You are on page 1of 13

Project: load flow analisis ETAP Page: 1

Location: tasikmalaya 19.0.1C Date: 04-14-2021


Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Electrical Transient Analyzer Program

Load Flow Analysis

Loading Category (1): Design

Generation Category (1): Design

Load Diversity Factor: None

Swing V-Control Load Total


Number of Buses: 1 1 8 10

Line/Cable/
XFMR2 XFMR3 Reactor Busway Impedance Tie PD Total
Number of Branches: 5 0 0 3 1 2 11

Method of Solution: Fast-Decoupled Method

Maximum No. of Iteration: 99

Precision of Solution: 0.0001000

System Frequency: 60.00 Hz

Unit System: English

Project Filename: adi sunandar_tugas2

Output Filename: C:\ETAP 1901\adi sunandar_tugas2\adisunandar.lfr


Project: load flow analisis ETAP Page: 2
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable / Busway Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable / Busway Resistance: Yes Individual


Project: load flow analisis ETAP Page: 3
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Bus Input Data

Load
Bus Initial Voltage Constant kVA Constant Z Constant I Generic

ID kV Sub-sys % Mag. Ang. MW Mvar MW Mvar MW Mvar MW Mvar

Bus1 34.500 1 100.0 0.0

Bus2 13.800 1 100.0 0.0 0.000 -1.000

Bus3 13.800 1 85.0 0.0

Bus4 13.800 1 100.0 0.0 3.400 2.107 0.850 0.527

Bus5 4.160 1 100.0 0.0 0.643 0.271

Bus6 4.160 1 100.0 0.0 2.935 1.187

Bus7 4.160 1 100.0 0.0 3.000 0.000

Bus8 0.480 1 100.0 0.0 0.266 0.115 0.040 0.000

Bus9 4.160 1 100.0 0.0

Bus10 0.480 1 100.0 0.0 0.267 0.142 0.134 0.021

Total Number of Buses: 10 7.512 3.822 4.024 -0.452 0.000 0.000 0.000 0.000

Generation Bus Voltage Generation Mvar Limits


ID kV Type Sub-sys % Mag. Angle MW Mvar % PF Max Min

Bus1 34.500 Swing 1 100.0 0.0

Bus3 13.800 Voltage Control 1 85.0 0.0 5.000 4.000 -1.000

5.000 0.000
Project: load flow analisis ETAP Page: 4
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Line/Cable/Busway Input Data

ohms or siemens/1000 ft per Conductor (Cable) or per Phase (Line/Busway)

Line/Cable/Busway Length

ID Library Size Adj. (ft) % Tol. #/Phase T (C) R X Y

Cable1 15MALS3 250 400.0 0.0 1 75 0.091348 0.043600

Cable2 5,0MCUS3 500 300.0 0.0 1 75 0.026706 0.040000

Cable3 5,0MALS3 500 100.0 0.0 1 75 0.049200 0.039400

Line / Cable / Busway resistances are listed at the specified temperatures.


Project: load flow analisis ETAP Page: 5
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift

ID Phase MVA Prim. kV Sec. kV % Z1 X1/R1 + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 3-Phase 30.000 34.500 13.800 7.00 23.70 0 0 0 0 0 7.0000 Dyn 0.000


T2 3-Phase 15.000 13.800 4.160 6.50 18.60 0 0 0 0 0 6.5000 Dyn 0.000
T3 3-Phase 5.000 13.800 4.160 6.50 12.14 0 0 0 0 0 6.5000 Dyn 0.000
T4 3-Phase 3.000 4.160 0.480 5.75 10.67 0 0 0 0 0 5.7500 Dyn 0.000
T5 3-Phase 5.000 4.160 0.480 6.75 12.14 0 0 0 0 0 6.7500 Dyn 0.000
Project: load flow analisis ETAP Page: 6
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Impedance Input Data

Impedance Positive Sequence Impedance


ID R X Y Unit

Z1 1.0000000 1.0000000 0.0000000 % in 34.500 kV base and 100.0 MVA base


Project: load flow analisis ETAP Page: 7
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVA Base


