m4
Iyy (Refer Figure 1) = B.L3/12 = 13101.33 m4

Loads due to vertical loads


Bearing pressure due to vertical load, Bv = Fz/A = 3.86 kPa
(Same for all mudmats)

Loads due horizontal loads and torsion


Considering distribution proportional to area,
Fx on main mudmat, Fx1 = Fx.A1/A = 231.3 kN
Fx on additional mudmat, Fx2 = Fx.A2/A = 254.4 kN

Fy on main mudmat, Fy1 = Fy.A1/A = 231.3 kN


Fy on additional mudmat, Fy2 = Fy.A2/A = 254.4 kN

Mz on main mudmat, Mz1 = Mz.A1/A = 253.1 kNm


Mz on additional mudmat, Mz2 = Mz.A2/A = 278.4 kNm

Loads due to moments


Maximum bearing pressure on Additional mudmats,
due to Mx, B2mx = Mx.(B/2)/Ixx = 0.38 kPa
due to My, B2my = My.(L/2)/Iyy = 1.10 kPa

Maximum bearing pressure on Main mudmats,


due to Mx, B1mx = Mx.(B1/2)/Ixx = 0.12 kPa
due to My, B1my = My.(L/2)/Iyy = 1.10 kPa

Additional mudmat design loads


Max. bearing pressure, B2max = Bv + B2mx +B2my = 5.34 kPa
Min. bearing pressure, B2min = Bv + B2mx - B2my = 3.14 kPa ( >= 0)
Fx2 = 254.4 kN
Fy2 = 254.4 kN
Mz2 = 278.4 kN

Main mudmat design loads


Max. bearing pressure, B1max = Bv + B1mx +B1my = 5.08 kPa
Min. bearing pressure, B1min = Bv + B1mx - B1my = 2.88 kPa ( >= 0)
Fx1 = 231.3 kN
Fy1 = 231.3 kN
Mz1 = 253.1 kN
Project Unit Document Type Rev Date
CALCULATION NOTE A1 6/16/2018

Mudmat connections design moment calculation


Mudmat connections, C1 and C2 (Figure 1) are expected to transfer Forces in 3 directions
and moment about X axis (effectively constraining all degrees of freedom of the additional mudmats)

From the overall foundation design loads and max/min bearing pressure, it can be observed
that the bearing pressure varies significantly in the length (X) direction, whereas minimal variation
is expected in the breadth (Y) direciton. Figure 2 shows the pressure distrubtion along X axis
Figure 3 shows pressure distribution along Y axis.

Main mudmat Additional Mudmat

-Y +Y

Figure 2

C2 W C1

+X -X

b3
b1 b2

Figure 3

Bearing pressure, b1 = B2max = 5.34 kPa


Bearing pressure, b3 = B2min = 3.14 kPa
Bearing pressure, b2 = (b1+b2)/2 = 4.24 kPa

Moment at connection C2, Mxc2 = 1501.2 kNm


= Moment due to bearing pressure - Moment due to self weight
= (1/2).(b1+b2).(L2/2).B22/2 - W.B2/4

Moment at connection C1, Mxc1 = 934.0 kNm


= Moment due to bearing pressure - Moment due to self weight
= (1/2).(b2+b3).(L2/2).B22/2 - W.B2/4

Vertical load at connection C2, Fzc2 = 272.9 kN (Upward)


= Force due to bearing pressure - Force due to self weight
= (1/2).(b1+b2).(L2/2).B2 - W/2
Project Unit Document Type Rev Date
CALCULATION NOTE A1 6/16/2018

Vertical load at connection C1, Fzc1 = 169.8 kN (Upward)


= Force due to bearing pressure - Force due to self weight
= (1/2).(b2+b3).(L2/2).B2 - W/2

Y Horizontal load at conneciton C2/C1, Fyc = 147.1 kN


= Direct force + force due to torsion on mudmat
= Fy2/2 + Mz2/2

X Horizontal load at conneciton C2/C1, Fxc = 127.2 kN


= Direct force
= Fx2/2

Structural Analysis Methodology

Additional Mudmats

Selfweight

Boundary conditions
at guide system

Max bearing pressure - uniformly distributed

Main Mudmat

Boundary conditions
at Piping module
Selfweight
contact points

Connection
Design Loads
Project Unit Document Type Rev Date
CALCULATION NOTE A1 6/16/2018

Max bearing pressure - uniformly distributed


2x Footings 2.6m x 9.6m with
1.2m gap between footings
Methodology : Refer 'Foundation Design Report'

#REF!
#REF!
#REF!
#REF!
#REF!
#REF!
(To be updated)