I. General Requirement
Bidders’ statement
Specification requirement compliance with
comment.
1. General
The equipment bid upon shall be new, unused, current model of production, Comply
which is substantially the same as the model in successful use for not less than
one year or 2000 hours.
2. Language requirement
All documents, manuals, charts, drawings and manufacturer's specification Comply
literature included with the bid shall be in English.
3. Basic information
3.1. Bidders shall provide detailed clause-by-clause commentary to the entire
respective specification requirement. Failure to do so might result in rejection
of the bid.
3.2. The words “comply “or “satisfy” or “yes” or similar word alone may not be
adequate response where it is expected to respond in figures or in clear terms.
Failure to do so might result in rejection of the bid.
3.3. The equipment is expected to be made in accordance with current industry Comply
practices regardless of requirement being specified in this specification and/or
being fundamental or with merit point. Failure to fulfill standard features and
components might result in rejection of the offer /bid.
3.4. Bidder shall submit original manufacturer technical booklet, data sheet,
brochure, leaflet which tells about the product characteristics, test results or
specification describing in detail the unit bid upon including all standard and
optional equipment with the reference of known recognized international
standards.
3.5. The foot of each page of the specification with compliance & attached
brochure and any other technical details shall be signed & stamped by the
bidder/ supplier
4. Compliance to requirements
Bidders are expected to offer equipment from their product range that closely
meets the technical specification. However, bids, which do not comply, to the Comply
fundamental requirements described in this technical specification may be
rejected as non – responsive. Bids with higher performance and /or better
features than specified may be considered in bid evaluation even where such
preference has not been specified.
5. Service requirements
The equipment to be supplied will be used on various construction works in
Ethiopia where: -
• Climate varies from humid tropics to arid desert, Comply
• Temperatures vary from 0o c to 50oc
• Altitudes vary from sea level to 2500 meters above sea level.
6. Manufacturing requirement
6.1. Material used shall be free from defects, which would affect the performance
and maintainability of individual components or the overall assembly.
6.2. The unit and its components & accessories shall be designed and constructed Comply
to facilitate field maintenance. All adjustments & replaceable accessories shall
Portable primary crushing unit composed of vibrating feeder Feed hopper Comply
with grizzly, Jaw crusher, product belt conveyor and large Vibrating Feeder comply and see the attached
extended hopper for dump truck loading, mounted on standard file
trailer chassis and boogie. [fundamental]
Feed hopper .[fundamental]
Heavy-duty type, large self-standing extended hopper for
dump truck loading made of wear resistant steel plate.
Thickness of steel plate ; minimum 10mm. [fundamental]
Main hoper with extension hopper volume ; minimum 14
m3
Useful width at feeding end; minimum 3000 mm
Vibrating Feeder
The grizzly feeder shall be of heavy duty type spring supported
vibrating structure with remote controlled start /stop control
function. [fundamental]
Equipped with two grizzly sections/deck with bypass chute Jaw crusher comply and please refer the
for efficient removal of natural fines from the feed material attached file
and fines to bypass the jaw crusher.
Width; minimum 900mm.
Length; minimum 3600mm.
Capacity ; up to 200tph (minimum)
Feed end bottom lining shall be made of wear resistant
steel with minimum thickness of ; 10mm
Jaw crusher
Single toggle jaw crusher unit with high reduction ratio, long
stroke and steep nip angle to ensures good bite and good
material flow down in the cavity and with the following
features.
3..1. Main features
High-quality cast steel components, large eccentric shaft
and large spherical rollers.
Hydraulic setting adjustment ; [fundamental]
Centralized lubrication of the eccentric shaft bearings with
automatic lubrication unit.
Jaw plate; both fixed and movable jaw plates shall be made
of manganese steel alloys and shall be reversible type.
Shall have an overload release system.
Drive pulleys and flywheels shall be covered by safety
guards
3..2. General performance parameter .[fundamental]
Feed opening.[fundamental]
Intake width ; minimum 900mm
Intake depth ; minimum 600mm
Electric motor comply and please refer the
Maximum feed size: minimum 500 mm
attached file.
