You are on page 1of 22

Project: ETAP Page: 1

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard

3-Phase Fault Currents

Swing V-Control Load Total

Number of Buses: 2 0 14 16

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total

Number of Branches: 1 0 0 12 0 1 14

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total

Number of Machines: 1 1 0 0 0 2

System Frequency: 60.00

Unit System: English

Project Filename: EDS LOS VADOS

Output Filename: G:\Mi unidad\01 Proyectos\08 Limas\20 Simulación 15 noviembre\Simulación ETAP EDS Los
Vados\EDS LOS VADOS\Untitled.SA1S
Project: ETAP Page: 2

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: ETAP Page: 3

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

+TGA Load 0.208 0.208 1 100.00 0.00


BT. Load 0.208 0.208 1 100.00 0.00
Bus2 Load 0.208 0.208 1 100.00 0.00
Bus3 Load 0.208 0.208 2 100.00 0.00
Bus4 SWNG 0.208 0.208 2 100.00 0.00
Bus8 Load 0.208 0.208 1 100.00 0.00
Bus10 Load 0.208 0.208 1 100.00 0.00
Bus11 Load 0.208 0.208 1 100.00 0.00
Bus12 Load 0.208 0.208 1 100.00 0.00
Bus13 Load 0.208 0.208 1 100.00 0.00
Bus14 Load 0.208 0.208 1 100.00 0.00
Bus15 Load 0.208 0.208 1 100.00 0.00
Bus16 Load 0.208 0.208 1 100.00 0.00
MT Load 13.200 13.200 1 100.00 0.00
PUNTO DE CONEXION SWNG 13.200 13.200 1 100.00 0.00
TRANFERENCIA. Load 0.208 0.208 1 100.00 0.00

16 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project: ETAP Page: 4

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

Line/Cable/Busway Input Data

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R X Y

Cable1 0.6MCUN1 4/0 9.8 0 1 75 0.06300 0.05100 0.0000000

Cable2 0.6MCUN1 4/0 49.2 0 1 75 0.06300 0.05100 0.0000000

Cable4 0.6MCUN1 4/0 6.6 0 1 75 0.06300 0.05100 0.0000000

Cable5 0.6MCUN1 4 32.8 0 1 75 0.31000 0.06000 0.0000000

Cable7 0.6MCUN1 8 39.4 0 1 75 0.78000 0.06500 0.0000000

Cable8 0.6MCUN1 8 26.2 0 1 75 0.78000 0.06500 0.0000000

Cable9 0.6MCUN1 8 39.4 0 1 75 0.78000 0.06500 0.0000000

Cable10 0.6MCUN1 12 49.2 0 1 75 2.00000 0.06800 0.0000000

Cable11 0.6MCUN1 8 16.4 0 1 75 0.78000 0.06500 0.0000000

Cable12 0.6MCUN1 8 16.4 0 1 75 0.78000 0.06500 0.0000000

Cable13 0.6MCUN1 1/0 49.2 0 2 75 0.12000 0.05500 0.0000000

Cable15 1.0NCUN1 2/0 689.0 0 1 75 0.09672 0.06523 0.0000000

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: ETAP Page: 5

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted

ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z

T1 0.150 13.200 0.208 5.75 2.47 0 0 0 0 0 5.7500


Project: ETAP Page: 6

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb

ID Type From Bus To Bus R X Z Y

T1 2W XFMR MT BT. 1438.53 3553.18 3833.33

Cable1 Cable BT. Bus2 143.32 116.02 184.40

Cable2 Cable Bus4 Bus3 716.62 580.12 922.00

Cable4 Cable TRANFERENCIA. +TGA 95.55 77.35 122.93

Cable5 Cable +TGA Bus8 2350.82 455.00 2394.45

Cable7 Cable +TGA Bus10 7097.97 591.50 7122.57

Cable8 Cable +TGA Bus11 4731.98 394.33 4748.38

Cable9 Cable +TGA Bus12 7097.97 591.50 7122.57

Cable10 Cable +TGA Bus13 22749.91 773.50 22763.05

Cable11 Cable +TGA Bus14 2957.49 246.46 2967.74

Cable12 Cable +TGA Bus15 2957.49 246.46 2967.74

Cable13 Cable +TGA Bus16 682.50 312.81 750.77

Cable15 Cable PUNTO DE CONEXION MT 3.82 2.58 4.61

COM Tie Switch TRANFERENCIA. Bus2


Project: ETAP Page: 7

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

Power Grid Input Data

% Impedance
Power Grid Connected Bus Rating 100 MVA Base
ID ID MVASC kV X/R R X

U1 PUNTO DE CONEXION 47.807 13.200 1.00 147.90960 147.90960

Total Connected Power Grids (= 1 ): 47.807 MVA

Synchronous Generator Input Data

% Impedance in Machine Base

Xd"
Synchronous Generator Connected Bus Rating X/R Ratio
ID Type ID MVA kV RPM X"/R X'/R R Adj. Tol. Xd'

