ETAP

Project: SLD TRAFO CANDIREJO Page: 1


12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 19 20

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 2 0 0 17 0 0 19

Method of Solution: Adaptive Newton-Raphson Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 50.00 Hz

Unit System: English

Project Filename: SLD CANDIREJO SOFIA

Output Filename: D:\MAGANG KITA GAIS\TUGAS AKHIR FIX\SLD CANDIREJO SOFIA\SLD.lfr


ETAP
Project: SLD TRAFO CANDIREJO Page: 2
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP
Project: SLD TRAFO CANDIREJO Page: 3
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 150.000 1 100.0 0.0

Bus2 20.000 1 100.0 0.0

Bus3 0.231 1 100.0 0.0

Bus4 0.231 1 100.0 0.0

Bus5 0.231 1 100.0 0.0 0.009 0.000

Bus7 0.231 1 100.0 0.0

Bus8 0.231 1 100.0 0.0 0.006 0.000

Bus9 0.231 1 100.0 0.0

Bus12 0.231 1 100.0 0.0 0.011 0.000

Bus13 0.231 1 100.0 0.0

Bus15 0.231 1 100.0 0.0 0.020 0.000

Bus16 0.231 1 100.0 0.0 0.003 0.000

Bus18 0.231 1 100.0 0.0

Bus19 0.231 1 100.0 0.0 0.002 0.000

Bus21 0.231 1 100.0 0.0

Bus22 0.231 1 100.0 0.0 0.010 0.000

Bus28 0.231 1 100.0 0.0 0.018 0.000

Bus32 0.231 1 100.0 0.0

Bus43 20.000 1 100.0 0.0

Bus46 0.231 1 100.0 0.0

Total Number of Buses: 20 0.000 0.000 0.079 0.000 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 150.000 Swing 1 100.0 0.0

0.000 0.000
ETAP
Project: SLD TRAFO CANDIREJO Page: 4
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Line/Cable Input Data

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

GJN19 0,6MALN3 2/0 187.0 0.0 1 75 0.167280 0.033920

S3-4/32 0,6MALN1 2/0 180.4 0.0 1 75 0.167280 0.044420

S3-4/32A 0,6MALN1 8 164.0 0.0 1 75 1.330040 0.062830

S3-4/33 0,6MALN1 2/0 167.3 0.0 1 75 0.167280 0.044420

S3-4/33A 0,6MALN1 8 137.8 0.0 1 75 1.330040 0.062830

S3-4/34 0,6MALN1 2/0 183.7 0.0 1 75 0.167280 0.044420

S3-4/34A 0,6MALN1 8 164.0 0.0 1 75 1.330040 0.062830

S3-4/35 0,6MALN1 2/0 173.9 0.0 1 75 0.167280 0.044420

S3-4/35A 0,6MALN1 8 147.6 0.0 1 75 1.330040 0.062830

S3-4/36 0,6MALN1 2/0 164.0 0.0 1 75 0.167280 0.044420

S3-4/36A 0,6MALN1 8 124.7 0.0 1 75 1.330040 0.062830

S3-4/37 0,6MALN1 2/0 183.7 0.0 1 75 0.167280 0.044420

S3-4/37A 0,6MALN1 8 164.0 0.0 1 75 1.330040 0.062830

S3-4/38 0,6MALN1 2/0 180.4 0.0 1 75 0.167280 0.044420

S3-4/38A 0,6MALN1 8 164.0 0.0 1 75 1.330040 0.062830

S3-4/39 0,6MALN1 2/0 167.3 0.0 1 75 0.167280 0.044420

S3-4/39A 0,6MALN1 8 131.2 0.0 1 75 1.330040 0.062830

Line / Cable resistances are listed at the specified temperatures.


