Professional Documents
Culture Documents
Adjustments
Apply Individual
Tolerance Adjustments /Global Percent
Apply Individual
Temperature Correction Adjustments /Global Degree C
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Bottom Out bus A 0.400 1 100.0 0.0 0.070 0.037 0.016 0.000
Bottom Out BusB 0.400 1 100.0 0.0 0.072 0.037 0.020 0.000
Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic
Total Number of Buses: 60 3.672 1.598 3.027 0.525 0.000 0.000 0.000 0.000
0.000 0.000
ETAP
Project: GERD HYDRO POWER PROJECT Page: 6
12.6.0H
Location: Date: 10-12-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GRANDRENAISSANCE1 Config.: Normal
Line/Cable Length
Line/Cable Length
ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle
MAIN TRANSFORMER 08 3-Phase 417.000 500.000 18.000 12.50 45.00 0 0 0 0 0 12.5000 YNd 0.000
MAIN TRANSFORMER10 3-Phase 417.000 500.000 18.000 12.50 45.00 0 0 0 0 0 12.5000 YNd 0.000
MDBR1-TR1 3-Phase 3.150 15.000 0.400 6.25 6.00 0 0 0 0 0 6.2500 Dyn 0.000
MDBR1-TR2 3-Phase 3.150 15.000 0.400 6.25 6.00 0 0 0 0 0 6.2500 Dyn 0.000
MDBR2-TR1 3-Phase 4.000 15.000 0.400 7.15 8.50 0 0 0 0 0 7.1500 Dyn 0.000
MDBR2-TR2 3-Phase 4.000 15.000 0.400 7.15 8.50 0 0 0 0 0 7.1500 Dyn 0.000
OFF-TR1 3-Phase 0.600 15.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
OFF-TR2 3-Phase 0.535 15.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
T25-8-1 3-Phase 0.040 0.400 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
T25-8-1-1 3-Phase 0.040 0.400 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
T40 3-Phase 1.000 15.000 0.400 5.00 3.50 0 0 0 0 0 5.0000 Dyn 0.000
T41 3-Phase 1.000 15.000 0.400 5.00 3.50 0 0 0 0 0 5.0000 Dyn 0.000
T42 3-Phase 0.400 15.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
T43 3-Phase 0.400 15.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
T44 3-Phase 0.225 15.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
T45 3-Phase 0.225 15.000 0.400 4.00 1.50 0 0 0 0 0 4.0000 Dyn 0.000
TR-T1 3-Phase 9.000 18.000 15.000 7.15 8.50 0 0 0 0 0 7.1500 Dyn 0.000
TR-T2 3-Phase 9.000 18.000 15.000 7.15 8.50 0 0 0 0 0 7.1500 Dyn 0.000
ETAP
Project: GERD HYDRO POWER PROJECT Page: 9
12.6.0H
Location: Date: 10-12-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GRANDRENAISSANCE1 Config.: Normal
Branch Connections
Cable593 Cable Bus bar A Swy Bus bar A 0.07 0.04 0.08 0.0013703
ETAP
Project: GERD HYDRO POWER PROJECT Page: 10
12.6.0H
Location: Date: 10-12-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GRANDRENAISSANCE1 Config.: Normal
Cable601 Cable Bus724 Swy Bus bar B 10.51 5.47 11.85 0.2055375
Cable605 Cable Bus bar A RIGHT INTAKE BUS BAR A 0.07 0.04 0.08 0.0013703
Cable609 Cable Swy Bus bar A Bus822 0.10 0.03 0.11 0.0008019
Cable610 Cable Swy Bus bar B Bus736 0.10 0.03 0.11 0.0008019
Cable618 Cable RIGHT INTAKE BUS BAR B Bus817 0.14 0.03 0.14 0.0013230
Cable622 Cable RIGHT INTAKE BUS BAR A Bus814 0.14 0.04 0.15 0.0010692
