Project: Short Circuit 1

ETAP Page: 1

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

Electrical Transient Analyzer


Program

Short-Circuit Analysis

ANSI Standard
3-Phase Fault Currents

Swing V-Control Load Total


Number of Buses: 1 1 3 5

XFMR2 XFMR3 Reactor Line/Cab Impedan Tie PD Total


le ce
3 0 0 1 0 0 4
Number of Branches:

Synchro Power Synchro Inductio Lumped


nous nous n
Generator Grid Motor Machines Load
Total
Number of 3 0 0 0 0 3
Machines:
System Frequency: 50.00 Hz

Unit English

ShortCircuit1
System:
C:\ETAP 1260\ShortCircuit1\Untitled.SA1

Project

Filename:

Output

Filename:
Project: Short Circuit 1
ETAP Page: 2

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

Adjustments

Apply Indivi
Toler dual Percent
Adjust
Transformer ance /
ments
Glob
Impedance: Yes
al
Yes
Individual
Reactor
Individual

Impedance:
Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Indivi
Temperature dual Degree C
Adjust
/
Correction Transmission ments
Glob
Line Resistance:
Yes
al
Yes
Individual

Cable Resistance: Individual


Project: Short Circuit 1
ETAP Page: 3

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus1 SWNG 13.800 13.800 1 100.00 0.00

Bus2 Gen. 13.800 13.800 1 100.00 0.00

Bus3 Load 20.000 20.000 1 100.00 0.00

Bus4 Load 20.000 20.000 1 100.00 0.00

Bus5 Load 13.800 13.800 1 100.00 0.00

5 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project: Short Circuit 1
ETAP Page: 4

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

Line/Cable Input Data

Ohms or Siemens/1000 ft per Conductor (Cable) or per Phase (Line)

Line/C Len
able
gth
ID Library Size Adj. (ft) % #/Ph T R X Y
Tol. ase (C)
Line1 26 131233.6 0 1 75 0.06096 0.09144 0.0000000

Line / Cable resistances are listed at the specified temperatures.


Project: Short Circuit 1
ETAP Page: 5

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted


ID MV Prim. Sec. % Z X/R + - % Pri Sec. %Z
A kV kV 5% 5% Tol. m.
T1 40.000 13.800 20.000 0.01 45.00 0 0 0 0 0 0.0090

T2 40.000 13.800 20.000 0.01 45.00 0 0 0 0 0 0.0090

T3 40.000 13.800 20.000 0.01 45.00 0 0 0 0 0 0.0090


Project: Short Circuit 1
ETAP Page: 6

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

Branch Connections

CKT/Branch Connected % Impedance, Pos. Seq., 100 MVAb

Bus ID
ID Type From Bus To Bus R X Z Y
T1 2W XFMR Bus1 Bus3 0.00 0.02 0.02
T2 2W XFMR Bus2 Bus3 0.00 0.02 0.02

T3 2W XFMR Bus5 Bus4 0.00 0.02 0.02

Line1 Line Bus4 Bus3 200.00 300.00 360.56


Project: Short Circuit 1
ETAP Page: 7

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

Synchronous Generator Input


Data

% Impedance in
Synchronous Connected Rating X/R Machine Base
Generator Bus Ratio Xd"

ID Ty ID MV kV RP X"/ X'/ R Adj. Tol Xd'


