Case study: Airforge building, Pamiers, France
1. The achievement
10 500 m2 of industrial building carrying cranes with a capacity up to 140 t
5 halls of various spans: 16 m, 23 m, 22 m and 2 × 23 m
The total length of the building is 98 m and the main hall is 22 m high
1365 tons of structural steelwork completed in 8 months
2. Description
The project is a new plant to accommodate a big press with a capacity of 40 000 tons and
associated furnaces. 1365 tons of steel were used:
Plate girders: 410 t,
Rolled sections: 673 t,
Gantry girders: 282 t.
Column design is governed by the need to ensure overall stability and satisfy tight horizontal
This material is copyright - all rights reserved. Use of this document is subject to the terms and conditions of the Access Steel Licence Agreement
deflection limits for the overhead cranes. For transverse stability, column bases were fixed,
with 8 holding down bolts per column, of 52 mm diameter.
Longitudinal stability is ensured by wind-bracing on each column line. Cross bracing is used
for the tallest hall. For the other four halls, longitudinal portal frames are adopted. These
provide the greatest freedom of passage, without significant increase in steel weight.
The roof, of 3,1 % slope, consists of steel sheeting externally insulated by rigid rockwool
Created on Friday, October 01, 2010
panels (thickness 60 mm) and a waterproof outer layer of weldable elastomer. The roof is
supported on rolled or welded plate purlins, generally 6 to 12 m long. For the two bays of
24 m, this distance is halved and the purlins are supported on jack rafters that rest on the ridge
beams and eaves beams. One of the characteristics of the roof is that it is partially de-
mountable in order to allow the future replacement of the jacks of the press.
Page 2
Case study: Airforge building, Pamiers, France
The gantry girders for the 140 t cranes are mono-symmetric welded plate girders; their top
flanges are restrained laterally by horizontal lattice beams that resist both wind loads and
horizontal crane forces.
Created on Friday, October 01, 2010
Page 3
Case study: Airforge building, Pamiers, France
To ensure an efficient installation of the industrial plant in this factory, the supply of
necessary equipment was entrusted to the steelwork erector: platforms, footbridges, staircases,
scales, pylons, and pit covers. The assembly of the principal elements of the furnaces was
also entrusted to the steelwork erector to make the best use of the specialist erection
equipment. Notable features were the 8 chimneys of 18,50 m length and the stainless steel
furnace with a total weight of 27t.
3. Project team
Project Team
Architect: AGECA
Structural Engineer: TECHNIP
Client: AIRFORGES
Steelwork: GAGNE
Photos: GAGNE
This material is copyright - all rights reserved. Use of this document is subject to the terms and conditions of the Access Steel Licence Agreement
Created on Friday, October 01, 2010
Page 4
Case study: Airforge building, Pamiers, France
Quality Record
RESOURCE TITLE Case study: Airforge building, Pamiers, France
Reference(s)
ORIGINAL DOCUMENT
TRANSLATED DOCUMENT
Page 5
Case study: Airforge building, Pamiers, France
Wrapper Information
Title* Case study: Airforge building, Pamiers, France
Series
Description* A typical heavy industrial building, with a height of 22m and spans of up to 23m. The steel
superstructure supports gantry girders for an overhead crane with capacity of 140 tonnes.
Valid From
Valid To
Language(s)* English
Approved by
Editor
Last Modified By
Worked Example(s)
Commentary
Discussion
Other
Special
Created on Friday, October 01, 2010
Instructions
Page 6