Cable663 Cable RIGHT INTAKE BUS BAR A Bus800 0.06 0.02 0.06
Cable665 Cable RIGHT INTAKE BUS BAR B Bus815 0.14 0.03 0.14
Cable675 Cable Bus bar B RIGHT INTAKE BUS BAR B 4.15 5.02 6.52
Bottom Out bus A 0.400 95.976 -3.6 0 0 0.084 0.037 Bus801 -0.084 -0.037 138.6 91.5
Bottom Out BusB 0.400 95.836 -3.6 0 0 0.090 0.037 Bus819 -0.090 -0.037 146.6 92.4
Bus bar A 15.000 97.556 -3.0 0 0 0 0 Bus35 -6.536 -2.085 270.7 95.3
Bus bar B 15.000 97.556 -3.0 0 0 0 0 Bus636-1 0.334 0.129 14.1 93.3
* Bus22 18.000 100.000 -0.1 0.000 2.626 0 0 Bus704 -6.582 0.153 211.2 -100.0
Bus35 15.000 97.564 -3.0 0 0 0 0 Bus bar A 6.536 2.083 270.6 95.3
Bus589 0.400 95.605 -4.8 0 0 0 0 MDBR1 BUS A 1.559 0.669 2561.4 91.9
Bus608-1-1 0.400 94.963 -5.0 0 0 1.221 0.539 MDBR1 BUS A -1.236 -0.540 2050.5 91.7
Bus608-3-1 0.400 94.860 -5.2 0 0 1.220 0.539 Bus7-8-1-1 0.030 0.001 45.3 100.0
ETAP
Project: GERD HYDRO POWER PROJECT Page: 12
12.6.0H
Location: Date: 10-12-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GRANDRENAISSANCE1 Config.: Normal
Bus620-8-1 0.400 94.053 -5.8 0 0 0.015 0.000 Bus-3-1 -0.015 0.000 23.0 100.0
Bus620-8-1-1 0.400 93.042 -6.7 0 0 0.029 0.000 Bus-3-1-1 -0.029 0.000 45.3 100.0
Bus631-1 15.000 97.552 -3.0 0 0 0 0 Bus bar A -1.569 -0.731 68.3 90.6
Bus636-1 15.000 97.556 -3.0 0 0 0 0 Bus bar B -0.334 -0.130 14.1 93.2
Bus637-1 0.400 97.186 -3.4 0 0 0 0 MDBR1 BUS B 0.334 0.127 530.0 93.5
Bus643-1 0.400 96.539 -4.0 0 0 0 0 MDBR2 BUS A 0.962 0.432 1576.2 91.2
Bus646-1 15.000 97.554 -3.0 0 0 0 0 Bus bar B -1.844 -0.879 80.6 90.3
Bus647-1 0.400 95.612 -4.9 0 0 0 0 MDBR2 BUS B 1.835 0.802 3023.0 91.6
Bus687 0.400 96.307 -4.0 0 0 0.232 0.000 Bus709 -0.232 0.000 347.5 100.0
Bus696 0.400 96.558 -3.9 0 0 0.233 0.000 Bus692 -0.233 0.000 348.4 100.0
* Bus704 500.000 100.000 0.0 6.582 -0.161 0 0 Bus253 0.000 -0.021 0.0 0.0
Bus724 15.000 97.556 -3.0 0 0 0 0 Swy Bus bar B 0.424 -0.186 18.3 -91.5
Bus736 15.000 97.515 -3.0 0 0 0 0 Swy Bus bar B -0.424 -0.010 16.7 100.0
Bus742 0.400 96.611 -4.4 0 0 0.420 0.000 Bus821 -0.420 0.000 627.5 100.0
Bus743 0.400 96.571 -4.4 0 0 0.420 0.000 Bus739 -0.420 0.000 627.2 100.0
Bus749 0.400 96.435 -3.9 0 0 0.163 0.000 Bus818 -0.161 0.000 241.7 100.0
Bus754 0.400 96.435 -3.9 0 0 0.163 0.000 Bus752 -0.164 0.000 245.5 100.0
Bus800 15.000 97.556 -3.0 0 0 0 0 RIGHT INTAKE BUS BAR A -0.085 -0.039 3.7 91.1
Bus801 0.400 96.112 -3.6 0 0 0 0 Bottom Out bus A 0.084 0.037 138.6 91.5
Bus813-1 15.000 97.555 -3.0 0 0 0 0 Bus bar A -0.964 -0.453 42.0 90.5
Bus814 15.000 97.556 -3.0 0 0 0 0 RIGHT INTAKE BUS BAR A -0.166 -0.002 6.5 100.0
Bus815 15.000 97.543 -3.0 0 0 0 0 RIGHT INTAKE BUS BAR B -0.091 -0.039 3.9 92.0
Bus817 15.000 97.543 -3.0 0 0 0 0 RIGHT INTAKE BUS BAR B -0.163 -0.003 6.4 100.0
Bus819 0.400 96.038 -3.6 0 0 0 0 Bottom Out BusB 0.090 0.037 146.6 92.4
Bus822 15.000 97.555 -3.0 0 0 0 0 Swy Bus bar A -0.424 -0.010 16.7 100.0
MDBR1 BUS A 0.400 95.391 -4.8 0 0 0.316 0.120 Bus608-1-1 1.240 0.546 2050.5 91.5
