You are on page 1of 12

ETAP

Project: STEFANUS OGIRO TES Page: 1


12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 2 6 9

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 3 0 0 6 0 0 9

Method of Solution: Fast-Decoupled Method

Maximum No. of Iteration: 20

Precision of Solution: 0.0010000

System Frequency: 50.00 Hz

Unit System: English

Project Filename: IEEE9BUS

Output Filename: C:\ETAP 1260\Example-Other\IEEE9BUS\Untitled.lfr


ETAP
Project: STEFANUS OGIRO TES Page: 2
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP
Project: STEFANUS OGIRO TES Page: 3
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus 1 16.500 1 104.0 0.0

Bus 2 18.000 1 102.5 8.5

Bus 3 13.800 1 102.5 4.2

Bus 4 230.000 1 102.1 -2.2

Bus 5 230.000 1 99.3 -3.5 125.841 50.327

Bus 6 230.000 1 100.7 -3.3 87.705 29.235

Bus 7 230.000 1 102.3 2.9

Bus 8 230.000 1 101.3 0.4 96.879 33.894

Bus 9 230.000 1 102.8 1.5

Total Number of Buses: 9 0.000 0.000 310.425 113.456 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus 1 16.500 Swing 1 104.0 0.0

Bus 2 18.000 Voltage Control 1 102.5 8.5 163.000 100.000 -50.000

Bus 3 13.800 Voltage Control 1 102.5 4.2 85.000 100.000 -50.000

248.000 0.000
ETAP
Project: STEFANUS OGIRO TES Page: 4
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

Line/Cable Input Data

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Line1 1000.0 0.0 1 75 5.290000 37.471170 0.0002773

Line2 1000.0 0.0 1 75 8.993000 40.556670 0.0002489

Line3 1000.0 0.0 1 75 16.928000 70.974170 0.0004821

Line4 1000.0 0.0 1 75 20.631000 74.941670 0.0005639

Line5 1000.0 0.0 1 75 6.295100 44.436000 0.0003293

Line6 1000.0 0.0 1 75 4.496500 31.740000 0.0002348

Line / Cable resistances are listed at the specified temperatures.


ETAP
Project: STEFANUS OGIRO TES Page: 5
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 100.000 230.000 16.500 5.76 1000.00 0 0 0 0 0 5.7600 YNd 0.000

T2 3-Phase 100.000 18.000 230.000 6.25 1000.00 0 0 0 0 0 6.2500 Dyn 0.000

T3 3-Phase 100.000 13.800 230.000 5.86 1000.00 0 0 0 0 0 5.8600 Dyn 0.000


ETAP
Project: STEFANUS OGIRO TES Page: 6
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus 4 Bus 1 0.01 5.76 5.76

T2 2W XFMR Bus 2 Bus 7 0.01 6.25 6.25

T3 2W XFMR Bus 3 Bus 9 0.01 5.86 5.86

Line1 Line Bus 5 Bus 4 1.00 7.08 7.15 14.6665200

Line2 Line Bus 6 Bus 4 1.70 7.67 7.85 13.1676900

Line3 Line Bus 7 Bus 5 3.20 13.42 13.79 25.5022100

Line4 Line Bus 9 Bus 6 3.90 14.17 14.69 29.8311900

Line5 Line Bus 9 Bus 8 1.19 8.40 8.48 17.4173300

Line6 Line Bus 8 Bus 7 0.85 6.00 6.06 12.4182700


ETAP
Project: STEFANUS OGIRO TES Page: 7
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus 1 16.500 104.000 0.0 69.261 35.650 0 0 Bus 4 69.261 35.650 2620.9 88.9