Gen1 Steam Turbo Bus4 0.150 0.208 1800 19.00 19.00 1.000 19.00 0.0 28.00

Total Connected Synchronous Generators ( = 1 ): 0.150 MVA


Project: ETAP Page: 8

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

SHORT-CIRCUIT REPORT

3-phase fault at bus: +TGA

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

+TGA Total 0.00 2.740 -5.837 2.1 6.448

TRANFERENCIA. +TGA 2.86 2.740 -5.837 2.1 6.448

Bus8 +TGA 0.00 0.000 0.000 999.9 0.000

Bus10 +TGA 0.00 0.000 0.000 999.9 0.000

Bus11 +TGA 0.00 0.000 0.000 999.9 0.000

Bus12 +TGA 0.00 0.000 0.000 999.9 0.000

Bus13 +TGA 0.00 0.000 0.000 999.9 0.000

Bus14 +TGA 0.00 0.000 0.000 999.9 0.000

Bus15 +TGA 0.00 0.000 0.000 999.9 0.000

Bus16 +TGA 0.00 0.000 0.000 999.9 0.000

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 9

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: BT.

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

BT. Total 0.00 2.717 -6.328 2.3 6.887

Bus2 BT. 0.00 0.000 0.000 999.9 0.000

MT BT. 95.10 2.717 -6.328 2.3 6.887

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 10

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: Bus8

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus8 Total 0.00 3.186 -3.318 1.0 4.600

+TGA Bus8 39.68 3.186 -3.318 1.0 4.600

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 11

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: Bus10

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus10 Total 0.00 2.482 -1.248 0.5 2.778

+TGA Bus10 71.28 2.482 -1.248 0.5 2.778

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 12

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: Bus11

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus11 Total 0.00 2.963 -1.938 0.7 3.541

+TGA Bus11 60.57 2.963 -1.938 0.7 3.541

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 13

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: Bus12

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus12 Total 0.00 2.482 -1.248 0.5 2.778

+TGA Bus12 71.28 2.482 -1.248 0.5 2.778

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 14

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: Bus13

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus13 Total 0.00 1.090 -0.207 0.2 1.109

+TGA Bus13 90.98 1.090 -0.207 0.2 1.109

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 15

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: Bus14

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus14 Total 0.00 3.315 -2.870 0.9 4.384

+TGA Bus14 46.88 3.315 -2.870 0.9 4.384

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 16

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: Bus15

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus15 Total 0.00 3.315 -2.870 0.9 4.384

+TGA Bus15 46.88 3.315 -2.870 0.9 4.384

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 17

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: Bus16

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

Bus16 Total 0.00 2.901 -4.863 1.7 5.662

+TGA Bus16 15.32 2.901 -4.863 1.7 5.662

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 18

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: MT

Prefault voltage = 13.200 kV = 100.00 % of nominal bus kV (13.200 kV)


= 100.00 % of base (13.200 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

MT Total 0.00 1.453 -1.441 1.0 2.047 0.00 1.453 -1.441 1.0 2.047

PUNTO DE CONEXION MT 2.16 1.453 -1.441 1.0 2.047 2.16 1.453 -1.441 1.0 2.047

BT. MT 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 19

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: PUNTO DE CONEXION

Prefault voltage = 13.200 kV = 100.00 % of nominal bus kV (13.200 kV)


= 100.00 % of base (13.200 kV)

Contribution 1/2 Cycle 1.5 to 4 Cycle


From Bus To Bus %V kA kA Imag. kA Symm. %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude From Bus Real Imaginary /Real Magnitude

PUNTO DE CONEXION Total 0.00 1.479 -1.479 1.0 2.091 0.00 1.479 -1.479 1.0 2.091

MT PUNTO DE CONEXION 0.00 0.000 0.000 999.9 0.000 0.00 0.000 0.000 999.9 0.000

U1 PUNTO DE CONEXION 100.00 1.479 -1.479 1.0 2.091 100.00 1.479 -1.479 1.0 2.091

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 20

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

3-phase fault at bus: TRANFERENCIA.

Prefault voltage = 0.208 kV = 100.00 % of nominal bus kV (0.208 kV)


= 100.00 % of base (0.208 kV)

Contribution 1/2 Cycle


From Bus To Bus %V kA kA Imag. kA Symm.
ID ID From Bus Real Imaginary /Real Magnitude

TRANFERENCIA. Total 0.00 2.735 -6.026 2.2 6.617

+TGA TRANFERENCIA. 0.00 0.000 0.000 999.9 0.000

BT. Bus2 4.40 2.735 -6.026 2.2 6.617

*Bus2 TRANFERENCIA. 0.00 2.735 -6.026 2.2 6.617

NACD Ratio = 1.00

# Indicates a fault current contribution from a three-winding transformer.


* Indicates a fault current through a tie circuit breaker.
If the faulted bus is involved in loops formed by protection devices, the short-circuit contributions through these protective devices will not be reported.
Project: ETAP Page: 21