ETAP
Project: SLD TRAFO CANDIREJO Page: 5
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

BnD S3-4/31 3-Phase 0.050 20.000 0.231 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000

TRAFO GJN19 3-Phase 60.000 150.000 20.000 12.50 45.00 0 0 0 0 0 12.5000 Dyn 0.000
ETAP
Project: SLD TRAFO CANDIREJO Page: 6
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

BnD S3-4/31 2W XFMR Bus43 Bus3 4437.60 6656.40 8000.00

TRAFO GJN19 2W XFMR Bus1 Bus2 0.46 20.83 20.83

GJN19 Cable Bus2 Bus43 0.78 0.16 0.80

S3-4/32 Cable Bus3 Bus4 5656.76 1502.11 5852.80

S3-4/32A Cable Bus4 Bus5 40887.99 1931.52 40933.59

S3-4/33 Cable Bus4 Bus7 5245.36 1392.87 5427.14

S3-4/33A Cable Bus7 Bus8 34345.91 1622.47 34384.21

S3-4/34 Cable Bus7 Bus9 5759.61 1529.42 5959.22

S3-4/34A Cable Bus9 Bus12 40887.99 1931.52 40933.59

S3-4/35 Cable Bus9 Bus13 5451.06 1447.49 5639.97

S3-4/35A Cable Bus13 Bus15 36799.19 1738.36 36840.23

S3-4/36 Cable Bus13 Bus46 5142.51 1365.56 5320.73

S3-4/36A Cable Bus46 Bus16 31074.87 1467.95 31109.53

S3-4/37 Cable Bus46 Bus32 5759.61 1529.42 5959.22

S3-4/37A Cable Bus32 Bus19 40887.99 1931.52 40933.59

S3-4/38 Cable Bus32 Bus18 5656.76 1502.11 5852.80

S3-4/38A Cable Bus18 Bus28 40887.99 1931.52 40933.59

S3-4/39 Cable Bus18 Bus21 5245.36 1392.87 5427.14

S3-4/39A Cable Bus21 Bus22 32710.39 1545.21 32746.87


ETAP
Project: SLD TRAFO CANDIREJO Page: 7
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 150.000 100.000 0.0 0.064 0.005 0 0 Bus2 0.064 0.005 0.2 99.7

