You are on page 1of 1

ITEMS TO BE

CALCULATIONS
ESTIMATED

A. FOUNDATION VOLUME:
LENGTH (TOTAL) = 12.2 M
THICKNESS = 0.2 M
WIDTH = 0.4 M
VOLUME = 0.976 M3
10% ALLOWANCE 1.0736 M3

USE 1:2:3 CONCRETE MIXTURE CLASS AA


CEMENT 10.46 PER M3
SAND 0.42 PER M3
GRAVEL 0.82 PER M3

40KG BAGS OF CEMENT = 11.229856 PCS SAY


VOLUME OF SAND = 0.40992 M3 SAY
VOLUME OF GRAVEL = 0.80032 M3 SAY

LABOR:
OUTPUT = 0.91 M3/MAN DAY
LABOR RATE = 450 PHP
MANPOWER = 2 LABOR
1 MASON

You might also like