pe A M R R .
Gen1 Turbo Bus1 23.529 13.800 1500 1.00 1.00 0.200 0.20 0.0 20.00

Gen2 Turbo Bus2 11.765 13.800 1500 1.00 1.00 0.250 0.25 0.0 25.00

Gen3 Turbo Bus5 17.647 13.800 1500 1.00 1.00 0.250 0.25 0.0 25.00

Total Connected Synchronous Generators ( = 3 ): 52.941 MVA


Project: Short Circuit 1
ETAP Page: 8

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

SHORT-CIRCUIT REPORT

3-phase fault at bus: Bus3

Prefault voltage = 20.000 = 100.00 % of nominal bus kV (


20.000 kV)
= 100.00 % of base ( 20.000 kV)
Contributi 1/2 Cycle 1.5 to 4
on Cycle
From Bus To %V kA kA kA % V kA k Im kA
Bus Imag. Symm A ag. Symm
. .
I ID From Bus Real Magni From Re Imagin / Magni
D Imaginary tude Bus al ary Re tude
/Real al
Bus3 Total 0.00 233.028 -238.220 1.0 333.243 0.00 233.028 -238.220 1.0 333.243

Bus4 Bus3 99.45 0.442 -0.662 1.5 0.796 99.45 0.442 -0.662 1.5 0.796

Bus1 Bus3 1.85 165.377 -169.654 1.0 236.922 1.85 165.377 -169.654 1.0 236.922

Bus2 Bus3 0.74 67.209 -67.904 1.0 95.540 0.74 67.209 -67.904 1.0 95.540

NACD Ratio = 0.00

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project: Short Circuit 1
ETAP Page: 9

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

3-phase fault at bus: Bus5

Prefault voltage = 13.800 = 100.00 % of nominal bus kV (


13.800 kV)
= 100.00 % of base ( 13.800 kV)
Contributi 1/2 Cycle 1.5 to 4
on Cycle
From Bus To %V kA kA kA % V kA k Im kA
Bus Imag. Symm A ag. Symm
. .
I ID From Bus Real Magni From Re Imagin / Magni
D Imaginary tude Bus al ary Re tude
/Real al
Bus5 Total 0.00 148.302 -148.623 1.0 209.958 0.00 148.302 -148.623 1.0 209.958

Bus4 Bus5 0.01 0.642 -0.963 1.5 1.158 0.01 0.642 -0.963 1.5 1.158

Gen3 Bus5 100.00 147.660 -147.660 1.0 208.823 100.00 147.660 -147.660 1.0 208.823

NACD Ratio = 0.01

# Indicates a fault current contribution from a three-winding transformer


* Indicates a fault current through a tie circuit breaker
If faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these PDs will not be reported.
Project: Short Circuit 1
ETAP Page: 10

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

Momentary Duty Summary


Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus
Device Capability
Device Momentary
Duty
Sym X/ Asy Asym Sym Asy Asy
ID kV ID m. R M.F. mm. m. kA m. mm. mm.
Type kA Ra kA Peak kA kA kA
rms tio rms rms rms Peak
Bus3 20.000 Bus3 Bus 333.243 1.0 1.002 333.956 493.090
Bus5 13.800 Bus5 Bus 209.958 1.0 1.002 210.355 309.851

Method: IEEE - X/R is calculated from separate R & X networks.


Protective device duty is calculated based on total fault current.
The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R.

* Indicates a device with momentary duty exceeding the device capability


Project: Short Circuit 1
ETAP Page: 11

Location: LAB DSTL


12.6.
0H Date: 10-08-2018

UNSRI Contract: SN:


03041281520103
Engineer: Evander Johan Revision:
Study Case: SC Filename: ShortCircuit1
Base Config.:

Normal

Interrupting Duty Summary


Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Device Capability

Duty
C Sym X/ Adj. Tes Ra Adju
ID kV I Type P m. R M.F Sym. k t te ste
D T kA Ra . kA V PF d d
(C rms tio rms In Int.
y) t.
Bus3 20.000 333.243 1.0
Bus5 13.800 209.958 1.0

Method: IEEE - X/R is calculated from separate R & X networks.


HV CB interrupting capability is adjusted based on bus nominal voltage
Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is calculated based on asymmetrical current.
Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.
* Indicates a device with interrupting duty exceeding the device capability
** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator.
Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.
+ The prefault voltage exceeds the rated maximum kV limit of the circuit breaker - The rated interrupting kA must be derated.