Project: Basic Drawing

ETAP Page: 1
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

Electrical Transient Analyzer Program

Short-Circuit Analysis

ANSI Standard
3-Phase, LG, LL, & LLG Fault Currents
1/2 Cycle Network

Swing V-Control Load Total


Number of Buses: 1 0 2 3

XFMR2 XFMR3 Reactor Line/Cable Impedance Tie PD Total


Number of Branches: 1 0 0 1 0 0 2

Synchronous Power Synchronous Induction Lumped


Generator Grid Motor Machines Load Total
Number of Machines: 0 1 0 1 0 2

System Frequency: 50.00 Hz

Unit System: English

Project Filename: YOPPI MARTA FIRDAUS NO 5

Output Filename: E:\UMS\UAS TEKKOM\NEW NEW NO 5 TEKKOM\YOPPI MARTA FIRDAUS SC BUS


3.SA2
Project: Basic Drawing
ETAP Page: 2
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

Adjustments

Apply Individual
Tolerance Adjustments /Global Percent

Transformer Impedance: Yes Individual

Reactor Impedance: Yes Individual

Overload Heater Resistance: No

Transmission Line Length: No

Cable Length: No

Apply Individual
Temperature Correction Adjustments /Global Degree C

Transmission Line Resistance: Yes Individual

Cable Resistance: Yes Individual


Project: Basic Drawing
ETAP Page: 3
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

Bus Input Data

Bus Initial Voltage


ID Type Nom. kV Base kV Sub-sys %Mag. Ang.

Bus1 SWNG 40.000 40.000 1 100.00 0.00

Bus2 Load 6.600 6.600 1 100.00 -30.00

Bus3 Load 6.600 6.600 1 100.00 -30.00

3 Buses Total

All voltages reported by ETAP are in % of bus Nominal kV.


Base kV values of buses are calculated and used internally by ETAP .
Project: Basic Drawing
ETAP Page: 4
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

Line/Cable Input Data

Ohms or Siemens per 1000 ft per Conductor (Cable) or per Phase (Line)

Line/Cable Length

ID Library Size Adj. (ft) % Tol. #/Phase T (°C) R1 X1 Y1 R0 X0 Y0


Cable1 0.6MCUN3 6 1000.0 0.0 1 75 0.51 0.04375 1.6065 0.10763

Line / Cable resistances are listed at the specified temperatures.


Project: Basic Drawing
ETAP Page: 5
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

2-Winding Transformer Input Data

Transformer Rating Z Variation % Tap Setting Adjusted Phase Shift


ID MVA Prim. kV Sec. kV %Z X/R + 5% - 5% % Tol. Prim. Sec. %Z Type Angle

T1 5.000 40.000 6.600 7.50 12.14 0 0 0 0 0 7.5000 Dyn 30.000

2-Winding Transformer Grounding Input Data

Grounding

Transformer Rating Conn. Primary Secondary


ID MVA Prim. kV Sec. kV Type Type kV Amp Ohm Type kV Amp Ohm

T1 5.000 40.000 6.600 D/Y Solid


Project: Basic Drawing
ETAP Page: 6
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

Branch Connections

CKT/Branch Connected Bus ID % Impedance, Pos. Seq., 100 MVAb


ID Type From Bus To Bus R X Z Y

T1 2W XFMR Bus1 Bus2 12.31 149.49 150.00

Cable1 Cable Bus2 Bus3 117.08 10.04 117.51


Project: Basic Drawing
ETAP Page: 7
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

Power Grid Input Data

% Positive Seq. Impedance % Zero Seq. Impedance


Power Grid Connected Bus Rating 100 MVA Base Grounding 100 MVA Base
ID ID MVASC kV X/R R X Type X/R R0 X0

PLN Bus1 100.000 40.000 20.00 4.99376 99.87524 Wye - Solid 20.00 4.993761 99.87521

Total Power Grids (= 1 ) 100.000 MVA


Project: Basic Drawing
ETAP Page: 8
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

Induction Machine Input Data

Induction Machine Rating (Base) Positive Seq. Imp. Grounding Zero Seq. Imp.
ID Type Qty kVA kV RPM X"/R %R % X" % X' Conn. Type Amp X/R % R0 % X0

Mtr1 Motor 1 226.37 6.600 1500 11.18 1.652 18.46 46.15 Wye Open 11.18 1.652 18.46

Total Connected Induction Machines ( = 1 ): 226.4 kVA


Project: Basic Drawing
ETAP Page: 9
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

SHORT- CIRCUIT REPORT

Fault at bus: Bus3

Prefault voltage = 6.600 kV = 100.00 % of nominal bus kV ( 6.600 kV)


= 100.00 % of base kV ( 6.600 kV)

Positive & Zero Sequence Impedances


Contribution 3-Phase Fault Line-To-Ground Fault Looking into "From Bus"
From Bus To Bus %V kA % Voltage at From Bus kA Symm. rms % Impedance on 100 MVA base
ID ID From Bus Symm. rms Va Vb Vc Ia 3I0 R1 X1 R0 X0

Bus3 Total 0.00 3.093 0.00 87.22 128.57 2.822 2.822 1.27E+002 2.53E+002 3.81E+002 1.74E+002

Bus2 Bus3 40.22 2.994 64.20 90.62 102.56 2.762 2.822 1.34E+002 2.59E+002 3.81E+002 1.74E+002
Mtr1 Bus3 100.00 0.107 100.00 100.00 100.00 0.065 0.000 7.30E+002 8.16E+003

# Indicates fault current contribution is from three-winding transformers

* Indicates a zero sequence fault current contribution (3I0) from a grounded Delta- Y transformer
Project: Basic Drawing
ETAP Page: 10
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

Short-Circuit Summary Report

1/2 Cycle - 3-Phase, LG, LL, & LLG Fault Currents

Prefault Voltage = 100 % of the Bus Nominal Voltage

Bus 3-Phase Fault Line-to-Ground Fault Line-to-Line Fault *Line-to-Line-to-Ground


ID kV Real Imag. Mag. Real Imag. Mag. Real Imag. Mag. Real Imag. Mag.

Bus3 6.60 1.387 -2.765 3.093 1.926 -2.063 2.822 2.395 1.201 2.679 -3.407 -0.516 3.446

All fault currents are symmetrical momentary (1/2 Cycle network) values in rms kA

* LLG fault current is the larger of the two faulted line currents
Project: Basic Drawing
ETAP Page: 11
12.6.0H
Location: SURABAYA KEPUTIH Date: 18-01-2021
Contract: SN:
Engineer: YOPPI MARTA FIRDAUS Revision: Base
Study Case: SC
Filename: YOPPI MARTA FIRDAUS NO 5 Config.: Normal

Short-Circuit Summary Report

Bus Positive Sequence Imp. (ohm) Negative Sequence Imp. (ohm) Zero Sequence Imp. (ohm)
ID kV Resistance Reactance Impedance Resistance Reactance Impedance Resistance Reactance Impedance

Bus3 6.600 0.55227 1.10111 1.23185 0.55227 1.10111 1.23185 1.66014 0.75882 1.82534