MDBR1 BUS B 0.400 96.704 -3.6 0 0 0.332 0.125 Bus637-1 -0.332 -0.125 530.0 93.5
MDBR2 BUS A 0.400 96.470 -4.0 0 0 0.961 0.431 Bus643-1 -0.961 -0.431 1576.2 91.3
MDBR2 BUS B 0.400 95.532 -5.0 0 0 0.577 0.252 Bus608-3-1 1.257 0.548 2071.3 91.7
RIGHT INTAKE BUS BAR 15.000 97.556 -3.0 0 0 0 0 Bus bar A -0.251 -0.040 10.0 98.8
A
Bus814 0.166 0.001 6.5 100.0
RIGHT INTAKE BUS BAR 15.000 97.543 -3.0 0 0 0 0 Bus817 0.163 0.001 6.4 100.0
B
ETAP
Project: GERD HYDRO POWER PROJECT Page: 14
12.6.0H
Location: Date: 10-12-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GRANDRENAISSANCE1 Config.: Normal
Swy Bus bar A 15.000 97.556 -3.0 0 0 0 0 Bus bar A -0.424 -0.009 16.7 100.0
Swy Bus bar B 15.000 97.515 -3.0 0 0 0 0 Bus724 -0.424 -0.009 16.7 100.0
* Indicates a voltage regulated bus (voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
ETAP
Project: GERD HYDRO POWER PROJECT Page: 15
12.6.0H
Location: Date: 10-12-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GRANDRENAISSANCE1 Config.: Normal
Bottom Out bus A 0.400 0.070 0.037 0.015 0 0 0 0 0 0.092 91.5 138.6
Bottom Out BusB 0.400 0.072 0.037 0.018 0 0 0 0 0 0.097 92.4 146.6
MDBR1 BUS A 0.400 0.206 0.075 0.110 0.046 0 0 0 0 1.693 91.9 2561.4
MDBR1 BUS B 0.400 0.165 0.076 0.167 0.050 0 0 0 0 0.355 93.5 530.0
MDBR2 BUS A 0.400 0.552 0.232 0.410 0.199 0 0 0 0 1.053 91.3 1576.2
MDBR2 BUS B 0.400 0.302 0.135 0.275 0.116 0 0 0 0 2.001 91.7 3023.0
* Indicates operating load of a bus exceeds the bus critical limit ( 100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit ( 95.0% of the Continuous Ampere rating).
ETAP
Project: GERD HYDRO POWER PROJECT Page: 17
12.6.0H
Location: Date: 10-12-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GRANDRENAISSANCE1 Config.: Normal
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
Transformer
CKT / Branch Cable & Reactor
Ampacity Loading Capability Loading (input) Loading (output)
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
Cable669 -0.084 -0.037 0.084 0.037 0.1 0.0 96.0 96.1 0.14
Cable670 -0.090 -0.037 0.090 0.037 0.2 0.0 95.8 96.0 0.20
Cable12 -6.536 -2.085 6.536 2.083 0.5 -1.8 97.6 97.6 0.01
Cable532-1 1.569 0.728 -1.569 -0.731 0.1 -3.2 97.6 97.6 0.00
Cable540-1 0.964 0.448 -0.964 -0.453 0.0 -5.3 97.6 97.6 0.00
Cable593 0.424 0.008 -0.424 -0.009 0.0 -1.3 97.6 97.6 0.00
Cable605 0.251 0.039 -0.251 -0.040 0.0 -1.3 97.6 97.6 0.00
Cable536-1 0.334 0.129 -0.334 -0.130 0.0 -1.0 97.6 97.6 0.00
Cable544-1 1.844 0.874 -1.844 -0.879 0.0 -5.3 97.6 97.6 0.00
Cable675 0.255 0.040 -0.255 -0.040 0.0 0.0 97.6 97.5 0.01
Cable-8-1 0.015 0.000 -0.015 0.000 0.0 0.0 94.1 94.1 0.00
T25-8-1 -0.015 0.000 0.015 0.000 0.1 0.2 94.1 94.9 0.89
Cable-8-1-1 0.029 0.000 -0.029 0.000 0.0 0.0 93.1 93.0 0.01
T25-8-1-1 -0.029 0.000 0.030 0.001 0.5 0.8 93.1 94.8 1.78
Cable-8-1- -0.015 0.000 0.015 0.000 0.0 0.0 94.9 95.0 0.02
Cable-8-1--1 -0.030 -0.001 0.030 0.001 0.0 0.0 94.8 94.9 0.03
