Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 9 0.000 0.000 310.425 113.456 0.000 0.000 0.000 0.000
248.000 0.000
ETAP
Project: STEFANUS OGIRO TES Page: 4
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal
Line/Cable Length
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
Branch Connections
* Bus 1 16.500 104.000 0.0 69.261 35.650 0 0 Bus 4 69.261 35.650 2620.9 88.9
* Bus 2 18.000 102.500 8.5 163.000 10.804 0 0 Bus 7 163.000 10.804 5111.9 99.8
* Bus 3 13.800 102.500 4.2 85.000 -4.110 0 0 Bus 9 85.000 -4.110 3473.5 -99.9
Bus 5 230.000 99.330 -3.5 0 0 124.160 49.655 Bus 4 -39.453 -40.004 142.0 70.2
Bus 6 230.000 100.701 -3.3 0 0 88.938 29.646 Bus 4 -29.371 -18.192 86.1 85.0
Bus 8 230.000 101.314 0.4 0 0 99.441 34.790 Bus 9 -23.967 -23.821 83.7 70.9
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Line1 39.720 27.013 -39.453 -40.004 266.6 -12990.4 102.1 99.3 2.76
Line2 29.538 5.405 -29.371 -18.192 166.8 -12786.4 102.1 100.7 1.39
Line3 -84.706 -9.651 87.036 -6.509 2329.9 -16160.3 99.3 102.3 2.99
Line4 -59.567 -11.455 60.937 -14.471 1369.8 -25926.0 100.7 102.8 2.14
Line6 75.948 1.438 -75.474 -10.970 473.5 -9531.2 102.3 101.3 1.00
Line5 -23.967 -23.821 24.059 6.322 92.3 -17498.9 101.3 102.8 1.53
4722.1 -71747.5
ETAP
Project: STEFANUS OGIRO TES Page: 11
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal
% Alert Settings
Critical
Loading
Bus 0.0
Cable 0.0
Reactor 0.0
Line 100.0
Transformer 0.0
Panel 100.0
Generator 0.0
Inverter/Charger 100.0
Bus Voltage
OverVoltage 105.0
UnderVoltage 95.0
Generator Excitation
OverExcited (Q Max.) 0.0
UnderExcited (Q Min.)
ETAP
Project: STEFANUS OGIRO TES Page: 12
12.6.0H
Location: ITN MALANG Date: 29-04-2018
Contract: 1612032 SN:
Engineer: OTI Revision: Base
Study Case: LF
Filename: IEEE9BUS Config.: Normal
MW Mvar MVA % PF
Number of Iterations: 1