N
DATA PERCOBAAN

a. Power grid 150 kV


b. Bus bar 150; initial : 100% , angle 0;
c. Tranformator Step-down 150\20 KV ; Kapasitas 50 MVA
d. Busbar 20 KV ; initial 100% V , angle 0;
e. Static Load 40 MVA ; power faktor atau faktor daya(pf) 90%
ETAP Page: 1
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 1 2

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total 1


Number of Branches: 0 0 0 0 0 1

Method of Solution: Adaptive Newton-Raphson Method


Maximum No. of Iteration:
99
Precision of Solution:
0.0001000

System Frequency:
60.00 Hz
Unit System:
English
Project Filename:
RANDI SETIAWAN
Output Filename:
C:\ETAP 1260\RANDI SETIAWAN\Untitled.lfr
ETAP Page: 2
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance:
Yes
Individual
Reactor Impedance:
Yes
Individual
Overload Heater Resistance:
No
Transmission Line Length:
No
Cable Length:
No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP Page: 3
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 150.000 1 100.0 0.0

Bus2 20.000 1 100.0 0.0 36.000 17.436

Total Number of Buses: 2 0.000 0.000 36.000 17.436 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % PF
% Mag. Angle MW Mvar Max Min

Bus1 150.000 Swing


1 100.0
0.0

0.000 0.000
ETAP Page: 4
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle


Phas
e

Trafo 1 3-Phase 50.000 150.000 20.000 7.7500 Dyn 0.000


7.75 29.50 0 0 0 0 0
ETAP Page: 5
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base

ID Type From Bus To Bus R X Z Y


Trafo 1 2W XFMR Bus1 Bus2 0.53 15.49 15.50
ETAP Page: 6
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

% Mag.
ID kV Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

0 0 Bus2 33.989 18.758 149.4 87.6


* Bus1 150.000 100.000 0.0 33.989 18.758

Bus2 20.000 97.053 -3.1 0 0 33.910 16.423 Bus1 -33.910 -16.423 1120.7 90.0

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to

it)# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP Page: 7
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 150.000 0 0 0 0 0 0 0 0 38.821 87.6 149.4

Bus2 20.000 0 0 33.910 16.423 0 0 0 0 37.677 90.0 1120.7

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP Page: 8
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Branch Loading Summary Report

Transformer

CKT / Branch Cable & Reactor

Loading Capability Loading (input) Loading (output)


Ampacity

ID Type (Amp) Amp % (MVA) MVA % MVA %

Trafo 1 Transformer 50.000 38.821 77.6 37.677 75.4

* Indicates a branch with operating load exceeding the branch capability.


ETAP Page: 9
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Branch Losses Summary Report

Vd

CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Trafo 1 33.989 18.758 -33.910 -16.423 79.1 2334.7 100.0 97.1 2.95

79.1 2334.7
ETAP Page: 10
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Alert Summary Report

% Alert Settings

Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus2 Bus Under Voltage 20.00 kV 19.41 97.1 3-Phase


ETAP Page: 11
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 33.989 18.758 38.821 87.55 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 33.989 18.758 38.821 87.55 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 33.910 16.423 37.677 90.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.079 2.335


a. Power Grid 150 kV
b. Busbar 150 Kv; initial V 100 %; angel 0
c. Transformator Step Down 150/20kV ; kapasitas 50
MVA
d. Busbar 20 Kv ; initial V 100%; angel 0
e. Static load 10 MVA ; pf 90%
Data percobaan 2 :

Singel Line Diagram dan Hasil running percobaan 2

ETAP
Project: LOAD FLOW ANALISIS

12.6.0H
Location: VIKTOR UNPAM Date: 12-03-2022

Contract: 001 SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 1 2

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total 1


Number of Branches: 0 0 0 0 0 1
Method of Solution: Adaptive Newton-Raphson Method
Maximum No. of Iteration:
99
Precision of Solution:
0.0001000

System Frequency:
60.00 Hz
Unit System:
English
Project Filename:
RANDI SETIAWAN
Output Filename:
C:\ETAP 1260\RANDI SETIAWAN\Untitled.lfr
ETAP Page: 2
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance:
Yes
Individual
Reactor Impedance:
Yes
Individual
Overload Heater Resistance:
No
Transmission Line Length:
No
Cable Length:
No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP Page: 3
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 150.000 1 100.0 0.0

Bus2 20.000 1 100.0 0.0 9.000 4.359

Total Number of Buses: 2 0.000 0.000 9.000 4.359 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % PF
% Mag. Angle MW Mvar Max Min

Bus1 150.000 Swing


1 100.0
0.0

0.000 0.000
ETAP Page: 4
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle


Phas
e

Trafo 2 3-Phase 50.000 150.000 20.000 7.7500 Dyn 0.000


7.75 29.50 0 0 0 0 0
ETAP Page: 5
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base

ID Type From Bus To Bus R X Z Y


Trafo 2 2W XFMR Bus1 Bus2 0.53 15.49 15.50
ETAP Page: 6
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

% Mag.
ID kV Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

0 0 Bus2 8.875 4.448 38.2 89.4


* Bus1 150.000 100.000 0.0 8.875 4.448

Bus2 20.000 99.273 -0.8 0 0 8.870 4.296 Bus1 -8.870 -4.296 286.6 90.0

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to

it)# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP Page: 7
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 150.000 0 0 0 0 0 0 0 0 9.927 89.4 38.2

Bus2 20.000 0 0 8.870 4.296 0 0 0 0 9.855 90.0 286.6

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP Page: 8
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Branch Loading Summary Report

Transformer

CKT / Branch Cable & Reactor

Loading Capability Loading (input) Loading (output)


Ampacity

ID Type (Amp) Amp % (MVA) MVA % MVA %

Trafo 2 Transformer 50.000 9.927 19.9 9.855 19.7

* Indicates a branch with operating load exceeding the branch capability.