MAIN TRANSFORMER10 -6.582 0.153 6.582 -0.140 0.3 13.0 100.0 100.0 0.00
TR-T1 6.582 2.474 -6.536 -2.083 45.9 390.1 100.0 97.6 2.44
MAIN TRANSFORMER 08 0.000 0.021 0.000 -0.021 0.0 0.0 100.0 100.0 0.00
TR-T2 0.000 -0.021 0.000 0.021 0.0 0.0 100.0 100.0 0.02
Cable177 0.000 -0.021 0.000 0.000 0.0 -21.2 100.0 100.0 0.00
Cable533-1 1.559 0.669 -1.556 -0.666 2.8 3.2 95.6 95.4 0.21
MDBR1-TR1 -1.559 -0.669 1.569 0.731 10.3 61.6 95.6 97.6 1.95
Cable 3 -1.236 -0.540 1.240 0.546 3.8 6.4 95.0 95.4 0.43
Cable511-3-1 -1.250 -0.540 1.257 0.548 7.0 8.0 94.9 95.5 0.67
MDBR1-TR2 0.334 0.130 -0.334 -0.127 0.4 2.6 97.6 97.2 0.37
Cable537-1 0.334 0.127 -0.332 -0.125 1.3 1.5 97.2 96.7 0.48
Cable541-1 0.962 0.432 -0.961 -0.431 0.5 0.8 96.5 96.5 0.07
MDBR2-TR1 -0.962 -0.432 0.964 0.453 2.5 21.2 96.5 97.6 1.02
MDBR2-TR2 1.844 0.879 -1.835 -0.802 9.2 77.9 97.6 95.6 1.94
Cable545-1 1.835 0.802 -1.834 -0.800 1.1 1.6 95.6 95.5 0.08
Cable588 -0.232 0.000 0.232 0.000 0.6 0.3 96.3 96.5 0.24
Cable581 0.235 0.003 -0.235 -0.003 0.0 -0.3 97.6 97.6 0.00
OFF-TR1 0.235 0.003 -0.233 0.000 2.2 3.2 97.6 96.7 0.90
Cable582 0.233 0.000 -0.233 0.000 0.2 0.1 96.7 96.6 0.09
ETAP
Project: GERD HYDRO POWER PROJECT Page: 20
12.6.0H
Location: Date: 10-12-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GRANDRENAISSANCE1 Config.: Normal
Vd
CKT / Branch From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
ID MW Mvar MW Mvar kW kvar From To in Vmag
OFF-TR2 0.235 0.004 -0.232 0.000 2.4 3.6 97.6 96.5 1.01
Cable601 0.424 -0.186 -0.424 -0.009 0.2 -195.4 97.6 97.5 0.04
Cable610 -0.424 -0.010 0.424 0.009 0.0 -0.8 97.5 97.5 0.00
T41 0.424 0.010 -0.421 -0.001 2.6 9.1 97.5 96.9 0.62
Cable612 0.421 0.001 -0.420 0.000 1.4 0.7 96.9 96.6 0.32
Cable611 -0.420 0.000 0.421 0.001 1.4 0.7 96.6 96.9 0.32
Cable619 -0.161 0.000 0.162 0.000 0.3 0.1 96.4 96.6 0.17
Cable623 0.164 0.000 -0.164 0.000 0.3 0.1 96.6 96.4 0.17
T43 -0.164 0.000 0.166 0.002 1.6 2.4 96.6 97.6 0.95
Cable667 -0.085 -0.039 0.085 0.039 0.0 0.0 97.6 97.6 0.00
T44 0.085 0.039 -0.084 -0.037 0.9 1.4 97.6 96.1 1.44
Cable663 -0.085 -0.039 0.085 0.039 0.0 0.0 97.6 97.6 0.00
Cable668 -0.091 -0.039 0.091 0.039 0.0 0.0 97.5 97.5 0.00
T45 0.091 0.039 -0.090 -0.037 1.0 1.5 97.5 96.0 1.50
Cable622 -0.166 -0.002 0.166 0.001 0.0 -1.0 97.6 97.6 0.00
Cable665 -0.091 -0.039 0.091 0.039 0.0 0.0 97.5 97.5 0.00
Cable618 -0.163 -0.003 0.163 0.001 0.0 -1.3 97.5 97.5 0.00
T42 0.163 0.003 -0.162 0.000 1.6 2.3 97.5 96.6 0.94
T40 -0.421 -0.001 0.424 0.010 2.6 9.1 96.9 97.6 0.62
Cable609 -0.424 -0.010 0.424 0.009 0.0 -0.8 97.6 97.6 0.00
105.9 383.9
ETAP
Project: GERD HYDRO POWER PROJECT Page: 21
12.6.0H
Location: Date: 10-12-2016
Contract: SN:
Engineer: Revision: Base
Study Case: LF
Filename: GRANDRENAISSANCE1 Config.: Normal
% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Bus Voltage
OverVoltage 105.0 105.0
Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.)
Critical Report
MW Mvar MVA % PF
Number of Iterations: 1