Bus2 20.000 99.999 0.0 0 0 0 0 Bus43 0.064 0.005 1.9 99.7

Bus1 -0.064 -0.005 1.9 99.7

Bus3 0.231 96.928 -2.4 0 0 0 0 Bus4 0.062 0.002 160.2 99.9

Bus43 -0.062 -0.002 160.2 99.9

Bus4 0.231 93.276 -2.9 0 0 0 0 Bus3 -0.060 -0.001 160.2 100.0

Bus5 0.008 0.000 20.8 100.0

Bus7 0.052 0.001 139.4 100.0

Bus5 0.231 89.874 -3.0 0 0 0.007 0.000 Bus4 -0.007 0.000 20.8 100.0

Bus7 0.231 90.333 -3.4 0 0 0 0 Bus4 -0.050 -0.001 139.4 100.0

Bus8 0.005 0.000 12.6 100.0

Bus9 0.046 0.001 126.8 100.0

Bus8 0.231 88.600 -3.4 0 0 0.004 0.000 Bus7 -0.004 0.000 12.6 100.0

Bus9 0.231 87.398 -3.8 0 0 0 0 Bus7 -0.044 -0.001 126.8 100.0

Bus12 0.008 0.000 23.9 100.0

Bus13 0.036 0.001 102.9 100.0

Bus12 0.231 83.496 -3.9 0 0 0.008 0.000 Bus9 -0.008 0.000 23.9 100.0

Bus13 0.231 85.146 -4.2 0 0 0 0 Bus9 -0.035 0.000 102.9 100.0

Bus15 0.014 0.000 40.5 100.0

Bus46 0.021 0.000 62.4 100.0

Bus15 0.231 79.176 -4.4 0 0 0.013 0.000 Bus13 -0.013 0.000 40.5 100.0

Bus16 0.231 83.184 -4.4 0 0 0.002 0.000 Bus46 -0.002 0.000 5.4 100.0

Bus18 0.231 81.331 -4.9 0 0 0 0 Bus32 -0.017 0.000 53.4 100.0

Bus28 0.011 0.000 33.4 100.0

Bus21 0.007 0.000 20.1 100.0

Bus19 0.231 81.953 -4.7 0 0 0.001 0.000 Bus32 -0.001 0.000 3.6 100.0

Bus21 0.231 80.910 -5.0 0 0 0 0 Bus18 -0.007 0.000 20.1 100.0

Bus22 0.006 0.000 20.1 100.0

Bus22 0.231 78.282 -5.0 0 0 0.006 0.000 Bus21 -0.006 0.000 20.1 100.0

Bus28 0.231 75.875 -5.1 0 0 0.010 0.000 Bus18 -0.010 0.000 33.4 100.0

Bus32 0.231 82.541 -4.7 0 0 0 0 Bus46 -0.019 0.000 57.0 100.0

Bus19 0.001 0.000 3.6 100.0

Bus18 0.018 0.000 53.4 100.0

Bus43 20.000 99.998 0.0 0 0 0 0 Bus2 -0.064 -0.005 1.9 99.7

Bus3 0.064 0.005 1.9 99.7

Bus46 0.231 83.858 -4.4 0 0 0 0 Bus13 -0.021 0.000 62.4 100.0


ETAP
Project: SLD TRAFO CANDIREJO Page: 8
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

Bus16 0.002 0.000 5.4 100.0

Bus32 0.019 0.000 57.0 100.0


* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP
Project: SLD TRAFO CANDIREJO Page: 9
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 150.000 0 0 0 0 0 0 0 0 0.064 99.7 0.2

Bus2 20.000 0 0 0 0 0 0 0 0 0.064 99.7 1.9

Bus3 0.231 0 0 0 0 0 0 0 0 0.062 99.9 160.2

Bus4 0.231 0 0 0 0 0 0 0 0 0.060 100.0 160.2

Bus5 0.231 0 0 0.007 0 0 0 0 0 0.007 100.0 20.8

Bus7 0.231 0 0 0 0 0 0 0 0 0.050 100.0 139.4

Bus8 0.231 0 0 0.004 0 0 0 0 0 0.004 100.0 12.6

Bus9 0.231 0 0 0 0 0 0 0 0 0.044 100.0 126.8

Bus12 0.231 0 0 0.008 0 0 0 0 0 0.008 100.0 23.9

Bus13 0.231 0 0 0 0 0 0 0 0 0.035 100.0 102.9

Bus15 0.231 0 0 0.013 0 0 0 0 0 0.013 100.0 40.5

Bus16 0.231 0 0 0.002 0 0 0 0 0 0.002 100.0 5.4

Bus18 0.231 0 0 0 0 0 0 0 0 0.017 100.0 53.4

Bus19 0.231 0 0 0.001 0 0 0 0 0 0.001 100.0 3.6

Bus21 0.231 0 0 0 0 0 0 0 0 0.007 100.0 20.1

Bus22 0.231 0 0 0.006 0 0 0 0 0 0.006 100.0 20.1

Bus28 0.231 0 0 0.010 0 0 0 0 0 0.010 100.0 33.4

Bus32 0.231 0 0 0 0 0 0 0 0 0.019 100.0 57.0

Bus43 20.000 0 0 0 0 0 0 0 0 0.064 99.7 1.9

Bus46 0.231 0 0 0 0 0 0 0 0 0.021 100.0 62.4

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: SLD TRAFO CANDIREJO Page: 10
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

GJN19 Cable 114.65 1.85 1.61

* S3-4/32 Cable 97.43 160.19 164.41

* S3-4/33 Cable 97.43 139.40 143.07

* S3-4/34 Cable 97.43 126.79 130.13

* S3-4/35 Cable 97.43 102.94 105.66

S3-4/36 Cable 97.43 62.41 64.06

S3-4/37 Cable 97.43 56.98 58.48

S3-4/38 Cable 97.43 53.39 54.80

S3-4/39 Cable 97.43 20.09 20.62

* BnD S3-4/31 Transformer 0.050 0.064 128.2 0.062 124.2

TRAFO GJN19 Transformer 60.000 0.064 0.1 0.064 0.1

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: SLD TRAFO CANDIREJO Page: 11
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