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus2 0.98 23.31 23.33

T2 2W XFMR Bus2 Bus6 2.33 43.27 43.33

T3 2W XFMR Bus3 Bus5 10.67 129.56 130.00

T4 2W XFMR Bus5 Bus8 17.88 190.83 191.67

T5 2W XFMR Bus9 Bus10 11.08 134.54 135.00

Cable1 Cable Bus2 Bus3 1.92 0.92 2.13

Cable2 Cable Bus6 Bus7 4.63 6.93 8.34

Cable3 Cable Bus7 Bus9 2.84 2.28 3.64

Z1 Impedance Bus3 Bus4 6.25 6.25 8.84

CB4 Tie Breakr Bus7 Bus5

CB5 Tie Breakr Bus10 Bus8


Project: load flow analisis ETAP Page: 8
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

LOAD FLOW REPORT

Bus Voltage Generation Load Load Flow XFMR


ID kV % Mag. Ang. MW Mvar MW Mvar ID MW Mvar Amp %PF %Tap

* Bus1 34.500 100.000 0.0 6.421 4.732 0.000 0.000 Bus2 6.421 4.732 133.5 80.5

Bus2 13.800 98.844 -0.8 0.000 0.000 0.000 -0.977 Bus3 1.173 4.104 180.6 27.5

Bus1 -6.415 -4.584 333.7 81.4

Bus6 5.242 1.457 230.3 96.3

Bus3 13.800 98.784 -0.8 5.000 -1.000 0.000 0.000 Bus2 -1.169 -4.102 180.6 27.4

Bus4 4.238 2.633 211.3 84.9

Bus5 1.931 0.469 84.2 97.2

Bus4 13.800 98.349 -0.9 0.000 0.000 4.222 2.617 Bus3 -4.222 -2.617 211.3 85.0

Bus5 4.160 97.991 -2.3 0.000 0.000 0.643 0.271 Bus3 -1.927 -0.417 279.2 97.7

Bus8 0.292 0.119 44.7 92.6

Bus7 0.992 0.027 140.5 100.0

Bus6 4.160 98.109 -2.2 0.000 0.000 2.935 1.187 Bus7 2.300 0.139 325.9 99.8

Bus2 -5.235 -1.326 763.9 96.9

Bus7 4.160 97.991 -2.3 0.000 0.000 2.881 0.000 Bus6 -2.297 -0.135 325.9 99.8

Bus9 0.408 0.163 62.2 92.9

Bus5 -0.992 -0.027 140.5 100.0

Bus8 0.480 97.707 -2.6 0.000 0.000 0.304 0.115 Bus5 -0.292 -0.117 387.0 92.8

Bus10 -0.013 0.002 15.8 -98.6

Bus9 4.160 97.975 -2.3 0.000 0.000 0.000 0.000 Bus7 -0.408 -0.163 62.2 92.9

Bus10 0.408 0.163 62.2 92.9

Bus10 0.480 97.707 -2.6 0.000 0.000 0.395 0.162 Bus9 -0.408 -0.160 539.4 93.1

Bus8 0.013 -0.002 15.8 -98.6


* Indicates a voltage regulated bus ( voltage controlled or swing type machine connected to it)
# Indicates a bus with a load mismatch of more than 0.1 MVA
Project: load flow analisis ETAP Page: 9
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Bus Loading Summary Report

Directly Connected Load Total Bus Load

Bus Constant kVA Constant Z Constant I Generic


Percent
ID kV Rated Amp MW Mvar MW Mvar MW Mvar MW Mvar MVA % PF Amp Loading

Bus1 34.500 7.976 80.5 133.5


Bus2 13.800 0.000 0.000 -0.977 8.489 75.6 359.3
Bus3 13.800 0.000 0.000 7.408 83.3 313.8
Bus4 13.800 3.400 2.107 0.822 0.510 4.967 85.0 211.3
Bus5 4.160 0.643 0.271 1.971 97.7 279.2
Bus6 4.160 2.935 1.187 5.400 96.9 763.9
Bus7 4.160 2.881 3.293 99.9 466.4
Bus8 0.480 0.266 0.115 0.038 0.326 93.3 401.6
Bus9 4.160 0.000 0.439 92.9 62.2
Bus10 0.480 0.267 0.142 0.128 0.020 0.439 92.9 540.3

* Indicates operating load of a bus exceeds the bus critical limit (100.0% of the Continuous Ampere rating).
# Indicates operating load of a bus exceeds the bus marginal limit (95.0% of the Continuous Ampere rating).
Project: load flow analisis ETAP Page: 10
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Branch Loading Summary Report

