4. CT Testing on Phase R
After the failure of this two CTs (phase S and
Fig. 4 CT Phase T inner cover melting phase T), the management decided to remove the
CT on phase R from the system as this CT is the
same type and brand and from the same
The two current transformers which failed have manufacturing year. Several tests had been done
been disassembled to observe the type of damage on this CT to analyze and check for a possible
that occurred on the inside of the current failure cause of the other two CTs.
transformers. It was found that both failed CTs had
loose connectors at the inner cover of the CT (the
top cover body with the cover secondary winding).
The phase S CT contained water in the membrane
thus decrease the insulation level.
AC hipot test system up to 100kV being used as 4.5. Insulation Resistance Testing
HV source to inject the HV to test object. The PD
measurement being repeated several times since The purpose of this measurement is to detect the
the noise level from HV source and measurement condition of insulation between winding - ground or
test setup is very high. During PD measurement, between two winding. Common method provided
the corona activities also observed using DayCor the DC voltage and represents the condition of
corona camera. It was observed that the corona insulation to the units in mega ohm (M). It is also
discharge on the CT bushing is small. The PD test seen from the measurement of the polarization
was done by increasing the voltage from 2 kV as index. The aim of the polarization index test is to
starting point for voltage calibration for MPD 600 ensure the proper equipment to be operated or
test set and voltage increased up to 86.6 kV as even transient overvoltage test. Polarization Index
nominal voltage of 150 kV. The MPD 600 test is the ratio between the 10th minute result to the 1st
result shown PRPD as below. The figure 11 shows minute result, with a constant voltage supply.
PRPD from phase R CT when injection voltage up
to 86 kV is applied. The figure 12 shows ORPD
from HV source only. The figure 11 shows that
there are PD activities which are very high.
5. Conclusion
1. It was observed by disassembling the failed
CTs (phase T and S) that both CTs had
loose connection on its body-ground cable
connection in the CT. It was suspected that
this was caused by aging process or
manufacture defect design. It was also
Fig. 11 PD result CT Phase R Test at 86kV found that a lot of water trapped inside the
membrane of CT phase S.
2. The tan delta test for bushing insulation
indicated normal bushing. No suspect on
the bushing failure.
3. Partial discharge test on phase R CT
indicated high PD activities (over 10 nC).
This might indicated the degradation of
insulation material and/or contact problem
inside the CT.
4. High moisture content (3.3%) was
measured on phase R CT. The moisture
content may decrease the insulation of the
material and lead to CT explosion.
References
Fig. 12 PD result for HV source only at 86kV [1] V.K.Prasher, P.J.Thakkar Power Grid India,
EHV Current Transformers - Failure Mode
Analysis & Evaluation Leading to Corrective
and Preventive Actions for Realibility
Enhancment, CIGRE.
[2] OMICRON, DIRANA, CT Analyzer and
CPC 100 / CP TD1.