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

Momentary Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Momentary Device
Bus Device Duty Capability
Symm. X/R Asymm. Asymm. Symm. Asymm. Asymm.
ID kV ID Type kA rms Ratio M.F. kA rms kA Peak kA rms kA rms kA Peak

+TGA 0.208 +TGA Bus 6.448 2.1 1.051 6.777 11.206

BT. 0.208 BT. Bus 6.887 2.3 1.065 7.336 12.267

Bus8 0.208 Bus8 Bus 4.600 1.0 1.002 4.611 6.824

Bus10 0.208 Bus10 Bus 2.778 0.5 1.000 2.778 3.936

Bus11 0.208 Bus11 Bus 3.541 0.7 1.000 3.541 5.048

Bus12 0.208 Bus12 Bus 2.778 0.5 1.000 2.778 3.936

Bus13 0.208 Bus13 Bus 1.109 0.2 1.000 1.109 1.569

Bus14 0.208 Bus14 Bus 4.384 0.9 1.001 4.387 6.365

Bus15 0.208 Bus15 Bus 4.384 0.9 1.001 4.387 6.365

Bus16 0.208 Bus16 Bus 5.662 1.7 1.023 5.794 9.236

MT 13.200 MT Bus 2.047 1.0 1.002 2.050 3.016

PUNTO DE CONEXION 13.200 PUNTO DE CONEXION Bus 2.091 1.0 1.002 2.095 3.085

TRANFERENCIA. 0.208 TRANFERENCIA. Bus 6.617 2.2 1.056 6.989 11.607

- Method: IEEE - X/R is calculated from separate R & X networks.


- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

- The multiplication factors for high voltage circuit-breaker and high voltage bus momentary duty (asymmetrical and crest values) are calculated based on system X/R.

* Indicates a device with momentary duty exceeding the device capability.


Project: ETAP Page: 22

Location: 20.0.0C Date: 11-16-2022

Contract: SN:

Engineer: Revision: Base


Study Case: SC
Filename: EDS LOS VADOS Config.: Normal

Interrupting Duty Summary Report

3-Phase Fault Currents: (Prefault Voltage = 100 % of the Bus Nominal Voltage)

Bus Device Interrupting Duty Device Capability

CPT Symm. X/R Adj. Sym. Test Rated Adjusted


ID kV ID Type (Cy) kA rms Ratio M.F. kA rms kV PF Int. Int.
+TGA 0.208 Q3 Molded Case 6.448 2.1 1.024 6.604 0.600 50.00 10.000 10.000

Q4 Molded Case 6.448 2.1 1.000 6.448 0.240 20.00 85.000 85.000

Q5 Molded Case 6.448 2.1 1.000 6.448 0.240 20.00 85.000 85.000

Q6 Molded Case 6.448 2.1 1.000 6.448 0.240 20.00 85.000 85.000

Q7 Molded Case 6.448 2.1 1.000 6.448 0.240 20.00 85.000 85.000

Q8 Molded Case 6.448 2.1 1.000 6.448 0.240 20.00 85.000 85.000

Q9 Molded Case 6.448 2.1 1.000 6.448 0.240 20.00 85.000 85.000

Q10 Molded Case 6.448 2.1 1.000 6.448 0.240 20.00 85.000 85.000

Q2. Molded Case 6.448 2.1 1.000 6.448 0.240 20.00 85.000 85.000

BT. 0.208 6.887 2.3

Bus8 0.208 4.600 1.0

Bus10 0.208 2.778 0.5

Bus11 0.208 3.541 0.7

Bus12 0.208 2.778 0.5

Bus13 0.208 1.109 0.2

Bus14 0.208 4.384 0.9

Bus15 0.208 4.384 0.9

Bus16 0.208 5.662 1.7

MT 13.200 2.047 1.0

PUNTO DE CONEXION 13.200 2.091 1.0

TRANFERENCIA. 0.208 6.617 2.2

- Method: IEEE - X/R is calculated from separate R & X networks.


- HV CB interrupting capability is adjusted based on bus nominal voltage.
- Short-circuit multiplying factor for LV Molded Case and Insulated Case Circuit Breakers is calculated based on asymmetrical current.
- Generator protective device duty is calculated based on maximum through fault current. Other protective device duty is calculated based on total fault current.

* Indicates a device with interrupting duty exceeding the device capability


** Indicates that the circuit breaker has been flagged as a generator circuit breaker. However, ETAP could not detect a single path, without a transformer, to the specified generator.
Therefore, this circuit breaker is treated as a regular circuit breaker in short-circuit calculations.
+ The prefault voltage exceeds the rated maximum kV limit of the circuit breaker - The rated interrupting kA must be derated.

You might also like