Fixed jaw length ;minimum 1200 mm
Chassis comply
Company Stamp: Authorizing Signature Page 6
of 16
E R A S p e c i fi c a ti o n f o r p o r t a b l e c r u s h e r ; 1 0 0 T P H March, 2022
[fundamental]
The electric circuits for motors shall be equipped with
contactors and additionally safe guarded by thermal
overload releases.
Control Panels shall consist but not limited to
7..1. Instrument.
Voltmeters.
Ammeters.
Frequency meter.
Hour meter
Potentiometer.
7..2. Operator panels shall consist but not limited to
Start/ stop key switch.
Voltmeter phase selector switch.
Ammeter phase selector switch.
Re-set switch.
Emergency stop switch
8. Required data and/or document [fundamental] Required data and/or document
The following data shall be specified by the bidder and certified [fundamental]
manufacture data sheet shall be attached. Comply
a) The crusher output for surface course.
b) The crusher output for base course.
c) Flow diagram for surface coarse and base coarse aggregate
shall be attached and shall indicate the process, production
(TPH) of throughput at every stage and end products, jaw
and cone crusher settings and load …
d) Plant layout (drawing) showing all the necessary dimension
and components with detail labeling must be submitted.
ERA requirement for grading of aggregate:
ERA requirement for grading of aggregate for base coarse &
surface coarse aggregate based on AASHTO T11 & T27,
percentage by weight passing square mesh sieves are the
following.
Base coarse
Nominal maximum aggregate size (mm)
Test sieve
Percentage passing sieve
(mm)
37.5mm 28mm 20mm
50 100 - -
37.5 95-100 100 -
28 - - 100
20 60-80 70-85 90-100
10 40-60 50-65 60-75
5 25-40 35-55 40-60
2.36 15-30 25-40 30-45
0.425 7-19 12-25 13-27
0.0745(1) 5-12 5-12 5-12
Company Stamp: Authorizing Signature Page 13
of 16
E R A S p e c i fi c a ti o n f o r p o r t a b l e c r u s h e r ; 1 0 0 T P H March, 2022
9. Additional features
Additional features and components which are not Comply
specifically mentioned in this specification but part of the
manufacturer standard offer shall be stated by indicating
the benefits and advantages.
Offers with higher performance and /or better features
shall Commissioning
10. Erection be valued and& considered
PerformanceinTest
bid evaluation even Comply
The successful bidder is required to erect & install the
complete plant at his full responsibility & expense at the
buyer work sites and test operates to prove the plant
capacity under condition prescribed.
The locations wherein the plant shall be erected/installed
are the following ERA Road maintenance districts quarry
site and specific location shall be within 100km range
(maximum) from the districts.
1. Alemegena district.
2. Combolcha district.
3. Shashemene district.
4. Debre markos district.
Commissioning & performance test shall be within four
weeks after the plant arrived at the work sites & informed
the same to the bidder.
The erection site plan with full details shall be provided by
the successful bidder prior to the shipment of the plant.
The erection cost shall include at least the following:
IV. Direct Costs related to assembling & installation
and performance test such as lubrication oil,
greases shall be covered by the bidder.
V. About 200 meters of electric cable, to be used
between power plant and switchgear in the
control panel.
VI. Training at the worksite
In operation of the unit bid to the
purchaser’s employee at least two
operators per plant.
In repair and maintenance of unit bid to
the buyer’s staff at least for three
technical persons per unit plant clause
No. 14 of the general requirement.
VII. Costs to perform the above mentioned duties
and responsibilities including round trips air
tickets fee, local transportation and board of the
manufacturer engineer(s) until the
commissioning date (if applicable)
VIII. The cost of such expenses shall be quoted
separately.
Company Stamp: Authorizing Signature Page 14
of 16
E R A S p e c i fi c a ti o n f o r p o r t a b l e c r u s h e r ; 1 0 0 T P H March, 2022
Notes:
I. Bidders are expected to attach drawing of screen with deck
arrangement by specifying the mesh size on each deck and
the position suggested to be fitted. The set of screen
required.