ETAP Page: 9
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Branch Losses Summary Report

Vd

CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Trafo 2 8.875 4.448 -8.870 -4.296 5.2 152.7 100.0 99.3 0.73

5.2 152.7
ETAP Page: 10
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Alert Summary Report

% Alert Settings

Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0


ETAP Page: 11
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 8.875 4.448 9.927 89.40 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 8.875 4.448 9.927 89.40 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 8.870 4.296 9.855 90.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.005 0.153

System Mismatch: 0.000 0.000


Data percobaan 3 :
a. Power Grid 150 kV
b. Busbar 150 Kv; initial
V 100 %; angel 0
c. Transformator Step
Down 150/20kV ;
kapasitas 20 MVA
d. Busbar 20 Kv ; initial V
100%; angel 0
e. Static load 10 MVA ;
pf 90%

Singel Line Diagram dan Hasil


running percobaan 3
ETAP Page: 1
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 0 1 2

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total 1


Number of Branches: 0 0 0 0 0 1

Method of Solution: Adaptive Newton-Raphson Method


Maximum No. of Iteration:
99
Precision of Solution:
0.0001000

System Frequency:
60.00 Hz
Unit System:
English
Project Filename:
RANDI SETIAWAN
Output Filename:
C:\ETAP 1260\RANDI SETIAWAN\Untitled.lfr
ETAP Page: 2
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance:
Yes
Individual
Reactor Impedance:
Yes
Individual
Overload Heater Resistance:
No
Transmission Line Length:
No
Cable Length:
No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


ETAP Page: 3
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Bus Input Data

Load

Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 150.000 1 100.0 0.0

Bus2 20.000 1 100.0 0.0 9.000 4.359

Total Number of Buses: 2 0.000 0.000 9.000 4.359 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits

ID kV Type Sub-sys % PF
% Mag. Angle MW Mvar Max Min

Bus1 150.000 Swing


1 100.0
0.0

0.000 0.000
ETAP Page: 4
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle


Phas
e

Trafo 3 3-Phase 20.000 150.000 20.000 7.7500 Dyn 0.000


7.75 29.50 0 0 0 0 0
ETAP Page: 5
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base

ID Type From Bus To Bus R X Z Y


Trafo 3 2W XFMR Bus1 Bus2 1.31 38.73 38.75
ETAP Page: 6
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR

% Mag.
ID kV Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

0 0 Bus2 8.686 4.574 37.8 88.5


* Bus1 150.000 100.000 0.0 8.686 4.574

Bus2 20.000 98.170 -1.9 0 0 8.674 4.201 Bus1 -8.674 -4.201 283.4 90.0

* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to

it)# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP Page: 7
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 150.000 0 0 0 0 0 0 0 0 9.817 88.5 37.8

Bus2 20.000 0 0 8.674 4.201 0 0 0 0 9.637 90.0 283.4

* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).

# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP Page: 8
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Branch Loading Summary Report

Transformer

CKT / Branch Cable & Reactor

Loading Capability Loading (input) Loading (output)


Ampacity

ID Type (Amp) Amp % (MVA) MVA % MVA %

Trafo 3 Transformer 50.000 9.817 19.6 9.637 19.3

* Indicates a branch with operating load exceeding the branch capability.


ETAP Page: 9
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Branch Losses Summary Report

Vd

CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag

Trafo 3 8.686 4.574 -8.674 -4.201 12.7 373.2 100.0 98.2 1.83

12.7 373.2
ETAP Page: 10
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal

Alert Summary Report

% Alert Settings

Critical Marginal
Loading
Bus 100.0 95.0

Cable 100.0 95.0

Reactor 100.0 95.0

Line 100.0 95.0

Transformer 100.0 95.0

Panel 100.0 95.0

Protective Device 100.0 95.0

Generator 100.0 95.0

Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0

UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0

UnderExcited (Q Min.) 100.0


ETAP Page: 11
Project: LOAD FLOW ANALISIS

Location: VIKTOR UNPAM 12.6.0H


Date: 12-03-2022
Contract: 001
SN:

Engineer: RANDI SETIAWAN Revision: Base


Study Case: LF
Filename: RANDI SETIAWAN Config.: Normal
SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 8.686 4.574 9.817 88.48 Lagging

Source (Non-Swing Buses): 0.000 0.000 0.000

Total Demand: 8.686 4.574 9.817 88.48 Lagging

Total Motor Load: 0.000 0.000 0.000

Total Static Load: 8.674 4.201 9.637 90.00 Lagging

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.013 0.373

System Mismatch: 0.000 0.000

Number of Iterations: 1