Transformer
CKT / Branch Busway / Cable & Reactor
Loading (input) Loading (output)
Ampacity Loading Capability
ID Type (Amp) Amp % (MVA) MVA % MVA %

Cable1 Cable 214.78 180.65 84.11

Cable2 Cable 391.10 325.94 83.34

Cable3 Cable 293.89 62.24 21.18

T1 Transformer 30.000 7.976 26.6 7.884 26.3

T2 Transformer 15.000 5.441 36.3 5.400 36.0

T3 Transformer 5.000 1.987 39.7 1.971 39.4

T4 Transformer 3.000 0.315 10.5 0.314 10.5

T5 Transformer 5.000 0.439 8.8 0.438 8.8

* Indicates a branch with operating load exceeding the branch capability.


Project: load flow analisis ETAP Page: 11
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Branch Losses Summary Report

Vd
From-To Bus Flow To-From Bus Flow Losses % Bus Voltage
% Drop
Branch ID MW Mvar MW Mvar kW kvar From To in Vmag

Cable1 1.173 4.104 -1.169 -4.102 3.6 1.7 98.8 98.8 0.06

Cable2 2.300 0.139 -2.297 -0.135 2.6 3.8 98.1 98.0 0.12

Cable3 0.408 0.163 -0.408 -0.163 0.1 0.0 98.0 98.0 0.02

T1 6.421 4.732 -6.415 -4.584 6.3 148.3 100.0 98.8 1.16

T2 5.242 1.457 -5.235 -1.326 7.0 131.1 98.8 98.1 0.74

T3 1.931 0.469 -1.927 -0.417 4.3 52.4 98.8 98.0 0.79

T4 0.292 0.119 -0.292 -0.117 0.2 2.0 98.0 97.7 0.28

T5 0.408 0.163 -0.408 -0.160 0.2 2.7 98.0 97.7 0.27

Z1 4.238 2.633 -4.222 -2.617 15.9 15.9 98.8 98.3 0.43

40.2 358.0
* This Transmission Line includes Series Capacitor.
Project: load flow analisis ETAP Page: 12
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

Alert Summary Report

% Alert Settings
Critical Marginal
Loading
Bus 100.0 95.0
Cable / Busway 100.0 95.0
Reactor 100.0 95.0
Line 100.0 95.0
Transformer 100.0 95.0
Panel 100.0 95.0
Protective Device 100.0 95.0
Generator 100.0 95.0
Inverter/Charger 100.0 95.0

Bus Voltage
OverVoltage 105.0 102.0
UnderVoltage 95.0 98.0

Generator Excitation
OverExcited (Q Max.) 100.0 95.0
UnderExcited (Q Min.) 100.0

Critical Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Gen1 Generator Under Excited -1.000 Mvar -1.000 0.0 3-Phase

Marginal Report

Device ID Type Condition Rating/Limit Unit Operating % Operating Phase Type

Bus10 Bus Under Voltage 0.480 kV 0.469 97.7 3-Phase

Bus5 Bus Under Voltage 4.160 kV 4.076 98.0 3-Phase

Bus7 Bus Under Voltage 4.160 kV 4.076 98.0 3-Phase

Bus8 Bus Under Voltage 0.480 kV 0.469 97.7 3-Phase

Bus9 Bus Under Voltage 4.160 kV 4.076 98.0 3-Phase


Project: load flow analisis ETAP Page: 13
Location: tasikmalaya 19.0.1C Date: 04-14-2021
Contract: SN:
Engineer: adi sunandar Revision: Base
Study Case: LF
Filename: adi sunandar_tugas2 Config.: Normal

SUMMARY OF TOTAL GENERATION , LOADING & DEMAND

MW Mvar MVA % PF

Source (Swing Buses): 6.421 4.732 7.976 80.50 Lagging

Source (Non-Swing Buses): 5.000 -1.000 5.099 98.06 Leading

Total Demand: 11.421 3.732 12.015 95.05 Lagging

Total Motor Load: 7.512 3.822 8.428 89.13 Lagging

Total Static Load: 3.869 -0.447 3.895 99.34 Leading

Total Constant I Load: 0.000 0.000 0.000

Total Generic Load: 0.000 0.000 0.000

Apparent Losses: 0.040 0.358

System Mismatch: 0.000 0.000

Number of Iterations: 5