TRAFO GJN19 0.064 0.005 -0.064 -0.005 0.0 0.0 100.0 100.0 0.00

GJN19 0.064 0.005 -0.064 -0.005 0.0 0.0 100.0 100.0 0.00

S3-4/32 0.062 0.002 -0.060 -0.001 2.3 0.6 96.9 93.3 3.65

BnD S3-4/31 -0.062 -0.002 0.064 0.005 1.8 2.7 96.9 100.0 3.07

S3-4/32A 0.008 0.000 -0.007 0.000 0.3 0.0 93.3 89.9 3.40

S3-4/33 0.052 0.001 -0.050 -0.001 1.6 0.4 93.3 90.3 2.94

S3-4/33A 0.005 0.000 -0.004 0.000 0.1 0.0 90.3 88.6 1.73

S3-4/34 0.046 0.001 -0.044 -0.001 1.5 0.4 90.3 87.4 2.93

S3-4/34A 0.008 0.000 -0.008 0.000 0.4 0.0 87.4 83.5 3.90

S3-4/35 0.036 0.001 -0.035 0.000 0.9 0.2 87.4 85.1 2.25

S3-4/35A 0.014 0.000 -0.013 0.000 1.0 0.0 85.1 79.2 5.97

S3-4/36 0.021 0.000 -0.021 0.000 0.3 0.1 85.1 83.9 1.29

S3-4/36A -0.002 0.000 0.002 0.000 0.0 0.0 83.2 83.9 0.67

S3-4/38 -0.017 0.000 0.018 0.000 0.3 0.1 81.3 82.5 1.21

S3-4/38A 0.011 0.000 -0.010 0.000 0.7 0.0 81.3 75.9 5.46

S3-4/39 0.007 0.000 -0.007 0.000 0.0 0.0 81.3 80.9 0.42

S3-4/37A -0.001 0.000 0.001 0.000 0.0 0.0 82.0 82.5 0.59

S3-4/39A 0.006 0.000 -0.006 0.000 0.2 0.0 80.9 78.3 2.63

S3-4/37 -0.019 0.000 0.019 0.000 0.3 0.1 82.5 83.9 1.32

11.8 4.8
ETAP
Project: SLD TRAFO CANDIREJO Page: 12
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

BnD S3-4/31 Transformer Overload 0,05 MVA 0,06 128.2 3-Phase

Bus12 Bus Under Voltage 0,23 kV 0,19 83.5 3-Phase

Bus13 Bus Under Voltage 0,23 kV 0,20 85.1 3-Phase

Bus15 Bus Under Voltage 0,23 kV 0,18 79.2 3-Phase

Bus16 Bus Under Voltage 0,23 kV 0,19 83.2 3-Phase

Bus18 Bus Under Voltage 0,23 kV 0,19 81.3 3-Phase

Bus19 Bus Under Voltage 0,23 kV 0,19 82.0 3-Phase

Bus21 Bus Under Voltage 0,23 kV 0,19 80.9 3-Phase

Bus22 Bus Under Voltage 0,23 kV 0,18 78.3 3-Phase

Bus28 Bus Under Voltage 0,23 kV 0,18 75.9 3-Phase

Bus32 Bus Under Voltage 0,23 kV 0,19 82.5 3-Phase

Bus4 Bus Under Voltage 0,23 kV 0,22 93.3 3-Phase

Bus46 Bus Under Voltage 0,23 kV 0,19 83.9 3-Phase

Bus5 Bus Under Voltage 0,23 kV 0,21 89.9 3-Phase

Bus7 Bus Under Voltage 0,23 kV 0,21 90.3 3-Phase


ETAP
Project: SLD TRAFO CANDIREJO Page: 13
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus8 Bus Under Voltage 0,23 kV 0,20 88.6 3-Phase

Bus9 Bus Under Voltage 0,23 kV 0,20 87.4 3-Phase

S3-4/32 Cable Overload 97,43 Amp 160,19 164.4 3-Phase

S3-4/33 Cable Overload 97,43 Amp 139,40 143.1 3-Phase

S3-4/34 Cable Overload 97,43 Amp 126,79 130.1 3-Phase

S3-4/35 Cable Overload 97,43 Amp 102,94 105.7 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus3 Bus Under Voltage 0,23 kV 0,22 96.9 3-Phase


ETAP
Project: SLD TRAFO CANDIREJO Page: 14
12.6.0H
Location: BERBAH, YOGYAKARTA Date: 06-06-2021
Contract: SN:
Engineer: SOFIA MAILAL IKHSANI Revision: Base
Study Case: LF
Filename: SLD CANDIREJO SOFIA Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 0.064 0.005 0.064 99.72 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 0.064 0.005 0.064 99.72 Lagging

Total Motor Load: 0.000 0.000 0.000 92.50 Lagging

Total Static Load: 0.052 0.000 0.052 100.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.012 0.005

System Mismatch: 0.000 0.000

Number of Iterations: 2