* Bus 2 18.000 102.500 8.5 163.000 10.804 0 0 Bus 7 163.000 10.804 5111.9 99.8

* Bus 3 13.800 102.500 4.2 85.000 -4.110 0 0 Bus 9 85.000 -4.110 3473.5 -99.9

Bus 4 230.000 102.094 -2.2 0 0 0 0 Bus 5 39.720 27.013 118.1 82.7

Bus 6 29.538 5.405 73.8 98.4

Bus 1 -69.258 -32.419 188.0 90.6

Bus 5 230.000 99.330 -3.5 0 0 124.160 49.655 Bus 4 -39.453 -40.004 142.0 70.2

Bus 7 -84.706 -9.651 215.5 99.4

Bus 6 230.000 100.701 -3.3 0 0 88.938 29.646 Bus 4 -29.371 -18.192 86.1 85.0

Bus 9 -59.567 -11.455 151.2 98.2

Bus 7 230.000 102.315 2.9 0 0 0 0 Bus 5 87.036 -6.509 214.1 -99.7

Bus 8 75.948 1.438 186.4 100.0

Bus 2 -162.984 5.071 400.1 -100.0

Bus 8 230.000 101.314 0.4 0 0 99.441 34.790 Bus 9 -23.967 -23.821 83.7 70.9

Bus 7 -75.474 -10.970 189.0 99.0

Bus 9 230.000 102.845 1.5 0 0 0 0 Bus 6 60.937 -14.471 152.9 -97.3

Bus 8 24.059 6.322 60.7 96.7

Bus 3 -84.996 8.150 208.4 -99.5


* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP
Project: STEFANUS OGIRO TES Page: 8
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus 1 16.500 0 0 0 0 0 0 0 0 77.898 88.9 2620.9

Bus 2 18.000 0 0 0 0 0 0 0 0 163.358 99.8 5111.9

Bus 3 13.800 0 0 0 0 0 0 0 0 85.099 99.9 3473.5

Bus 4 230.000 0 0 0 0 0 0 0 0 76.470 90.6 188.0

Bus 5 230.000 0 0 124.160 49.655 0 0 0 0 133.721 92.8 337.9

Bus 6 230.000 0 0 88.938 29.646 0 0 0 0 93.749 94.9 233.7

Bus 7 230.000 0 0 0 0 0 0 0 0 163.114 99.9 400.2

Bus 8 230.000 0 0 99.441 34.790 0 0 0 0 105.351 94.4 261.0

Bus 9 230.000 0 0 0 0 0 0 0 0 86.219 98.6 210.4


ETAP
Project: STEFANUS OGIRO TES Page: 9
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

Branch Loading Summary Report

Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)

ID Type (Amp) Amp % (MVA) MVA % MVA %

T1 Transformer 100.000 77.898 77.9 76.470 76.5

* T2 Transformer 100.000 163.358 163.4 163.063 163.1

T3 Transformer 100.000 85.386 85.4 85.099 85.1

* Indicates a branch with operating load exceeding the branch capability.


ETAP
Project: STEFANUS OGIRO TES Page: 10
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

Branch Losses Summary Report

Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

T1 69.261 35.650 -69.258 -32.419 3.2 3231.5 104.0 102.1 1.91

T2 163.000 10.804 -162.984 5.071 15.9 15874.9 102.5 102.3 0.18

T3 85.000 -4.110 -84.996 8.150 4.0 4039.3 102.5 102.8 0.35

Line1 39.720 27.013 -39.453 -40.004 266.6 -12990.4 102.1 99.3 2.76

Line2 29.538 5.405 -29.371 -18.192 166.8 -12786.4 102.1 100.7 1.39

Line3 -84.706 -9.651 87.036 -6.509 2329.9 -16160.3 99.3 102.3 2.99

Line4 -59.567 -11.455 60.937 -14.471 1369.8 -25926.0 100.7 102.8 2.14

Line6 75.948 1.438 -75.474 -10.970 473.5 -9531.2 102.3 101.3 1.00

Line5 -23.967 -23.821 24.059 6.322 92.3 -17498.9 101.3 102.8 1.53

4722.1 -71747.5
ETAP
Project: STEFANUS OGIRO TES Page: 11
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

Alert Summary Report

% Alert Settings
Critical
Loading
Bus 0.0

Cable 0.0

Reactor 0.0

Line 100.0

Transformer 0.0

Panel 100.0

Protective Device 0.0

Generator 0.0

Inverter/Charger 100.0

Bus Voltage
OverVoltage 105.0

UnderVoltage 95.0

Generator Excitation
OverExcited (Q Max.) 0.0

UnderExcited (Q Min.)
ETAP
Project: STEFANUS OGIRO TES Page: 12
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal

TSC-TS-126. Test generator model.

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 69.261 35.650 77.898 88.91 Lagging

Source (Non-Swing Buses): 248.000 6.694 248.090 99.96 Lagging

Total Demand: 317.261 42.344 320.075 99.12 Lagging

Total Motor Load: 0.000 0.000 0.000 98.41 Leading

Total Static Load: 312.539 114.091 332.712 93.94 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 4.722 -71.747

System Mismatch: 0.000 0.000

Number of Iterations: 1

You might also like